📄 Extracted Text (159 words)
From: Larry Visoski 41.1e.
To: Je vacation an-, ==l >
Cc: Rich Kahn
Subject: GIV update
Date: Thu, 24 Mar 2016 13:21:02 +0000
Jeffrey,
Elevator flight control cable was changed due to ware.
While doing flight control checks, Gulfstream mechanic noticed a clicking sound in control yoke, while rotating
aileron yoke.
They removed the Yoke from cockpit, replacing nut plate under floor board in cockpit, time consuming,. Better
update on delivery status later today.,Dave and I plan to arrive at Westfield at noon tomorrow.
Thx
Larry
Pete and Larry,
Aircraft is still in tail dock. Wing leak checks ongoing as some panels have leaked and require corrective
action.
O2 bottles installed and leak checked.
We have run into some challenge's with the yoke repair/installation. This is pushing our time frame back. We
will access any revision to delivery later today as work progresses and we can make an accurate estimate.
Thank You,
Mike Tucker
Sent from my iPhone
EFTA00327209
ℹ️ Document Details
SHA-256
baa0121d7271b237ae5409d0a0a89540a40cee99b22597f35c4dcbc4cc18defa
Bates Number
EFTA00327209
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0