Subbase D dock Inc. Invoice
Subbase Date Invoice #
4/231/015 68 12
Bill To: Customer Phone
LSJ,LLC Customer Fax
Customer E-mail
accept cash.
No. Project
Pro Terms chec s. major cred t cards. travelers
checks and wired funds. More info
Ann Roscoe Big N/LSJ Barge Upon Com plet ion available regarding wired monies.
IN
Qty/H rs Description Rate Amount
REVISED 05/04/2015
Subbase and Island Rigging and Hydraulics reviewed projects that were on your "to do list"
this morning. I will list all projects that I can with a quote for each repair but first I would
like to comment on the condition of the LSJ Barge.
This vessel was hauled out at ow yard three years ago . During that haul out Subbase
quoted on most of the items you have in this current list. It was surprising to see that our
recommendations were not completed and as a result the current condition of the vessel is
not seaworthy. The overall appearance of the vessels is that it looks neglected and repairs
that were essential were cobbled together in an effort to get by.
The LSJ Barge needs a major overhaul to make her seaworthy and to ensure an extended
service life.
Subbase in not interested in making any repairs that will not be done properly; nor are we
interested in patching anything together for a temporary fix.
I understand that some projects may be more important then others so I will try to list each
project individually.
1 Drydock hauling fees 1,500.00 1,500.00
45 Laydays: Approx 45 250.00 11,250.00
I Electricity Fee: Hook Up 75.00 75.00
45 Electricity Fee: per day 60.00 2,700.00
1 5000 psi pressure wash 327.00 327.00
Thank you for your business. Total
Please note Subbase Drydock Inc. reserves the right to not release any
Payments/Credits
part/parts, projects or vessels for which/ on which the above detailed work
has been performed untilpayment in full is received.
Balance Due
Page 1
EFTA01196975
Subbase D dock Inc. Invoice
162 Subbase Date Invoice #
-I/231/015 6x12
Bill To: Customer Phone
LSJ,LLC Customer Fax
Customer E-mail
We accept c sh.
No Project Terms checks. major credit cards. travelers
checks and wired fun s. More info
Ann Roscoe Big N/LSJ Barge Upon Com plet ion available regarding wired monies.
a
Qty/Hrs Description Rate Amount
I I & 2. )Rudders: Subbase personnel examined the rudder room and we were able see major 45,000.00 45,000.00
corrosion on the transom. The hull plating has holes where sea water is seeping into the
vessel. The steering
components need to be removed and cleaned, the rudders need to be removed and serviced.
The lower Pintle and gudgeons need service as well as the rudder stuffing box. Upon
removing the rudders Subbase Drydock has determined that the bolt holes on each of the
flanges on the rudders have been severely worn and have to be cropped out and replaced
with new. In addition the tiller arm quadrants are completely rusted and not salvageable
these have to be replaced. We have cut out the corroded plating on the stern and in doing so
we had to remove the stern rubrail. All the hardware for the rub rail i.e....bolts and nuts...
have to be replaced and new hardware used to reinstall rub rail. $45,000 includes labor and
material
I 3-A.) Install two cylinders with stainless steel shafts; including allhoses back to engine 95.000.00 95.000.00
room, with stainless steel ends on all hoses. Upon inspecting the engine room all the
hydraulic lines have to be replaced this includes the steering hydraulics and pump. Labor
and Materials will be $95,000 Please contact Island Rigging and Hydraulics for a more
detailed estimate.
I 3-B.) The steel boxes that secure the cylinders to the hull are deteriorated and will need 16.000.00 16.000.00
replacement. Subbase recommends using stainless steel to eliminate the corrosion. Three
years ago we quoted $16,000.00 for both boxes and we will still honor this quote.
Thank you for your business. Total
Please note Subbase Drydock Inc. reserves the right to not release any
Payments/Credits
part/parts, projects or vessels for which/ on which the above detailed work
has been performed untilpayment in full is received.
Balance Due
Page 2
EFTA01196976
Subbase D dock Inc. Invoice
Parcel 162 Subbase Date Invoice #
4/23/2015 6812
Bill To: Customer Phone
LSJ,LLC Customer Fax
Customer E-mail
We accept c sh.
No Project Terms chec s. major credit cards. travelers
checks and wired fun s. More info
Ann Roscoe Big N/LSJ Barge Upon Com plef ion available regarding wired moles.
Qty/Hrs Description Rate Amount
I 4.) The exhaust system is in a non-repairable condition and needs replacement from the 24,500.00 24,500.00
main engine to the hull outlet. Our quote will include all new piping, flex joints, exhaust
mixers, and new exterior
aluminum outlet. When system is complete it will be wrapped with a removable wire mesh
hi-temp blanket. The new system will be much quieter than the existing exhaust system.
