EFTA00959499.pdf

DataSet-9 2 pages 571 words document
👁 1 💬 0
📄 Extracted Text (571 words)
From: Jeffrey Epstein <jeevacationggmail.com> To: Ivjet Subject: Re: GIV ready for test flight Date: Sat, 27 Apr 2013 02:11:08 +0000 100k in escrow not 50 , and ok for all On Fri, Apr 26, 2013 at 6:38 PM, < wrote: Jeffrey, I've been having email issues today, not sure if you received my earlier message: Gulfstream just called, the GIV is ready for test flight tomorrow, engine runs where completed today, if you approve, I will airline to Palm Bch and view the test flight to guarantee airworthy items have been repaired? I will use Two GIV pilots from Wayne Hysinga's flight Department who where just laid off due to cut backs in there operation, they are friends of mine with great GIV experience, I have requested Darren Rothell to observe if he is in town, not confirmed yet. Our Gil will not be ready till Monday night for engine runs and test flight. GIV repairs: - 4 new actuators installed on flaps. -air cycle machine PSI pressure was repaired by cleaning AB cabin air filter pressurization system. -auto Throttle split and over temp during climb was repaired by I.G.V. "Inlet Guide Vane" rigging and adjustment, I'm told, Throttles are perfect match at 1.48 EPR setting. Do you approve of test flight tomorrow?, We need to give Dennis an answer if we "accept" the GIV per the contract today, Dennis offered to escrow $50k in order to repair the items below after closing. If flight test is acceptable tomorrow we can close early next week if you like. There are 9 "NON" airworthy items require sending indicator panels out for repair. down time is 2 weeks, some interior and some cockpit related displays, Dennis has agreed to place $50,000 in escrow to cover payment of these items and open a work order with Gulfstream to remedy these items after closing. 1 - "Standby" fuel gauge totalizer is indicating 200 lbs lower in total mode there is a 150 lbs limit. . standby panel indicator needs calibration. 2 - LED light burned out on Rate of Climb I FPM on pressurization controller. Panel needs new bulb. 3 - With both engines and APU running and both converters on DC volts on the Right-Left-AUX or ESS selected intermittently indicated 47.8 VDC. trouble shot system, panel needs calibration, problem is intermittent. 4 - #1 RTU Radio has a vertical line across display on screen - splits screen in half, Radio control heads needs screen repair. 5 - On RNAV approach VNAV worked and then became unavailable on approach Repair Rnav receiver. 6 - Standby engine instrument gauge is indicating all "8888"s on RT HP gauge LED panel needs repair. 7 - cabin management display at VIP and galley screen hard to read, LED panel needs screen digits repaired. 8 - Satphone is inop Receiver needs repair.. Do you approve of the above? thank you, Larry EFTA00959499 The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00959500
ℹ️ Document Details
SHA-256
c084fe3959cd59d6ac40329b492918d7097ab66d220bc013be86e8b05b2be9c2
Bates Number
EFTA00959499
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!