EFTA01791386
EFTA01791387 DataSet-10
EFTA01791388

EFTA01791387.pdf

DataSet-10 1 page 254 words document
V16 P17 V11 P18 P22
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (254 words)
From: jeffrey epstein <[email protected]> Sent: Frida , March 4, 2011 4:07 AM To: Subject: Re: Gil update What about altitude Sorry for all the typos .Sent from my Phone On Mar 3, 2011, at 7:59 PM, wrote: Jeffrey, Tstat is installed and working, APU is not as smooth as I thought it would sound when accelerating from 80% to 100%, the part we installed is 41years old, so that could be an issue,.We are doing functional checks of the APU Surge Valve, which is the last part of the air system involved in starting. Surge valve will arrive tomorrow from Savannah at 10:30am is what I'm being told, just in case we elect to install it,. I'm fine with APU operation at this point, so we can depart if you like any time tomorrow,. I will know more around midnight tonight if a problem with surge valve is found„ only takes 1.5 hours to install,. I did not want to delay your departure,.) can always install when we do the below floor inspection,.if there is an issue found with surge valve,. The technicians at Long Beach are marginal as far as Gil knowledge, they are following the Tech supports recommendations,.only one guy is approved to run APU, all others are GIV and up specialist,. Boost pump operation normal., changed boost pump Relay for L/H side, and two pressure switches,. I will update you if any findings on surge valve,.let me know if there is a departure time yet? thank you, Larry 1 EFTA_R1_00121325 EFTA01791387
ℹ️ Document Details
SHA-256
c2e0c05b87aff2fdf23be41762bfb1824eeafbf6967c9d92889b47eb5ec9bde3
Bates Number
EFTA01791387
Dataset
DataSet-10
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!