CGC1514471
Labonte
Construction Services, LLC
4165 Linden Ave.
Palm Beach Gardens, F1.33410
PROPOSAL
Date: 5126/2015
Proposal Submitted to: Proposal #15-173
Mr,. Jeffery Epstein
El Brillia Way
Palm Beach, Florida
STAFF HOUSE
Description Extension
Moore paint Sand and
PAINTING: Sand. prep and paint all interior walls and ceiling with 2 coats of Benjamin 13.950 00
Sand and stain the existing wood floor area under $
paint all doors and tnm with 2 coats of acrylic satin paint.
the office desk ( refinishing of entire office wood floo r not included )
#1 toilet Replace the
GUEST BATHROOM. Repair the water damaged drywall behind the Guest bathroom 2.975 00
bathroom water damaged vanity cab ,net ( counter top and faucet to remain ) supply a new glass bypass $
guest
shower door.
rebuild the
LAUNDRY ROOM: Remove existing waterheater, laundry equpment and deteriorated floor tile,
waterheater pedistal with new 3/4 inch painted plywood. Float and level laundry room floor. supply and instal
fleck vinyl VCT floo ring with moisture inhibitor glue. ( excessive floor leveling or $ 6.19500
new 12 x 12 white / grey
subfloor repairs at additional fee ) Replace laundry room faucets ( 2 ) Reinstall
the existing water heater on the new closet pedistal.
AIR CONDITIONINGS Replace all existing HVAC supply I return grills ( 21 ) and exhaust fans ( 3 ) in all 1,850.00
$
rooms.
SUBTOTAL $ 24.970 00
Labonte Construction Overhead and Profit
$ 3,93000
$ 28,900.00
TOTAL
or
Exclusions: All unforseen rotted wall and floor framing and rough plumbing. window treatment and furniture removal
reinstaltaiton , appliances. HVAC equipment and systems, water heater, additional drywall repairs.
"This Contract" by and between Labonte Construction Services LLC and property Owner Mr. Jeffery Epstein become effective as
of date of owners signature on this proposal. Owner agrees to payment terms below per the scope of work identified on the work
description. Starting on the Commencement Date of and within thirty (30) days of permit isenance and readiness
of the jobsite. Labonte Construction Services LLC agrees to provide the labor and materials per the description listed above. All
additional or changes in work by owner, architect or building dept is to be impbmented per an owner approved change order plus
15% over cost.
Pay schedule: .
50% due at contract signing for scheduling and material order.
40% of contract amount due at painting completion
Remaining 10% of contract at completion.
This proposal is valid for 30 days.
Acceptance of Proposal
Owner: Date
EFTA01194779
ℹ️ Document Details
SHA-256
c6b5c78a1c375e8dd36c1a26961fe0b0c8261695988113ba4264d705c6c1bbbf
Bates Number
EFTA01194779
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0