EFTA00773402.pdf
👁 1
💬 0
📄 Extracted Text (212 words)
From: "Doug Schoettle"
<
To: "Bryn Schuyler" <1
Cc: ' ' leevacation®gmail.com>
Subject: Re: Little St. James
Date: Fri, 07 Aug 2009 14:33:23 +0000
Dear Bryn, I am still unable to open the cover letter or the other proposal except for the Fancelli proposal. The
Fancelli proposal includes work which is part of the basic work such as the trim out to the windows and doors,
the windows and doors are the size specified by Molyneux studio and are installed in the correct location, also
the entry condition which must be corrected is part of the basic work, the exterior door size was specified by
JPM. The proposal did not include adding a small piece of wood to the cornice to conceal the air grilles, this
condition was mocked up in the field and discussed with JP. Please review and resend the information. Thank
you, Doug
- - On Wed, 8/5/09, Bryn Schuyler <INIM > wrote:
From: Bryn Schuyler
Subject: Little St. James
To:
Cc: "JPM Office" , "Aurelien Gallet"
Date: Wednesday. August 5, 2009, 6:55 PM
Doug.
Please find attached the Meriguet proposal, Fancelli proposal and cover letter that was sent to Mr. Epstein
today.
Feel free to let me know if you have any questions.
Best,
Bryn Schuyler
PABryn
EFTA00773402
ℹ️ Document Details
SHA-256
bd0090cd47ddb1f42411813c2a76e32bfae0be7a9141852e74129cb6c8f4d1fa
Bates Number
EFTA00773402
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0