📄 Extracted Text (186 words)
GM REPORT
71ST
1. Remco require 4 days to re polish the marble floor and I am waiting for you to tell
me when that would be best
2. You need to decide what material you would like to redo the back passage floors
in so that I can get a sample and you can approve it
3. Th back passage needs repainting. I have received a quote for $3000. When
would you like to shcdule this andoishould pick a colour.
4. When the work is finished at 65th is coming to the hse to fix the ceiling in
the MBR
5. The ceiling above the door the walls and ceiling in the exercise room also need re
plaster and then re painting. I have not shown the additional work to the painters
yet for a quote.
6. The door closer was put on today. I will have Rich adjust the strength of it Mon
7. The carpet from the MBR bath was picked up and will be ready approx
8. The Dome
9. The curtains and need to be taken down and cleaned.
10.
EFTA00577705
ℹ️ Document Details
SHA-256
c40a99b57e1f5687887532cda31dab3f6fab4f62a3d5ac2ee09a336543a956a0
Bates Number
EFTA00577705
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0