EFTA00613629
EFTA00613630 DataSet-9
EFTA00613631

EFTA00613630.pdf

DataSet-9 1 page 413 words document
P17 P23 V11 V16 D1
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (413 words)
CGC1514471 Labonte Construction Services, LLC 4165 Linden Ave. Palm Beach Gardens, FI.31410 (5611601-0446 PROPOSAL Date: 5/26/2015 Proposal Submitted to: Proposal #15-173 Mr,. Jeffery Epstein El BnIto Way Palm Beach, Florida STAFF HOUSE Description Extension Sand and PAINTING: Sand, prep and paint all interior walls and ceikng with 2 coats of Benjamin Moore paint and trim with 2 coats of acrylic satin paint Sand and stain the existing wood floor area under $ 13.950 00 paint all doors the office desk. ( refinishing of entire office wood floor not included ) Replace the GUEST BATHROOM: Repair the water damaged drywall behind the Guest bathroom #1 toilet. damaged vanity cabinet ( counter top and faucet to remain ) supply a new glass bypass $ 2,975 00 guest bathroom water shower door. rebuild the LAUNDRY ROOM: Remove existing waterheater, laundry equipment and deteriorated floor tile, waterheater pedistal with new 3/4 inch painted plywood. Float and level laundry room floor, supply and install ( excessive floor leveling or $ 6,195.00 new 12 x 12 white / grey fleck vinyl VCT flooring with moisture inhibitor glue. subtloor repairs at additional fee ) Replace laundry room faucets ( 2 ) Reinstall the existing water heater on the new closet pedestal. AIR CONDITIONING: Replace all existing HVAC supply / retum grills ( 21 ) and exhaust fans ( 3 ) in al $ 1850.00 rooms. SUBTOTAL $ 24,970.00 Labonte Construction Overhead and Profit 11% $ 4,494.60 TOTAL $ 29.464.60 removal or Exclusions: All unforseen rotted wall and floor framing and rough plumbing, window treatment and furniture reinstallaiton, appliances, HVAC equipment and systems, water heater, additional drywall repairs. become effective as "This Contract" by and between Labonte Construction Services LLC and property Owner Mr. Jeffery Epstein agrees to payment terms below per the scope of work identified on the work of date of owners signature on this proposal. Owner Starling on the Commenceme nt Date of and within thirty (30) days of permit issuance and readiness description. the labor and materials per the description listed above. Al of the jobsite. Labonte Construction Services LLC agrees to provide by owner, architect or building dept is to be implimented per an owner approved change order plus additional or changes in work 15% over cost. Pay schedule: . 50%due at contract signing for scheduling and material order. 40% of contract amount due at painting completion Remaining 10% of contract at completion. This proposal is valid for 30 days. Acceptance of Proposal Owner Date EFTA00613630
ℹ️ Document Details
SHA-256
c83d38c3d36855ed0f6a95fbdddf19f3cc1134ac8a35de605d992a83ba6c25b4
Bates Number
EFTA00613630
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!