EFTA01821922.pdf

DataSet-10 2 pages 533 words document
P23
👁 1 💬 0
📄 Extracted Text (533 words)
To: Stephen Caplingeri l From: Jeffrey Epstein Sent Sat 12/26/2009 4:53:38 PM Subject: Re: LSJ the sketch up was the first time i could sec how disorganized the elevations were. my fault. On Sat, Dcc 26, 2009 at 10:31 AM, Stephen Caplinger e > wrote: Forwarded message From: Stephen Caplinger c: =. Date: Sat, Dec 26, 2009 at 8:45 AM Subject: LSJ Jeffrey: It greatly concerns me that you are disappointed so I wanted to address your concerns. In regard to the Office Pavilion entry landscaaping, We proceeded to construction only because we felt that we had you approval. I felt that we had your approval and go ahead after we submitted the final design plans which were based on several preliminary concept plan submittals. You even made the comment that we don't need to show you the plans again and we should consider it approved for construction. I want to assure you that I would never proceed to construction on anything without first having your approval. On the Kite House, I know you like to see photo overlay sketches, but all we've done is conceptual floor plans & site plans. As soon as I can I'll prepare additional photo sketches for your review on the exterior views & orientation. Going forward, I want to make absolutely sure that you are happy with what we are doing and that you feel that we've given you enough design information to make decisions. I would hope that we we will be able to walk through with you the various designs when we are together with Gary on LSJ. I believe that we can better communicate in person and on site. In the future, I will strive to give you better design concepts that are on photo overlays and to send hard copiesin addition to email attachements. I plan on being back on LSJ during the week of 1/4/10 - 1/8/10 so we should definitely get together to walk through all of the landscape issues so that I am totally clear on your vision. I don't have any doubt that we can produce your vision on the island, I just feel we have a communication issue. Meanwhile, I am working on the Coastal Zone Management application package for the Kite House Pool, Wood Deck, Fire Pit, ATV Garage and the Tennis Court. We also plan on discussing the Boat Dock House but this is more of a Corps ofEngineers issue. All of the designs in the CZM submittal can be revised later. Please call me if you have any comments or questions and I look forward to seeing you. St hen M. Ca linger EFTA_R1_00195272 EFTA01821922 Ste hen M. Ca linger The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jcevacationesmail.com, and destroy this communication and all copies thereof, including all attachments. EFTA_R1_00195273 EFTA01821923
ℹ️ Document Details
SHA-256
b7ff500a508edd0d6fff2e41b33b2742aee6f5f60c77683c87a0acbc61a1623c
Bates Number
EFTA01821922
Dataset
DataSet-10
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!