EFTA00671761.pdf

DataSet-9 2 pages 482 words document
👁 1 💬 0
📄 Extracted Text (482 words)
From: Daphne Wallace To: Jeffrey Epstein <[email protected]> Cc: Subject: Cleanup of the Engineering shed bays - July 31, 2012 Date: Tue, 31 Jul 2012 21:52:04 +0000 Attachments: Bay_In new_Engineering_storage_(1).JPG; Bay_In new_Engineering_storage_(2).JPG; Bay_In new_Engineering_storage_(3).JPG; Bay_2n new_Painting_storage_(1).JPG; Bay_2_-_new_Painting_storage_(2).JPG; Bay_2_-_new_Painting_storage_(3).JPG; Bay_3_- new Landscaping_storage_(1).JPG; Bay_3_-_new_Landscaping_storage_(2).JPG; ilayi t new_Landscaping_storage_(3).JPG; Bay_4n old_Engineering_office_(1).JPG; Bay_4_-_old_Engineering_office_(2).JPG; Bay_4n old_Engineering_office_(3).JPG; Bay_4_-_old_Engineering_office_(4).JPG; Bay_5n old_Desal_(1).JPG; Bay_5_- _old_Desal_(2).JPG; Bay_5_-_old_Desal_(3).JPG; Bay_5_-_old_Desal_(4).JPG Greetings Mr. Epstein, I spoke with Danny this afternoon regarding your directive for cleaning up the 5 storage bays in the Engineering shed. Outlined below is his plan, for your review, comments and approval: Bay 1 (new Engineering storage): Build in the shelving Paint the walls and shelves Brian will create a cement cap for the air vent on the back wall Bay 2 (new Painting storage): Complete the shelving Paint the walls and shelves Cement cap for the air vent on the back wall Bay 3 (new Landscaping storage): Build the shelves Paint the walls and shelves Cement cap for the air vent on the back wall Bay 4 (Old engineering office - probably will become additional engineering storage) Build a subwall to hide the old electrical - there must still be an access panel because this electrical is still in use powering the Manager's cottage and Danny will rewire it to also power the Engineering shed - shelving will be built on the subwall The existing shelving to the left will be cleaned up and additional shelving added The Chromix presently stored in this bay will be discarded - it was purchased to complete the main entrance, before the plan was changed to apply the "Devil Mix" gravel instead Bay 5 (Old desal - probably will become additional engineering storage) Danny plans to completely dismantle the old plant Build shelving Paint walls and shelves The floors in all of the bays are currently tiled. In two of the bays the floors were leveled/filled during the wall repair. Danny had no plans to retile the floors. He also plans to rewire all 5 storage bays. EFTA00671761 Danny presently does not have a timeframe for your review and approval for completing what is outlined above, but will work on it this week. Currently, Clement and Benny are fabricating the doors. They will start on the framing tomorrow. I asked if having the doors on the old engineering and desal bays will pose a problem when the interior construction and dismantling begins. They will not because the door hinges will allow for the doors to be removed and replaced easily so they are out of the way. Danny believes the water on the floor in the old desal bay is due to a leak, which he will address when the desal is dismantled. The water at the entrance of the bays not under the shed is due to rain going in, which will be prevented once the doors are in place and sealed. Respectfully submitted, Daphne EFTA00671762
ℹ️ Document Details
SHA-256
c849e30dccdc00d30a6a1aa4c2bf4da08578655e2a565d24e83fc695bfcf3f73
Bates Number
EFTA00671761
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!