EFTA00966641.pdf
👁 1
💬 0
📄 Extracted Text (140 words)
From: Daphne Wallace
To: Jeffrey Epstein <[email protected]>
Cc: Roy Hodges Rich Kahn
Subject: Photographs - August 16, 2013
Date: Fri, 16 Aug 2013 20:41:04 +0000
Attachments: Hydroseeded_hillsides_(1).JPG; Hydroseeded_hillsides_(2).JPG;
Hydroseeded_hillsides_(3).JPG; Hydroseeded_hillsides_(4).JPG;
Hydroseeded_hillsides_(5).JPG; Hydroseeded_hillsides_(6).JPG;
Hydroseeded_hillsides_(7).JPG; Hydroseeded_hillsides_(8).JPG;
Hydroseeded_hillsides_(9).JPG; Hydroseeded_hillsides_(10).JPG;
Hydroseeded_hillsides_(11).JPG; Hydroseeded_hillsides_(I 2).JPG;
Hydroseeded_hillsides_(I 3).JPG; Hydroseeded_hillsides_(14).JPG;
Hydroseeded_hillsides_(I 5).JPG; Hydroseeded_hillsides_(16).JPG;
Hydroseeded_hillsides_(17).JPG; Hydroseeded_hillsides_(18).JPG;
Hydroseeded 9).JPG; Hydroseeded_hillsides_(20).JPG;
Tree_trinuning_and_irrigation_in_progress_(1).JPG;
Tree_trimming_and_irrigation_in_progress_(2).JPG;
Tree_trimming_and_irrigation_in_progress_(3).JPG;
Tree trimming_and_irrigation_in_progress_(4).JPG; Palms_trimmed_(1).JPG;
Palms_trimmed_(2).JPG; Palms_trimmed_(3).JPG; Palms_trimmed_(4).JPG;
Palms_trimmed_(5).JPG; Palms_trimmed_(6).JPG; Palms_trimmed_(7).JPG;
Palms_trimmed_(8).JPG; Mechanical_area_lower_gates_(1).JPG;
Mechanical_area_lower_gates_(2).JPG; Mechanical_area_lower_gates_(3).JPG;
Mechanical_area_lower_gates_(4).JPG; Mechanical_area_lower_gates_(5).JPG;
Mechanical_area_lower_gates_(6).JPG;
Poured_columns_for new_Woodshop_tunnel_gates_(1).JPG;
Poured_columns_for new_Woodshop_tunnel_gates_(2).JPG;
Poured_columns_for new_Woodshop_tunnel_gates_(3).JPG;
Poured_columns_for new_Woodshop_tunnel_gates_(4).JPG; Kawasaki_mules_(1).JPG;
ICawasaki_mules_(2).JPG; Kawasaki_mules_(3).JPG; Sprayer_on_site_(1).JPG;
Sprayer on_site_(2).JPG; Thinset_on_site.JPG;
Office_Pavilion_and_Master suite_roof_painting_completed_(1).JPG;
Office_Pavilion_and_Master suite_roof_painting_completed_(2).JPG;
Office_Pavilion_and_Master suite_roof_painting_completed_(3).JPG
Greetings Mr. Epstein,
August 16 photographs for your review and comments:
Hydroseeded hillsides
Tree trimming and irrigation progress
Palms trimmed
Mechanical area lower gates
Columns poured for new Woodshop tunnel gates
Kawasaki mules, sprayer, thinset on site
Office Pavilion and Master suite roof painting completed
Respectfully submitted,
Daphne
EFTA00966641
EFTA00966642
ℹ️ Document Details
SHA-256
b616df6ff249c252f305caa3ae7dfff5280d4cb3650e1c5a633e157297d6e94f
Bates Number
EFTA00966641
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0