EFTA01113413
EFTA01113423 DataSet-9
EFTA01113431

EFTA01113423.pdf

DataSet-9 8 pages 3,794 words document
P17 V11 V16 P23 P22
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (3,794 words)
EFTA01113423 NEPTUNE LLC 358 EL BRILLO WAY PALM BEACH, FLORIDA WINDOW PROPOSAL SPREADSHEET 10/1/2015 SEAWALL ESTIMATES Scope of work: Remove existing floating seawall footer sheets, remove dock, construct new seawall in front of exIsdng seawall with new 8 ft wide dock, Install new 12' x12" oonaete piles, Install new travertine on new boat dock. ENGINEERING DOCK ASSOC. CONSY. SEAWALL COMPANY SEAWALL PRICE BOAT LIFT AND PERMIT FEE PERMIT SUBTOTAL LC E DITENSION TRAVERTINE WORK DURATION AU.OWANCE Const. Technology Inc. $ 486,400.00 $ 23,900.00 I $ 20,950.00 $ 4,900.00 $ 38,000.00 6 mo. 8-10 wks. $ 574,150.00 $103,347.00 $ 677,497.00 B&M Marine Inc. $ 162,250.00 $ 13,460.00 $ 20,950.00 $ 4,900.00 $ 38,000.00 6 mo. 10-12 wks. $ 239,560.00 $ 43,120.80 $ 282,680.80 Logan Const. Inc. $ 622,000.00 II $ 45,000.00 $ 20,950.00 $ 4,900.00 $ 38,000.00 6 mo. 10 WKS $ 730,850.00 $131,553.00 $ 960477.80 H I I GENERAL NOTE: "Associated work" will Include: Dempster, ponajon, driveway and patio protection, general labor for clean up. . . ._ EXCLUSIONS: Removal or reinstallation of irrigation and landscaping for work access, pool or deck repairs from pile driving, pile log and monitoring, sismIc testing, orck punching, warranty of existing seawall, dredging, seagrass survey, weekend or overtime work, any unforseen or additional engineering fees or Building Dept. permit review comment requirements. PROPOSAL/CONTRACT REPAIRS OF ALL KINDS. B&M Marine Construction, Inc. DOCKS & SEAWALLS CGC052820 WOOD & CONCRETE STATE LICENSED & INSURED MARINE CONTRACTORS HELICAL. PILES 6276 MADRAS CIRCLE • BOY FLORIDA • 33437 SHEET PILING OFFICE: FAX PIN PILES MACK lOCAIION PROJkCI IOCABON. Daniel Labonte August 14, 2015 Pa s, FL P: 358 El Brillo Way E: Palm Beach, FL B & M MARINE CONSTRUCTION HEREBY SUBMITS ESTIMATES FOR: I. Demo existing concrete dock and haul away. 2. Install 150' of new pre-cast concrete seawall in front of the existing wall within 12". A. Prestress concrete vertical and batter piles, (17)12" x 12" up to 20' length. B. Concrete seawall slabs: 9' x 7 ¶4" up to 12' in length. C. Concrete seawall cap 36" x 14" using 45 bars with #3 stirrups ® o.e. D. Backfill between wall from canal. 3. Install new I00'xis concrete dock on outside of new seawall. A. Eleven (II) 12"x12" concrete piles up to 20' length. B. 10" thick structural slab #5 bar o.c. each. C. No pilasters. D. Total dock width to back of cap will be 10'. E. Over pour existing seawall as part of dock. F. Dock has to be 25' off each property line. Sub-Total:S 162,250.00 4. Install 12,000 lb. Neptune aluminum elevator boat lift as follows A. Mount to new dock. B. Remote, guide post and wood bunks included. C. Electric is not included. D. Adjust to lift boat. Sub-Total:S 13,460.00 5. Permits & engineering estimated approx cost. Sub-Total:5 8.000.00 Total:SI 83,710.00 OPTION I: B & M Marine proposes to repair existing seawall footer as follows: A. Remove approximately 20' of floating footer sheets. B. Install ISO' of new 5' long footer sheets at the base of the existing sheets. C. Drill 'I" lag screws in top of the existing sheet every 3' and fasten to existing wall. D. Concrete fill the