EFTA01022140.pdf
👁 1
💬 0
📄 Extracted Text (227 words)
From:
To: Jeffrey Epstein <[email protected]>
Cc: LSJ GSJ
Subject: Re:
Date: Mon, 24 Sep 2018 14:24:10 +0000
Attachments: LSJ_Proposed_build_out.pdf
attached drawings with propose markups for your review
Notes:
existing Luandry would become a staging area for linen etc
It would be access from the far door below cabana 2
There would be a need to create a covered parking in this location
one issue is where to store boats, possibly GSJ Christmas cove??
Captains Marine would probably move to existing electrical, electrical shop move to engineering space
Just ow thoughts
On Sun, Sep 23, 2018 at 1:43 PM Jeffrey E. leevacation®gmail.com> wrote:
can you guys give some thought to where we can move the tunnel , laundry, staff kitchen. ie new floor on
top of de sal? old generator builidng? new floor etc.
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation®gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
The Saint James Group
USVI
EFTA01022140
ℹ️ Document Details
SHA-256
c4006d3206a9730b006d7dcf0e0d619ef9b8fd6e1e3fe2dec9fec7790427669f
Bates Number
EFTA01022140
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0