EFTA02031703.pdf

DataSet-10 3 pages 707 words document
👁 1 💬 0
📄 Extracted Text (707 words)
January 14, 2011 Office Pavilion Outdoor wall niches facing ocean — 7 feet in width — ■ - two large mirrors Table top in walkway/hall- JEE — needs bottom and glass for mirror - GK - 2/7/11? Office Paint - before furniture arrives — Feb 5, 2011 desk lights —' Wired for computer — Scott GK — change all faceplates to white Master Suite Baseboard at entrance to MB painted white — completed 1/14/11 Sconces — 51.5 inches from floor — fill in holes on the side Mirror in Water Closet — space is 63 inches in width, 43 inches between sconce roughing, sconce roughing 28 inches above countertop Mirror in WC — marble surround — GK — running out of marble —JE — perhaps mirror — 5K will investigate? Toilet "gun" Closets built —C has the details Shower doors — still brainstorming Vanities in bath Outside Tub Mirrored back wall Area to be filled in with soil for planting Kitchen Fan — bottom level with bottom of pendants? kitchen tv — Nick Lambros TV brackets - Nick — must be centered over box — GK — fabrication in process? stereo — Nick Apple TV — Scott - requires TV have 1) HDMI input 2) Resolution 1080 p Existing Little Office - flooring GK — material will arrive week of 1/20/11 — 2/5/11 deadline dependent on labor to get it down Border to be measured — new border must be same width as existing wooden border Porch/Walkway outside Living Room JE - scaffolding/platform/sheeting apparatus kept area cool — brainstorm — canvas sail mounted on outside? — Brice — maintenance issues GK — transom — Ritz Carlton? — platform probably what blocked midday rays Brice — original screens — JE — may be hampered by sconces EFTA_R1_00541922 EFTA02031703 GK — once Phase One cleanup underway would like to sand and seal a sample area of walkway for JEE review and approval to proceed Living Room electric Switch out switches to front/more convenient locations Igala — Landscaping Intersection at crossroad (near Laundry) to Kitchen? MBR? — bougainvillea and fish tail palms Jules —(boulders entry) moving boulders to entryway — "graded" to height of existing stone wall Blue marked palms from beach to fill in Canary palms from top of hill at entry — any left over to go to owner's drive Fishtail palms All must be aesthetically centered with dock beach palms - office Nursery Empty? Floating Dock GK will indicate when launched so pictures can be sent to JE for approval Moorings DW — will remind GK on 1/19/11 to call attorney for an answer — if one not received by then Jet Ski Pad (cement dock, jet ski) Area marked out and approved by JE Tom to gather and screen stones from area — will be like roadways — blended into existing area? Mechanical Desal shed roof — photos next week? Nana paint, dock lights, dock poles— Brice/Carlos/Gary M. Lights must work ATV pad off of dock Radial concrete slab off of dock for cleaner area to stop ATVs Ion - scheduled: 1. cottage 2. MBR 3. Sarah's office — should occur before furniture arrives 4. library ceiling — in 10 days (1/28/11)— GK to indicate when progressing for pictures to JEE Wall/planter off steps leading down from MBR JEE on site — advised GK and Loren regarding height, run of wall and planter — as well as planting palm to mirror existing palm EFTA21_00541923 EFTA02031704 PHASE TWO - After February 5, 2011 to April 7, 2011 Mechanical Building/Mechanical Desal — operational 4/7/11(see exceptions list on email to JEE 1/13/11) Handrails — in progress - pictures for JEE to ensure pattern is as approved Roadwork/Walls around JE area pebble beach house pops garden — middle wall — GK — after 2/7/11 heli expansion triangle planter info electric entry lights Tiki floor nursery floor thatch roof - roof upgrade - thatch in storage — 40 to 50 feet — GK — not enough, new sample pending Increase ring cut out around center tree trunk to hopefully relieve the floor issue dock pavilion library woodwork — Curtis Brown (Oklahoma painter) — arrival subject to JE visit Jules kite house intersection Jules grotto/steps JEE advisement needed pool excavation? EFTA_R1_00541924 EFTA02031705
ℹ️ Document Details
SHA-256
b8ed544967cf0244bf7021050b8341ecdb63b0029378648e1e4ad4f8293bdb0d
Bates Number
EFTA02031703
Dataset
DataSet-10
Type
document
Pages
3

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!