To: JEE 'eevacation mail.com]; Brice Doug
Schoettlei mad Hann
From:
Sent: Tue 6/9/2009 1:30:12 PM
Subject: Re: Master Bath & Bed
Title: Rc: Master Bath & Bcd #2 cabana gutted 8 +- months ago
On 6/9/09 9:22 AM, "curbs" wrote:
• April 4th - CZM permit start up was required— exterior demolition and plant
clearing, silt fencing.
• April 27th — 28th Master Bathroom taken apart — during inventory of
Bedroom/Bathroom
• Sinks outside for no good reason — but they are undamaged and will be properly
stored.
• We can begin - Master bath foundation, walls, electrical and plumbing roughing
when you give us the go ahead, Building Permit received last week.
• Exterior column design unclear.
• Details & specifications based on exactly what you had before — we can
complete most issues with this information — No Designer on Board.
• We can reused — Vanities which are in fine shape — shower doors to speed
schedule forward -
• Need budget approval to allocate funds — order long lead
On 6/9/09 8:05 AM, "JEE" <[email protected]> wrote:
when was my master bathrroom taken apart„ why are the sinks outside for
weeks on end ? when was the cabana taken down„ when is the master
bath project actually going to begin„
EFTA_R1_01518868
EFTA02443485
ℹ️ Document Details
SHA-256
bab2d0e44bd098f1cb3fc02ac6926e350b65366243c0bc6ea0c1ed9373647029
Bates Number
EFTA02443485
Dataset
DataSet-11
Document Type
document
Pages
1