gap between the old sheets and seawall. E. Pour concrete between old sheets and the new sheets to fill void. $ 23,850.00 PAYMENTS NOT RECIEVED WITIUN TERMS LISTED ABOVE SHALL WE DO NOT ASSUME RESPONSIBILITY FOR SUITABLE ACCESS TO THE ACCRUE INTREST AT 1.75% PER MONTH. (APR IS 21%) ALL EXPENSES JOB SITE. OWNER SHALL BE RESPONSIBLE FOR FURNISHING OFFSET INCURRED AS A RESULT OF LATE OR NON PAYMENTS. INCLUDING LIEN STAKES SET BY A UCENSED SURVEYOR_ B&M MARINE FEES. REASONABLE ATTORNEYS FEES AND Comb., SHALL BE PAID BY CONSTRUCTION, INC. TO BE HELD HARMLESS FOR CLAIMS OF NOISE. CUSTOMER. VENUE FOR ALL LEGAL ACTIONS SHALL BE EXCLUSIVELY VIBRATION DAMAGE, POLLUTION. OIL FALLOLT. ETC. ALL REPAIR IN BROWARD COUNTY, FLORIDA. ANY ALTERATIONS FROM ABOVE WORK IS GUARANTEED FOR A PERIOD OF ONE FULL YEAR FROM THE SPECIFICATIONS INVOLVING EXTRA COSTS WILL BE EXECUTED ONLY DATE OF COMPLETION OF ANY AUTHORIZED WORK..WE RESERVE THE UPON REQUEST AND WILL BECOME AN EXTRA CHARGE OVER AND RIGHT TO WIIIIDRAW THIS DID IF NOT ACCRPTED WMIIN 30 DAYS ABOVE THE ESTIMATE UNLESS OTHERWISE SPECIFIED. AUTHORIZED SIGNATURE: Glen Bryant THE ABOVE PRICES. SPECIFICATIONS AND CONDITIONS ARE SATISFACTORY AND ARE HEREBY ACCEPTED. YOE) ARE Atrriantimo TO Do Tlui WORK AS SPECIFIED. PAYMENT WILL BE MADE AS OUTLINED AHOY!. DATE ACCEPTED SIGNATURE SIGNATURE EFTA01113424 PROPOSAUCONTRACT REPAIRS OF ALL KINDS. B&M Marine Construction, Inc. DOCKS & SEAWALLS CGC052820 WOOD & CONCRETE STATE LICENSED & INSURED MARINE CONTRACTORS HELICAL PILES 6276 MADRAS CIRCLE • BOYNTON BEACH • FLORIDA • 33437 SHEET PILING OFFICE: FAX PIN PILES MAUL LOCATION KOMI L0CAIIDN. Daniel Labonte August 14, 2015 ens. FL P1 : 116 358 El Brill° Way E: Palm Beach, FL PAYMENT TO BE MADE AS FOLLOWS: 30% OF CONTRACT DUE UPON MOBILIZATION 30% DUE UPON COMPLETION OF BARGE WORK 30% AFTER PLACEMENT OF CONCRETE OR WOOD STRUCTURE BALANCE DUE UPON CONTRACT COMPLETION TO COMMENCE THE PROCESS: I. Return a copy of the signed contract 2. Please include a copy of your survey, which is required for permitting, 3. Deposit ofS 3,000.00 PLEASE. NOTE THE FOLLOWING' I. TERMS AND CONDITIONS OF THE CONTRACT. 2. This bid may be withdrawn if not accepted by both ponies with a signed contract within 30 days. 3. All plans, permits and all associated costs ganged or obtained by B&M !Marine Contraction, Inc. will be billed and paid for by the customer as on additional expense. That final approval for any permits applied for are subject to agency approval. 4. If engineered pile logs are required for dock or batter piles con be additional and to be paid by owner. 5. Exclusions The repair of sod. sprinkles. plumbing. elearie, tackfig, undaground utilities, patio or sidewalk damage, landscaping, concrete test cylinders. engineering, layout. seawall mounted fences and nub due to construction, as per comma 6. All ladders installed as per code to be an additional cost of 8250.00. 7. Backfulling if necessary to be furnished at $100.00 per C. Y. if brought in. 8. If permit requires rip rap placed at the toe of the seawall: cost to be SI35.00 pa ton additional. 