SUMMARY OF CONSTRUCTION EXPENSES TO DATE AND FUNDS NEEDED FOR
COMPLETION BEFORE BOAT LEAVES VIRGINIA
Purchase Price 150,000
Superstructure Construction 28,000
Fuel Purchase 13,500
Hydraulic Pistons 9,900
Operating Equipment
Gauges — tachs, gauges, senders and keys $335 x 2 770
oil, gauges and lines 120 x2 240
temp, gauges and wires 165 x2 330
ammeters gauges and wire 75 x 2 150
Electrical Panel 450
Raritan rudder Indicator 450
Bilge Pumps 2000ga1 Rule (2 @ $161 each) 322
Hi Water Level Alarm 110
17 Boat Hook 93
Running Lights 325
Cabin Lights (2 Q $50 each) 100
Chart light 48
Searchlight w spare globe 665
Cargo Well lights (2 ® $65 each) 130
Horn 255
Manoverboard Lights ( 2 ® $165 each) 330
Fog Bell 100
24v to 12v Convener 220
12v Deep Cycle Battery 110
12v Starling Batteries (2 @ $210 each) 420
200 amp Battery Charger 175
Fuel transfer Pump 198
2 Crash Pump 440
suction and Discharge Hose 100
2ton Chainfall 115
Tie down Straps for fuel tanks (4 © $35 each) 140
Fire Extinguishers (4 ® $ 145 each) 580
Mounting Brackets (4 ® $62 each) 248
VHF Radio Icom 422 220
Radio Antennae and Mount 176
Radar Furuno1930 -36 mile 5,100
GPS Garmin 365
EPIRB Call 1,070
Compass 270
Life Jackets w lights,whistlos (6 ® $110 each) 660
Life Float incl float-free link and line 1,390
Life rings (2 CO $125 each) 250
Flare Kit 305
Boat Line 600' 3-strand nylon 1,055
Anchor Chain 3V % Galvanized Chain 240
Misc. Shackles 150
STEEL AND ALUMINUM TO COMPLETE MODIFICATIONS IN ST THOMAS
2 — 718* 4' X IV Steel Plate for Hinge Ramps 1,375
EFTA00616386
SUMMARY OF CONSTRUCTION EXPENSES TO DATE AND FUNDS NEEDED FOR
COMPLETION BEFORE BOAT LEAVES VIRGINIA
4 - 1" x 20' Aluminum Square Stock for ramp sliders tbd
1 -4- x 20' I-Beam for Entrance Ramps tbd
1 - %" x 4" Flat bar for Hinge ramp support tbd
All of the above Items are being procured and installed by Ireland Marine of Chesapeake. Virginia.
Labor rates for installation is quoted at $50/hr. approx 40 hrs is projected 2,000
To this point Ireland Marine is due a wire transfer totaling $ 58, 132.00
by May 22, 2007. Including approx. labor and tbd items a wire for $ 60,000 should do.
I will provide funds for any additional items that I may have missed (I'm sure I have).
We will need recurring supplies like filters and hoses etc.
Emad, this should give a real dose budget of expenses.
Please seek approval ASAP as ticket prices will change as advance purchase narrows.
Total Cost 223,640
Purchase Price (Paid in Full) (150,000)
Superstructure Construction (paid 50%) (14,000)
Balance due before 5/22/07 of-0-4+--4 t'd $ 59,640
Wo 7
EFTA00616387
ℹ️ Document Details
SHA-256
c6eed75fff3072e8ada1629d795904eece6ad2c5d00b1c1c616c542c0c780e5c
Bates Number
EFTA00616386
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0