📄 Extracted Text (257 words)
To: jeevacation©gmail.com[[email protected]]
From: IvjeI
Sent: Fri 2/19/2010 3:08:20 PM
Subject: D model thoughts
Jeffrey,
I thought I would share my thoughts on the D contract,
If you decide move fwd on the D helicopter I would keep it as standard as possible to keep the price at 12,120M
with the understanding of George sell this position later down the line before delivery to maximize your profit.
The big gamble is whether the ID pricing will be reduce in 24 months to our early delivery price if know one is
buying these machines.
I need to review the specs and see what is standard equipment, so we are at least getting a good basic package
for resale„even the Phantom seats should not be expensive to reproduce. Using Eric Roth as a completion
center is costly and need to decide if Keystone is going to be your completion center, If we are going to roll this
heli for profit, It may make sense to use Keystone to keep the price down.
The AB 139 Helicopter is kilfing the S76 sales in price and size at this time„,my gut feeling is Sikorksy will
reduce their 14.1M regular price to compete against the AB139's in the furture.
maybe we should reduce the 12.1m offer to a lower number?
thanks,
Larry
ps: Since George is marketing your new S76 for sale at 12.5M, I think we may have it priced to low, since it is
the smoothest, quitest, must luxurious C++ they have every produced, and that is worth something.
EFTA_R1_01500499
EFTA02430530
ℹ️ Document Details
SHA-256
c710b2337ac69ab54b5a816f773133f2aad403898f0629b80b56a37fe75bb90b
Bates Number
EFTA02430530
Dataset
DataSet-11
Document Type
document
Pages
1
Comments 0