9. Punching of rock and/or use aeon,inflow piling@ $350.00 per pile additional if necessary 10. Billing based on actual units installed. I I. If punching of rack is mammy to excavate or dredge there will be an additional charge of $50000 per hour for punching time 12. Stamby lime to be at 5500.00 pa hour. 13. B&M Manta; is not responsible for any additional cost which may be related to disposal of any contaminated material that may be removed from your site 14. Piling shipped to the job ova the above specified lengths to be @ $30.00 per L F additional. IS. B&M Marine Construction. Inc is not responsible for dredging which may be required for use of boot lift 16. B&M Marine Construction. Inc. is not responsible for pool or patio damage due to vibration or undermining during construction. 13&M Marine Construction, Inc. recommends a seismograph be taken on any land based dnven piles and the customer will be billed an additional charge 17. No additionsl work shall be performed on permitted structure caw by B&M Marine Construction, Inc. or prior approval by B&M Marine Conaruction. Inc. The owner IS responsible for additional pennininp fees and time for violation of this clause prior to Anal C.O. In addition, the owner is responsible for fees and time for permitting for electrical and plumbing prior to final C.O. 18 The contract price and commencement is bawd upon supply of the cement. cement related product and steel. The unforeseen shortage of these raw materials has Greatly impacted the industry and subsequently this may affect the scheduling of the job and cause decays. Shortages and allocation may also result in prise Increased in existing and future proposals and contracts OWNERMET NOT (MAIN terramorr 10 ANY IMPIR)TYMENT I Mt Mill TWAY Flit CONTRACT STU HAS FAIN PAID P.AMMO: Ill PAY IN ACCORDANCE MITI IN. FIRMS AM) COMMIITTCAlt TOT ALX:TRACI MAY Y2A4.0, Ietnf, INDITWit/TWITTIS WINO IMMOVII) Al TIC TYANDAS IOW •TITT20.CITY STD ARANCIA ranamMAY At A VAS. Alt/ TIM TM THY PI eras is sAILMitelts KI cll. TaLONRY tit ALT IA VW MIN. 1.4)NETINT A PROlat PFATORMED TtaRCTANIRAC1. WIRD: Tit LCCAN NIYa.1Y MOM LIWWILDV)01.ATIOM CIF 'SOMALAI BY A I ILF.Te+D CYRORACR1R FOR INFORMATIONAWAIT TW KEMP/TRY BM AND MING A CI A.Rot IXNrACI TYEFY.0RM ITOUTCTRY LICENSINGII043I) A" THEIVILOWIM 11117DOPE TO.1312 AND ADDRITTLI. I140102111MOTIROF sntErr.T.VIAIMVF, n mumIT At> fLIO-TAYI TISTACCORTNATE TO FITTPTITAS CONYIIIMIltr. TUN tAW TAI GOYIM TIT 001-1I I I?. HAMM %I A"Olt A) WARM (XI YOUR PIRDPRITTYOR PROVII11 suntanI AM) /JUL NUT PAMN.1U INN. ANRMO TOMORAL I MIR CI ATM ITU PAVLOV., AGTOIAT VOW ITROPLIC TY W YOUR!. (XATTRATIOR OA A VIICANIRAC;CR TARA TO PAY SIMCONDLACTORS, SLR SUACONTRACTCSS. CR MATERIAL SUPPIEICA lit WAAL,. WT).VS Okla)Ma+ V MAY LOOK 70 MIR PRCRIRIY KIR PAYMENT. EATEN II MIHAAT AI.gATTYPAMYIv,M CONTRACTIlit TN FILL W YCAT PAIL TO RAY MIR CON1RACTOR YOUR CONTRACTOR MAY ALTO/LAVE A T 1EN CAT YOUR PROM,TY. ITTIS MILTONIt ALA.NIt MAO Tula NOTARY Y COUTO II IOC II ACIAINAT Y0101 WU i TO PAY I OR I ADAC MAIDUALA T* tom TOEVICTS TEAT WAIT IIINTRACI(N Cat A YICtaITRALICR MAY RAVI InJI IT) TO PAY To 111.011CT YOURZELF, TOU MOULD STPRIATE TN lltSCUNTITACT THAT ITLIAATI ANY PAYNE:411A MAIN. YOUR OTINTRACOR IA RAQUIRID TOPILIVIDC UR) MDT A WWII TINPN LAT, 0I tit: Had ANY FLITSON OR CadIPANY nil INS PROvium TO YOU A 'NOTIM TO OWNER' 110i1F)AS CONTIEXTION URN LAW ISMOLEX ASO IT IS R.EXTCSORDOL1)11455 YOUCOMATIT AN ATTAR, Y PAYMENTS NOT RECIEVED WITHIN TERMS LISTED ABOVE SHALL WE DO NOT ASSUME RESPONSIBILITY FOR SUITABLE ACCESS TO THE ACCRUE INTREST AT 135% PER MONTH. (APR IS 21%) ALL EXPENSES