From: Richard Kahn
Sent: Wednesday, October 3, 2018 12:48 PM
To: Jeffrey Epstein
Subject: Fwd: pool
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue 4th Floor
New York, NY 10022
to
fa
ce
•
Begin forwarded message:
From: =/b>Kyle reavis
Subject: =/b>Re: pool
Date: =/b>October 3, 2018 at 7:55:30 AM =DT
To: =/b>Rick Ross
Cc: Richard Kah brice gordon
Good Morning Rick,
Thank you for the update =n the pool. Since the schedule and sequence of work on this pool =ave changed I
would like you guys to come out a few times a week (or =hatever is best in your professional opinion) to check on the
progress =nd do your own PH testing. We will happily help you out but we =ill not be accepting your work as completed
until the sealent is =pplied. I want to make sure you guys will own this work until =ompletion, which I'm am sure you
have no issue with. Please let =e know what days and times per week work for you for the pool =nspections as we wrap
this project up. Thank you for all of your hard =ork so far and I look forward to seeing the finished product, it is =ooking
good! Thanks!
Very =espectfully,
Kyle Reavis
Construction Manager
EFTA_R1_01830388
EFTA02622473
On Tue, Oct 2, 2018, =:04 PM Rick Ros > wrote:
Good day all ,Just wanted to give an update on the status of =he pool.
The plaster work went very well , however in =he acid wash and power washing of the pool in
preparation of putting =he Kristacure ( sealer ) we felt that the pool would benefit from being =illed with water first for a
few weeks .( This is the normal start up =rocedure ) During this time have Smiley brush it daily or as often as =e's able ,
to even up the surface a little better so when it's =ealed the pool looks the best it can.
The Blue and other colored plasters are very difficult to get =he finish uniform and I'm confident this
additional step before sealing =ill do the trick.
It is important that the PH stay at or close to 7.0 for =0 days .( this is done with the addition of Muratic
acid ) Additionally =hlorine can be added on Friday . No calcium is to be used. The salt =ystem should not be used during
this time as well.
After this period the pool can then be drained and sealed as =fanned.
Please =all me or email if you have any questions.
Thank you
Rick Rossi
2
EFTA_R1_01830389
EFTA02622474
ℹ️ Document Details
SHA-256
c0c63a44f0c91369a152fe5f0b260a4ed6394c81ce37d537650aff9d87e9c68e
Bates Number
EFTA02622473
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0