EFTA02376654.pdf
👁 1
💬 0
📄 Extracted Text (191 words)
From: Daphne Wallace
Sent: Wednesday, July 1, 2015 8:29 PM
To: Jeffrey Epstein
Cc: ann rodriquez; Rich Kahn
Subject: Pre-fab Building bids - July 1, 2015
Greetings Sir,
I contacted J=redian to confirm that the scope of work they submitted for the structural=steel buildings they designed
for the RO Garage roof and the proposed New =echanical Building were suitable for the 80 by 80 building that you have
r=quested bids for.
John advised that an 80 foot wide building would not fi= on the sight - we presumed you are proposing to place this
building where=the current Buck Steel building sits - due to space restrictions.
The buil=ing they designed has a maximum width of 74 feet. To increase to 80 =eet you would have to excavate into the
driveway leading to the Iguana cro=sing and to your Main compound driveway. They avoided this area beca=se of the
electrical and other underground infrastructure that runs under =hat driveway.
Do you wish for me to proceed, as you requested, with obtain=ng quotes for an 80 by 80, or do you wish to reduce to 74
by 80?
Respectfu=ly, Daphne
1
EFTA_R1_01386481
EFTA02376654
ℹ️ Document Details
SHA-256
bdcc112f0ed3fd5cbf19bc5678f9394040967c63440aa56b093c64ec474e7d8a
Bates Number
EFTA02376654
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0