📄 Extracted Text (151 words)
To: Jeffrey EpsteinUeevacationagmail.comj
From: William Murphy
Sent Mon 4/12/2010 2:44:30 PM
Subject ETC Quotes
WM
I spoke to Rich last week about sending the wire out to ETC for a 50% deposit and realized, after
speaking with him, that I did not have that total cost included as an estimate in the quote you
signed. They had a line item identifying installation and programming at $800 per day plus
expenses. We expect to have LSJ and FTC installed and initially configured together between
5/3 and 5/14. This line item will an additional $11000 including airfare and accommodations.
just wanted to make sure this was ok prior to proceeding with the wire.
I would like to be there during this time to assist as needed and provide direction. Just wanted to
make sure that was ok by you as well.
Thank you,
WM
William Murphy
Systems Administrator — HBRK Associates
EFTA_R1_01495496
EFTA02426576
ℹ️ Document Details
SHA-256
c710364ddbcc7eb4b5f9322918cd7c47dc4a4176f567783a56d17b395771acd2
Bates Number
EFTA02426576
Dataset
DataSet-11
Document Type
document
Pages
1
Comments 0