Labor and material $24,500
I 5.) Engine mounts need to be de-scaled ofrust. Bolts holding mounts need to be cleaned or 7,000.00 7,000.00
renewed and alignment from coupling to shaft needs to be checked and adjusted for proper
tolerances. An extensive review was completed of this drive train back in 2012 with repair
recommendations made at that time. (before exhaust system is finalized this alignment must
be done). 7000 Labor and Material
I 6.) Stuffing boxes: Subbase was informed that new stuffing boxes are on hand and will be 5,000.00 5,000.00
owner supplied, after haulout removal ofhose joining stuffing box to shaft log will reveal
the condition of shaft log. I would reserve 5k for this project.
I 7.) Cutless bearings require removal of main shafts and propellers: After removal of 4.150.00 4.150.00
coupling, shafts and props a condition report will follow if drive train is serviceable the
routine maintenance for renewing cutless bearing will only need attention. Labor and
material for this is (both port and starboard) $4,150.00.
I 8.) Engine Cooling Grid: Pressure test system and issue report for this service. Reserve 1,200.00 1,200.00
$1,200.00
I 9.) Bottom paint and barrier coat: Labor and material $7,500.00. 7,500.00 7,500.00
Thank you for your business. Total
Please note Subbase Drydock Inc. reserves the right to not release any
Payments/Credits
part/parts, projects or vessels for which/ on which the above detailed work
has been performed untilpayment in full is received.
Balance Due
Page 3
EFTA01196977
Subbase D dock Inc. Invoice
Parcel 162 Subbase Date Invoice #
3/23/2015 6812
Bill To: Customer Phone
LSJ,LLC Customer Fax
Customer E-mail
We accept c sh.
No Project Terms checks. major credit cards. travelers
checks and wired fun s. More info
Ann Roscoe Big N/LSJ Barge Upon Com plef ion available regarding wired moles.
a
Qty/Hrs Description Rate Amount
10.) Engine and marine gear - Review upon haul out -- QUOTE WILL BE ISSUED -- 0.00 0.00
I 11.) Fuel tank: Cleaning and disposal 2,800.00 2,800.00
I 19.) Clean engine room: Before any repairs are started clean and degrease entire engine 5,500.00 5,500.00
room, dispose of oily water. After repairs are complete clean and paint engines and any
other areas that were painted.
Remove engine hatch covers and assess condition. Make necessary repairs and reinstall
after all. Labor and material $5,500.00
I 20.) Hydraulic Tank: Due to severe corrosion of the steel hydraulic tank, Subbase 5,000.00 5,000.00
reccomends replacing tank with new marine grade aluminum tank complete with all
necessary fittings and sight glass to view
levels. Labor and Materials.
I 21.) Engine Room Wiring: Upon an inspection of the engine room, Subbase Drydock has 37.000.00 37.000.00
determined that all of the engine room wiring is compromised. We will strip all the wiring
and renew all bilge pumps, engien room blowers, lighting and batteries. This also includes
running new gauges to pilot house and all new wiring to instrument control panel.
Repairing 24 volt alternator and adding second one to port engine. Labor and Materials.
I Shipping and Freight Charges 2.500.00 2.500.00
***One-third due at mobilization, one-third at 50% completion and balance at
completion***
Thank you for your business. Total
Please note Subbase Drydock Inc. reserves the right to not release any
Payments/Credits
part/parts, projects or vessels for which/ on which the above detailed work
has been performed untilpayment in full is received.
Balance Due
Page 4
EFTA01196978
Subbase D dock Inc. Invoice
Parcel 162 Subbase Date Invoice #
4/23/2015 6812
Bill To: Customer Phone
LSJ,LLC Customer Fax
Customer E-mail
No. Project Terms We accept
checks, major cash. travelers
credt cards,
checks and wired funds. More info
Ann/Boscoe Big N/LSJ Barge t r POn Completion available regarding wired monies.
Qty/Hrs Description Rate Amount
Discount - as negotiated -14,002.00 -14,002.00
Thank you for your business. Total $260,000.00
Please note Subbase Drydock Inc. reserves the right to not release any
Payments/Credits -$201,157.00
part/parts, projects or vessels for which/ on which the above detailed work
has been performed untilpayment inInn is received.
Balance Due $58,843.00
Page 5
EFTA01196979
ℹ️ Document Details
SHA-256
b60f3f33a148fa483f9052033b75c3213512e194f5f25524df8a462c6acd826c
Bates Number
EFTA01196975
Dataset
DataSet-9
Document Type
document
Pages
5
Comments 0