📄 Extracted Text (262 words)
From: Larry Visoski
Sent: Saturday, December 6, 2014 2:29 PM
To: Je vacation
Cc: Rich Kahn
Subject: GIV gear update
Attachments: IMG_2089.1PG; Untitled attachment 00057.txt; IMG_2090.PNG; Untitled attachment
00060.txt; IMG_2088JPG; Untitled attachment 00063.txt; IMG_2086.JPG; Untitled
attachment 00066.txt; IMG_2084JPG; Untitled attachment 00069.txt
Jeffrey,
GIV Completion date Dec 18th is what we are shooting for.
Updates:
Below emergency exit window frame corrosion inspection was good, no corrosio= found.
Completing the software update to DU885's to prevent the tone during flight.=(no charge).
Gear corrosion:
We have shipped "main gear inner race" to Savanah Engineers for evaluation t= make sure the core is repairable, we will
elect to exchange this part, thi= will not effect completion date only final price, the evaluation is to det=rmine if part has
core value or scrap.
I will have detailed parts pricing spread sheet on Monday from Ron Bystrom o=r Lead sales rep on this inspection. I trust
Ron and he give honest evaluat=ons for safety of flight, all parts we are changing are a necessity.
At this time gear corrosion repair estimate $120k to $150k depending on cor= value of parts we are going to exchange.
Our gear corrosion inspection is 48 month event, with all the new and improv=ments we are completing, I expect no
issues in this area for 8 years.
We are going to install an improved main landing gear cover plate that preve=ts moisture from entering the main gear
axle area. Normal operations utiliz= this area for an axle jack during tire changes, (tire change is approx onc= a year, or
120 landings).
EFTA_R1_01337244
EFTA02354647
ℹ️ Document Details
SHA-256
b94eb7f37000ab2ec50b9bf3f1c1bfe04fd6b024807cd01d5e4af8070917641d
Bates Number
EFTA02354647
Dataset
DataSet-11
Document Type
document
Pages
1
Comments 0