EFTA00805024
EFTA00805026 DataSet-9
EFTA00805029

EFTA00805026.pdf

DataSet-9 3 pages 635 words document
P17 P23 V11 V16
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (635 words)
November 30th 2018 Carpentry Notes Sylvester Gaillard (lead) Construction New Dock Drop Off - GSJ Construction New Shutters Cabanas - LSJ Construction New Window (opening out) Cabana 1- LS1 Boniface Laudat Construction New Window (opening out) Cabana 1 - LSJ James Cesar Removal of Odd/Broken Hardware/Blind Brackets - MC - GSJ All assisted each other when required Electrical Danny Etienne Fixed Broken Water Line Cabana 2 - LSJ Plumbing/Pump Work Under MB - LS1 Installed Landscape Lights Outside MB - IS1 Working on Installation of Electrical Plates & Devise s all Cabanas - LSJ Keshaun Williams Plumbing/Pump Work Under MB - LSJ Installed Landscape Lights Outside MB - LSJ Working on Installation of Electrical Plates & Devise s all Cabanas - LSJ Engineering Sheridan E. Mee (lead) Commission Carmix Equipment Removal/Disposal of all items beside Engineering Dale Mark Commission Carmix Equipment Removal/Disposal of all items beside Engineering Heavy Machinery Felito Joseph Assisted the Landscapers with tree placement/relocation of Irrigation Line Peter St Omer Assisted the Landscapers with tree placement/relocation of Irrigation Line & Transporting New Soil Pierre Jules Working on Road & Rocks Placement at Pool Cabana - LS1 (Rocks to be removed E Mail 11/30/18 JE) EFTA00805026 Housekeeping 13asillia M. Morales (lead) Housekeeping/Empty Twin Rm (preparation for paintin g) - GSJ Housekeeping/Empty Twin Rm (preparation for painting) - GS) Housekeeping/Laundry - LSJ Housekeeping/Laundry GSJ/LSJ Irrigation Cristobal Herrera Setting up Irrigation Lines to Grasses Pool Cabana Hillsid e - IS) Repaired 4 inch Broken Line Outside Cabana 2 - LSJ Prepared Large Order of Irrigation Parts Ran Entire System checking for leaks etc. - LSJ Landscaping Dupson Donissaint (lead) Constructed Stone Transition Pops Garden - LSJ Working Pebble Beach Construction - LS) Liston Mercer Emptied Out/Replanted with new soil Planter Bed Top of Owners Drive to Relocate Irrigation Line Installation Grasses Pool Cabana Hillside - LSJ Continued Planting at Top of Owners Drive Gael Leatham Emptied Out/Replanted with new soil Planter Bed Top of Owners Drive to Relocate Irrigation Line Continued Planting at Top of Owners Drive Kyle Steward Emptied Out/Replanted with new soil Planter Bed Top of Owners Drive to Relocate Irrigation Line 3:30pm - 6:0Opm - Completed Insecticide Spraying - LS) Nicholas Victorin Removal of Old Grasses on Beach Line - LSJ Installation Grasses Pool Cabana Hillside - LSJ Sainsfrans Dejour Removal of Old Grasses on Beach Line - LS) Installation Grasses Pool Cabana Hillside - LS1 All assisted with clean up all locations Masons Onel Pierresaint Constructed Stone Transition Pops Garden - LSJ Working Pebble Beach Construction - LSJ Gusneme Dalce Barge Mate EFTA00805027 Maintenance/RD Cuthbert Paul Titre Back Washing RO System - LS1 Cleaning/Servicing Pools LSJ/GSJ Gerry Francis Titre Cleaning/Servicing Pools LSJ/GSJ Cleaning Down Vehicles - end of week clean up Okeam Freeman Assisted Housekeeping with emptying Twin Rm (prepa ration for painting) - GS1 Completed Mold Remediation on Ceiling, Wall etc. Twin Rm - GSJ Marine (CaptaIng Patrick Cena Crew Runs Between STT,LSJ,GSJ,SJ Completed Inventory of Small Parts for all Vesse ls Randy Amparo Crew Runs Between STT,LSJ,GSJ,S1 Started Roping of Pillars at Tiki Both worked on getting maintance schedule set up with Offshore Marine which starts next week Office Stephanie Remington Administration - LSJ Worked on Setting Up Crew Log which will start on Mond ay 3rd December Painting Hilian J. Bedminister (lead) Completed Staining Dock - GSJ Continue Sanding Dock - LSJ Primed/Painted Exterior Railings - MC - LSJ Prepared & Painted Repaired Wall Blue Beach Office Aiad Buncome - ISJ Painted Back Wall Pool Cabana after Pictures Instal lation - LSI Painted Repaired Coping - MC - LSJ Dimitri St Omer Painted Back Wall Pool Cabana after Pictures Instal lation - LSJ Primed/Painted Repaired Coping - MC - LSJ Oriole Joseph Primed Painted New Door Under Master - LSJ Primed/Painted Exterior Railings - MC - L.S1 EFTA00805028
ℹ️ Document Details
SHA-256
c398e3c417e769db80ad707b2126e25f5a2e1d1a380f60aab9752595fd385d3d
Bates Number
EFTA00805026
Dataset
DataSet-9
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!