JOB SITE OWNER SHALL BE RESPONSIBLE FOR FURNISHING OFFSET INCURRED AS A RESULT OF LATE OR NON PAYMENTS. INCLUDING LIEN STAKES SET BY A LICENSED SURVEYOR. B8M MARINE FEES, REASONABLE ATTORNEYS FEES AND COSTS. SHALL BE PAID BY CONSTRUCTION, INC. TO BE HELD HARMLESS FOR CLAIMS OF NOISE. CUSTOMER. VENUE FOR ALL LEGAL ACTIONS SHALL BE EXCLUSIVELY VIBRATION DAMAGE POLLUTION. OIL FALLOUT. ETC. ALL REPAIR IN FROWARD COUNTY. FLORIDA. ANY ALTERATIONS FROM ABOVE WORK IS GUARANTEED FOR A PERIOD OF ONE FULL YEAR FROM THE SPECIFICATIONS INVOLVING EXTRA COSTS WILL BE EXECUTED ONLY DATE OF COMPLETION OF ANY AUTHORIZED WORK.. E RESERVE THE UPON REQUEST AND WILL BECOME AN EXTRA CHARGE OVER AND MORT TO WITHDRAW THIS BID IF NOT ACCEPTED WITHIN 30 DAYS ABOVE THE ESTIMATE UNLESS OTHERWISE SPECIFIED. AUDIOWED SIGNATURE: Glen Bryant TEE ABOVE PRICES. SPECIFICATIONS AND CONDITIONS ARE SATISFACTORY AND ARE FIER CRY ACCEPTED. YOU ARE AUTIIORIZED It) DO THE WORK AS SPECIFIED. PAYMENT WILL BE MADE AS OUTLINED ABOVE, DATE ACCEPTED SIGNATURE SIGNATURE EFTA01113425 MURRAY LOGAIV CONSTRUCTION, INC General Contractors 313 65TH TRAIL NORTH Excellence WEST PALM BEACH FL 413 Since TELEPHO 1068 FAX Labonte Construction Services,ILC September 24, 2015 Attn: Mr. Daniel Labonte Re: 358 El Brillo Dock and Bulkhead Improvements Mr. Labonte: Per your request we reviewed the site and we have prepared budget estimates for your consideratio n: 1. Repair Existing Bulkhead by Construction a Steel Sheet Pile Toe Wall. Subject to Engineer's opinion confirming existing Wall/Toe Wall Concept Is feasible). A. Engineering Allowance LS $15,000 B. Permit Allowance LS $15,000 C. Mob/Demob Barge/Crane LS $20,000 D. Demolish Existing Dock LS $20,000 E. Construct Steel Sheet Pile Toe Wall With Concrete Closure Pour LS $261,000 F. Reconstruct Concrete Dock LS $129,500 G. Mooring Piling 7 Each LS $17.500 Total Budget LS 5478.000 2. Construct New Concrete Bulkhead Waterward of Existing. A. Engineering Allowance LS $20,000 B. Permit Allowance LS $18,000 C. Mob/Demob Barge/Crane LS $20,000 D. Demolish Existing Dock IS $20,000 E. Construct Concrete Bulkhead LS $435,000 F. Reconstruct Concrete Dock LS $129,500 G. Mooring Piling 7 Each LS $17,50Q Total Budget LS 5660.000 3. Construct 16,000 Boat Lift A. Engineering Allowance LS $5000 B. Permit Allowance LS $1,500 C. Mob/Demob Crane/Barge LS $10,000 (N/A if Item 1 or 2 underway) D. Concrete Piling 4ea. LS $12,000 E. 16K Hifide Boat Lift LS $13,500 F. Electrical Allowance LS ag(82 Total LS $45,000 We do not perform Engineering in house but I can recommend Engineer's for your consideration. Once final Engineering is complete we can provide firm pricing for the work for your consideration. Please let me know if you have any questions or if you need additional information. David Logan President EFTA01113426 Construction Technology, Inc. COWSIOZNIE •••••••••••• 11•••••••• Post Office Box 16576 West Palm Beach, Mori Phone Fa:Ili.. Email: Celebrating 32 Years of Business 1983-20151 Page 1 a 1 Proposal No. 7508 DT Proposal / Contract Attn.: Mr. Dan Labonte C/o Proposal Submitted To Dab Labonte Construction Service; LLC 9/28/15 Addresa 4165 Linden Avenue Concrete Dock Replacement City. ells and rip Code Job Location Palm Beach Gardens, FL 33410 358 El Brillo Way, Palm Beach, FL 33480 SCOPE CO TOE NOME Ca m TeeNwietlY. Ian than seismsI