:rummar= . WORK ORDER
Number: 3 R1
PLANT Date: 2018.07.31
Contract Date: N/A
Location: 9 East 71st Street, New York, NY
Project: Main Staircase General Plant Construction LLC
9 East 71st Street Contractor: 181 Broadway, 5th Floor
New York, NY New York, NY 10007
Owner: The Private Residence Designer: Cabinet Alberto Pinto
9 East 71st Street
New York, NY 75002 Paris (France)
The Work Order as follows:
Preliminary Budget for Painting of walls in Main Staircase (sr unitised
to he at the same time as renovation of Master Rathmnnt
Fmtentinn• $4,375
F/I Furnish and install Temporary protection (heavy protection)
on floor at 1st floor and Main stair steps; reinstallation of
protection, removals and discard all protection materials
after completion of work
Carpentry $750
F/I Miscellaneous work between trades
Electrical work: $8.960
I/O Remove and Reinstallation of (4) existing wall sconces at the existing
locations and Installation of (1) canopy and chain supplied by Others
at the existing locations including of scaffold as per a walk through
at 07.12.2018; no new wiring and lighting boxes
Painting (suppsasediuttime_as_painting of Dome
ceilingiftMasterSatbutom):
two42Lwallia:
F/I Remove carefully the existing canvas and molding around then fill holes, $17.820
sand, and apply skim coat level 5, sand apply (1) coat of primer followed
by (2) coats of White paint
F/I Apply different coats of Glaze in order to match the Patina validated $8.680
on the preliminary sample
Front wall.
F/I Remove carefully the existing canvas, apply skim coat level 5, sand, $9.910
prime then apply (2) coats of selected paint; on top of this preparation
apply R35 then install the new Canvas provided by the Decorator;
apply (2) coats of paint on the rest of the wall
NIC Canvas provided by the Decorator
Fntranne Vestibule and Staircase Hall.
F/I On top of the existing Gold leaves, realization of a Patina by Glaze $7.180
following Decorator recommendation
Scaffold:
F/I Installation, rent, dismantle, and removal of pipe scaffolding $24.510
1I 3
EFTA00810738
WO #3 R1 continued ...
Fatimateri General Requirements for a 5-week period• $13,250
- Project Manager: 8 hours
- Project Supervision / daily cleaning: 60 hours
- Driver: 8 hours
- Estimating / purchasing: 8 hours
- Reimbursement of Direct Expenses for 5 weeks including of
(1) Negative Air pressure and HEPA filter during work and
Carting
- Final professional cleaning in Main Staircase area only
Construction Schedule:
The estimated duration for on-site construction is 5-6 weeks including
of Protection, Electrical, Painting, and Final cleaning in work area only.
Fxritisinn-
Daily dismantle and re-install temporary protection.
Miscellaneous Touchups.
New wall partitions.
New wiring and lighting fixtures.
Correction of existing violations or site conditions (i.e. existing plumbing. etc.
Job phasing.
Shop drawings and mock-ups.
Overtime for Contractor's labor and its subcontractors.
Union labor will not be provided on this job.
Department of Buildings plan filing, applications, building permits, fees.
Controlled Inspections.
Integrated drawings.
Engineering services (MEP).
Removing and replacing building utilities.
Chopping and/or channeling structural floor, wall, or ceiling.
Performance or payment bonds.
Environmental / hazardous materials testing and monitoring.
Removals of asbestos on floor, walls, ceilings, ductwork, pipe insulations.
Notes / Qualifications:
- WO #3 R1 is based on regular work hours.
- Deposit is 50%.
- Moving Arts and furniture will be provided by Owner.
- Certificate of Capital Improvement supposed to be signed by the Owner.
- Plant's General liability insurance minimum limits are $1 million per
occurrence, $2 million aggregate per year, with a $5 million umbrella.
Any higher limits, umbrella policy, OCP or other policies requested will
need to be quoted individually and will provided if requested at additional
cost to Owner.
- Plant's Automobile Insurance policy limits are $1 million per occurrence,
$1 million aggregate per year and $1 million property damage. Any higher
limits or any additional coverage requested will be provided if requested
at additional cost to Owner.
- The scope of work is limited to the items described above.
- This WO is valid for 60 days from date on page one.
Documents-
- The Designer's e-mails dated 06.26.2018 and 06.27.2018 (with pictures).
R1 - The walk through notes dated 07.12.2018.
R1 - The Designer's e-mail dated 07.17.2018
2/3
EFTA00810739
WO #3 R1 continued ...
KEY:
F/I Furnish and Install
I/O Install Only
F/O Furnish Only
NIC Not In Contract
TBD To Be Determined (NIC)
"K Allowance
Note
ALT Alternate (MC)
Subtotal $95,435
Overhead & Profit $14,315
Insurance $2,744
Total $112,493
Contingency 5% (NOT included in above "Total'; $5,625
NOT VALID UNTIL SIGNED
Owner's Representative
Designer
General Contractor
3/3
EFTA00810740
ℹ️ Document Details
SHA-256
c21372a31fe5476a85f1fa7db49d8b76f321b5872055cc298525b4942b343ac8
Bates Number
EFTA00810738
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0