From: Ann Rodriquez
To: "Jeffrey E." <jeevacation®gmail.com>
Cc: Rich Kahn
Subject: Re: CZM meeting today
Date: Wed, 12 Aug 2015 14:14:03 +0000
WHAT! 1st Mr. Rosa came off the boat and immediately started to take pictures. Leighton was on his bike
following Me while I drive Danny, Rosa & Kenny. He also told Rosa that we were moving rocks along the water
front until I intervened. Leighton was only suppose to talk about the mechanical building nothing else. He started
to talk about RIO Roof, Rocks, Zoning, Cape cod & What he's qualified in. Kenny from Jeridian asked me to tell
Leighton to stick to the script and don't add anything extra because his main focus should only be the Mechanical
Building.
Ann R.
On Aug 11, 2015, at 11:15 PM, Leighton Allenby < > wrote:
Hello Mr. Epstein,
Today Anna, Danny Vicars and I met with David Rosa from CZM and Kevin from The Jaredian Design Group
to discuss:
I. Layout of the proposed maintenance and workshop building project
2. Two roofs for the RO Plant and Generator building.
The meeting went well. Concerns & comments brought up by David Rosa:
I. New height of RO and Generator roof from across the waters. I replied that the pitch of the roof was
aesthetically pleasing and roof color chosen by you is soft and blends into the skies. He quickly agreed.
2. He had no concerns with proposed building and 80 foot layout and placement of building. We walked the
proposed layout that Danny Vicars laid out with orange markers.
3. David had a complaint from someone that we discussed. Complaint was that we were creating stone
buffers preventing boaters from coming ashore to the beaches. I assured him this wasn't happening since
I started and that there were natural reefs that prevented the boaters from coming ashore. He agreed an
said that he had to ask as there was a complaint. (Most likely someone saw machines removing rocks
from the shore for the waterfall. We need to be careful.)
4. David wanted to inspect grading of roads. We showed him one of the roads going from maintenance
building to tennis court and he was pleased.
5. We discussed putting in drainage swales after the asphalt and minimizing damage and he agreed that we
would have better control of the water rather than guessing where the drainage swales should be. David
wants protective erosion control at each new drainage swale per permitt. I agreed.
6. We discussed the Coastal Zone Management Act (CZMA) and why it is important for us to observe this
Act. http://www.coralreelgov/grants/noaa/USVI-CZMFactsheet-Jun03.pdf
7. David and I discussed my qualifications, previous projects on coastal zones and my working with the
Town of Falmouth conservation Department on various projects on Cape Cod. David is from Arlington,
VA
8. Kevin from Jaedian mentioned that the working drawings should be completed by the end of September.
They had to have plans modified for proper venting for carpenters shop and fertilizer/chemical storage.
9. Daphne gave me a set of drawings that I will review.
10. I asked David if he will sign off on project and David commented that most likely after he reviews the
plans once more.
EFTA00848833
Best,
Leighton
Leighton Allenby
Director of Pro erties
EFTA00848834
ℹ️ Document Details
SHA-256
c55689fe456604111f1c669ae9d305aaa5546b9b3914381505d0d6a92446577d
Bates Number
EFTA00848833
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0