atm mark thaws on the date end teeeltrarnows sod desalbed herein We will furnish permit processing, engineering, certified plans, labor, supervision, material; and equipment to remove and replace a 7' wide x 110'+/- long marginal concrete dock. All work will be done according to the following: 1. Remove and demolish the existing T wide x 110'+/- long marginal concrete dock with stone finish. This work includes all costs associated with the demolition work. 2. Proposed new concrete dock to be supported by concrete bents on 12" x 12" square pre- stressed commercial grade concrete piles ® maximum 15' on center spans. 3. Concrete slabs to have a minimum 8" of thickness. Stone finish work on top of proposed otw_stQckb_y_ ohm, 4. This work includes 8(ea.) 12' butt diameter wood mooring and bumper piles. 5. Any additional work beyond the scope of the work as outlined above will be done by a change order. 6. No survey work is included. A property survey including property stakeouts and its accuracy shall be the owner's responsibility, to supply to us for permitting and construction purposes. 7. No sprinkler work, landscape work, sod work, plumbing work, or electrical work is included in this agreement. 8. Building permit application and processing are included in this proposal, however permit fees arc not and will be billed in addition to the contract amount. 9. Proposal is valid only in conjunction with Proposal No. 7507. CONTRACT SW lhe Owner shall pay carebeetion Trerretopy. are km One peeformance of Me Ccntract in accoolanca win On, move n current bah as folorre ONE HUNDRED SIXTY EIGHT THOUSAND DOLLARS (S 168,000.00) PROGRESS PAYMENTS 1. $ 42,000.00 DUE UPON EXECUTION OF CONTRACT. 2. $ 42,000.00 DUE UPON MOBILIZATION OF MEN, MATERIALS AND EQUIPMENT. 3. $ 42,000.00 DUE UPON INSTALLATION OF DOCK PIES. 4. $ 42,000.00 DUE PROMPTLY UPON COMPLETION. 1111e OF COMPLETION ilea wort to be pawned order this Contract NMI be commereed WWI 3-0 weeks of rostra of daklen ern* WI Olaf Win I s.i Maim) Ma be euteltecibelif WrCeebtel Win EISEnka lama ACCEPTANCE AND FINAL PAYMENT real masa shall be dm /. doµ arts substantial completion of Si. work provided the week be then Say ampleted and the Cartred 'Sy fifillatTel (Al Sways not paid when an shell beer Hared N tire maximum a Mimed by Swat The above proposal is subject to all kerns and condilions of both sides bumt and becomes a centred when acceptance bon is signed by vi author teed agent of each party. ACCEPTANCE OF PROPOSAL CONSTRUCTION TECHNOLOGY. MC AciaiNWJ By: ccc 000= (0VMER) arliatejtafr idol Onernes.nreellei mem/FS gem Vice Premises Authorized aquae TEC Oat fie glic" DSc EFTA01113427 Construction Technology, Inc. Post Office Box 16576 West Palm Beach, Florida 33416-6576 Phone Fax Celebrating 32 Years of Business 1983 - 2015! Page 1 of 1 Proposal No. 7507 SG Proposal / Contract Attn: Dan Laborde e-mail: Pealieml Sulealtled To Fax DM. Labonte Construction Services LLC 9/282015 Ades* Jab 4165 Linden Avenue Steel Sheetpile Seawall Cry.MK and Dp Coda Job Location Palm Beach Gardens, FL 33410 358 hi Brill° Way, Palm Beach SCOPE OF THE WOfl Conetruction Technology. Ina Mal perform Motile wart Mown on the *befogs and opecificalkme and demoted herein. Furnish engineering, plans, labor, material, and equipment to construct ±140 linear feet of cantilever steel sheetpile retaining wall