📄 Extracted Text (196 words)
From: brice gordon
To: Jeffrey Epstein <[email protected]>
Cc: Rich Kahn Zorro Ranch
Subject: Landscaping Zorro
Date: Thu, 01 Nov 2012 15:57:30 +0000
Attachments: 12_Zorro_INSTALL_10-30-1.xls; Zorro_Plant_Material.xlsx; photo_1.JPG; photo_2.JPG;
photo_3.JPG; photo_4.JPG; photo_5.JPG; photo_1(1).JPG; photo_2(1).JPG;
photo_3(1).JPG; photo_4(1).JPG; photo_5(1).JPG; photo_1(2).JPG; photo_2(2).JPG;
photo_3(2).JPG; photo_4(2).JPG; photo_5(2).JPG
Jeffrey
Attached for your review is the revised proposal from Aspen Landscaping, Plant Material price comparison and
photos.
The plant material is based upon the direction you gave during your last visit.
Also attached is plant material pricing comparisons from two local companies in ABQ
Jericho Nursery plant material was of a very high standard, compared to Plant World which I thought was
average.
Please note that each plant will require a new drip line to it hence the cost for irrigation.
Zorro Ranch will provide top soil, at least 4 dump truck loads and Aspen will provided the fertilizer etc to add to
mix.
All the beds that have been cleared of plant material will need to have 12 to 18 inches of soil removed first and
then new amend topsoil added mix added.
Pecan mulch will be applied at the end to finish off.
Rich has yet to review
Brice Gordon
VI
ism
EFTA00947114
ℹ️ Document Details
SHA-256
b7bbe39871dd31a99a638f85fca0ae64c75441493f75d817e7d7c37b309517ab
Bates Number
EFTA00947114
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0