EFTA02426575
EFTA02426576 DataSet-11
EFTA02426577

EFTA02426576.pdf

DataSet-11 1 page 151 words document
P17 V16 V11 V15
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (151 words)
To: Jeffrey EpsteinUeevacationagmail.comj From: William Murphy Sent Mon 4/12/2010 2:44:30 PM Subject ETC Quotes WM I spoke to Rich last week about sending the wire out to ETC for a 50% deposit and realized, after speaking with him, that I did not have that total cost included as an estimate in the quote you signed. They had a line item identifying installation and programming at $800 per day plus expenses. We expect to have LSJ and FTC installed and initially configured together between 5/3 and 5/14. This line item will an additional $11000 including airfare and accommodations. just wanted to make sure this was ok prior to proceeding with the wire. I would like to be there during this time to assist as needed and provide direction. Just wanted to make sure that was ok by you as well. Thank you, WM William Murphy Systems Administrator — HBRK Associates EFTA_R1_01495496 EFTA02426576
ℹ️ Document Details
SHA-256
c710364ddbcc7eb4b5f9322918cd7c47dc4a4176f567783a56d17b395771acd2
Bates Number
EFTA02426576
Dataset
DataSet-11
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!