in front of existing concrete wall. Steel sheetpile will be AZ 14-770 or equivalent with epoxy coating the top 10 feet. Concrete cap will be a minimum 3'-0" /- wide and 2'-O" deep steel reinforced with 12" x 12" sq. pre-stressed concrete batter piles (g/13'+/- on center. Concrete cap will be constructed maximum 12' waterward of existing toe- wall and will have a concrete plug built between the old and new wall at each end. Clean sand backlit' between the old and new wall is included in this proposal. Wall will be constructed from a barge crane with vibratory hammer. NOTES: I. Proposal does not include any utility work such as electric, plumbing, lights, power pedestal, etc. 2. Survey and control by others. 3. Owner to provide Construction Technology, Inc. with a copy or a certified property survey. 4. Building permit application and processing are included in this proposal however permit fees are not and will be billed in addition to this proposal amount. 5. Permit issuance cannot be guaranteed. 6. Vibration monitoring by others. 7. Tree relocation and trimmings, if necessary, by others. 8. This proposal is valid only in conjunction with Proposal No. 7508. CONTRACT SUM The On shall my Tech:Sew, kb b the pallormanco ol the Contract. In accordance with the above, it current Iva es Mows; THREE HUNDRED EIGHTEEN THOUSAND FOUR HUNDRED DOLLARS 1531s,400 .00) PROGRESS PAYMENTS 1. $79,600.00 DUE UPON EXECUTION OF CONTRACT 2. 579,600.00 DUE UPON MOBILIZATION. 3. $79,600.00 DUE UPON INSTALLATION OF SHEETPILE 4. $79,600.00 DUE UPON COMPLETION. TIME OF COMPLETION The wait to be pedonned males On Caged MY be commenced MUM 41TIMOLOLECIMS nouenCe but after Mix AIL.2014 and MS be subsbeliallyecenpiethi wennj2gamatigs(at. ACCEPTANCE AND FINAL PAYMENT Flnal payment Mil be duo 7 days allot subarea' cc/open ol the work prodded the work be then sly completed and one Contract My panned (AZ moneys not pad Sian ea ahat be atm* al Um enentrum rate allowed by law) The above proposal le subject to all terms awl conditions of both sides hereof. and becomes n conk act when acceptance barn is signed by an authocind agent of each party. ACCEPTANCE OF PROPOSAL CONSTRUCTION TECHNOLOGY. SIC. Accepted By jOVVNLII) ersJfeet SoAP.OroxnaneemseSellabto.Eato.VoePresidert Authorized Span ors EFTA01113428 Construction Technology, Inc. OCKM1a4OPM Post Office Box 16576 treason ••••••••• Wes mB h Flo • Phone Fax E-MAIL: Celebrating 32 Years of Business 1983-2015! Page 1 24 1 Proposal No. j§4 QT PROPOSAL / CONTRACT Mr. Dan Labonte Go reopened SelanItted10 Labonte Construction Services LLC Oats Job Nes r ae lialmsedwg4 9/29/15 4165 Linden Avenue Install 16,000 lbs. "T2-X2 Boa/lift w/ Options Clly, Nate wal Zip Code Job Leallket Palm Beach Gardens, FL 33410 358 El Brillo Way, Palm Beach, FL SCOPE OF WE WORK. Contenetkin Techrelogy. Me. Sea storm all WV* work Stanan the Octets ad weeitellone and damaged nettle: We will furnish permit processing, labor, equipment, materials and supervision to install a 16,000 lb. capacity "T2-X2 Topless" vertical cradle boatlift to be located Q 358 El Brillo Way, Palm Beach, Florida. The proposed scope of work will be done according to the following: I. install 1(ca.) 16,000 lb. capacity "X2-T2 TOPLESS" vertical cradle boatlift, aluminum and stainless steel as manufactured by Hi-Tide Sales, Inc. to be mounted on proposed 4(a) 12" butt diameter 2.5 CCA marine treated wood piles. All wood piles will be wrapped in the tidal area and installed with PVC white cone caps. Proposed boatlift will come complete w/ a set of wood bunks, 1(ca.) remote control unit, and a limit switch. 