📄 Extracted Text (310 words)
From: "Marc Dober"
To: "Jeffrey Epstein" <'eevacation mail.com>
c: "Gan Kerne " < , "Thomas Melnick"
Subject: Brice's Cottage and 5 Palms
Sent: Tuesday, November 22, 2011 4:45:43 PM
Jeff,
I apologize I did not have this information when we spoke as I was waiting on an update from Tom.
Brice's Cottage
• Upstairs is complete
• Tiling to be completed by end of the day on Wednesday (Nov. 23`°). Grout will be done next
week
• Electrical and Plumbing are basically complete just need to install fixtures. This will happen
after tiles completely done
• Kitchen work will be done after the tile is in as well. Everything is on site.
• There will need to be some outside grading work done as the drainage is an issue. All water is
draining towards the house. Tom has that scheduled to do next week.
• Overall — Tom is anticipating be complete in 3 weeks.
Five Palms
Here is the additional information and decisions that have to be made:
• Flooring — are we going with wood or tile or something else. As stated before the greenheart
is not suitable for that area
• Window above the millwork piece. The millwork piece going in there is 16' 8" and the ceiling
is 18'. Take into consideration the flooring and there is not a lot of room for a window. What
would you like to do?
• Interior walls — original plan was to go with'/. in stucco. Is that still what you want?
• Ceiling — is here a piece of art or a tapestry going on the ceiling? If so what type of lighting
• Electricity — are we going with permanent power or generator? Tom is getting the quotes to
run permanent feeds but need a decision on what you want to do here.
Thanks
Marc
EFTA_R1_00028465
EFTA01739715
ℹ️ Document Details
SHA-256
b8ef515720725a2d359e07f817e19f50003e0f37e4fdbf7f8f025ee030800320
Bates Number
EFTA01739715
Dataset
DataSet-10
Document Type
document
Pages
1
Comments 0