📄 Extracted Text (165 words)
Landscaping Scope
1. Main Compound; Need Monthly Maintenance Program, new plant
material in some areas, fertilizer program. Work preformed by LCD and
LSJ staff.
• Owners Residence Building, replace dead plantings, design
• Library, Replace ginger with salt water tolerant plant
• N. Slope lawn
• E. Slope lawn
• Pool Area
• Entrance
• Entrance Road
The Following Areas are finishing construction and need planting design. Low
maintenance, low cost, low water. Maintained by LSJ staff, with LCD direction.
2. Owners Road
3. 5 palms
4. Sun Dial
5. Grotto
6. Triangle
7. Generator Building
The Following Areas wiil be maintained by LSJ staff but need some direction
on plant material and maintenance
8. Flag Pole Pool
9. Kite House
10. Salt House
11. Blue House
12. Pebble Beach House
13. Gym
14. Nursery
General Concerns
15. Fertilizer program
16. Correct Hydro-seed for areas to be kept "natural". Drought resistant,
17. Bug Spraying Program
18. Plant material
19. Salt water tolerant grass
EFTA_R1_02056541
EFTA02697754
ℹ️ Document Details
SHA-256
c42d5d8b5da72446673707ba2cbfd44fa18129e4980c37b051a06e43c4ca96ce
Bates Number
EFTA02697754
Dataset
DataSet-11
Document Type
document
Pages
1