2. This boatlift will require a 50 AMP electrical service. 3. Electrical hook-up by others. 4. No electrical, plumbing, sprinkler, landscape or survey work is included in this proposal. S. Owner to provide Con-Tech with a copy of a sat certified survey. 6. Town of Palm Beach will require a variance permit for this project. Variance pa-mining with the Town of Palm Batch ARCOM to be addressed by the owner or his authorized representatives. 7. Permit processing. permit applications are included in this prdposaL however, permit fees are not and will be billed separately. Permit issuance cannot be guaranteed Options: 1. Upgrade proposed 16,000 lb. capacity boatlift to a 20,000 lb. capacity "Topless' vertical cradle boatlift, aluminum and stainless steel as manufactured by Hi-tide Sales, Inc. mounted on 4(ca ) 12" butt diameter 2.5 CCA marine treated wood piles or 12" x 12" square pre-stressed concrete piles. All wood piles will be wrapped in the tidal as and Stalled with PVC white cone caps as mentioned above. This boatlift will require a 60 AMP electrical service. An additional $2,500.00 to the contract sum. CONTRACT SUM The Owlet shall pay Corstrueban Tecnology, Inc for the performance of Ito Contract in scccedenc,e wan the above, In current Wide at fobs: TWENTY THREE THOUSAND NINE HUNDRED DOLLARS (S . 2 3,900.00) PROGRESS PAYMENTS 1. $ 8,000.00 DUE UPON SIGNING OF CONTRACT & NOTICE TO PROCEED. 2. S 8,000.00 DUE UPON BOATLIFT PILES INSTALLED. 3. $ 7900.00 DUE UPON COMPLETION. TIME OF COMPLETION Sr the week to be pedals:I wider it Cantnict MS becommenced WITH:L23 w.eb err eceezteLlaitichitst imemlbte not Ss Itt2Q1Q and shall be sitetantily completed 24.102WHINGSL ACCEPTANCE AND ANAL PAYMENT RS payment shed be due 7 days Sr wtotantlel cemplefen et the ewe NSW the well( be then fully completed by limy and the Contract My stormed. (Ai mows leaped when due OW bee beast Mew 1•8411.1011 rest Nosed wired when The abow proposals subject to S terms and cantons of both Sae Minot end becansi a acceptance below is signed by an authorized agent of each party. ACCEPTANCE OF PROPOSAL CONSTRUCTION TECHNOLOGY. INC. Accepted by CGC 010820 (OWNER) By. Sect P ar SASS Aulhortted SIgnetwe Or DSc EFTA01113429 Estimate Ideal Installations LLC. 6084 Farmers Place Lake Worth, Fl. 33463 Date 8/18/2015 Estimate # 736 Name / Address Labonte Construction Services, LLC Dan Labonte 4165 Linden Avenue Palm Beach Gardens, Fl. 33410 P.O. # Terms Due Date 8/18/2015 Other Description Qty Rate Total 358 El Brillo Way Dock Flooring - Supply 24x24 Vencia cross cut silver travertine - Supply proper setting materials, grout and sealer - Straight mud set installation to follow off of existing flooring - Grout - Seal marble 20,950.00 20,950.00 Terms of Payment 514.000.00 Deposit $ 6.950.00 Upon completion Subtotal $20.950.00 Sales Tax (0.0%) $0.00 Total $20,950.00 IdealInstallations LLC. EFTA01113430
ℹ️ Document Details
SHA-256
c38941124df518f272799a085dd02c08e86756400ee166a936bb90604f0856b2
Bates Number
EFTA01113423
Dataset
DataSet-9
Document Type
document
Pages
8

Comments 0

Loading comments…
Link copied!