EFTA00496098.pdf
👁 1
💬 0
📄 Extracted Text (287 words)
Subject: RE: Shade Structure/Engineering Doors Bid (LSJ/GSJ)
Date: Sun, 26 May 2019 03:00:21 +0000
Attachments: LSJ-Engineering_bldg.pdf; LSJ-Shade_structure.pdf
Hello
Please find attached the proposal for the Shade Structure and the installation of doors at the engineering
building.
Have a wonderful weekend.
Regards
John
Original Message
Subject: Re: Shade Structure En ineerin Doors Bid (LSJ/GSJ)
From: >
Date: Wed, May 22, 2019 6:56 m
To: John Bedminster < >
Cc: Mike Glidden < >, Da hne Wallac
< > Ann Rodriquez < >, Rich
Kahn <
Hello John and thank you for your reply! We look forward to receiving your quote by Saturday for the
Shade Structure and Engineering Doors...
On May 22, 2019, at 8:41 PM, < >< > wrote:
HI
Sorry about the late response, I was pouring concrete today. I am working on preliminary layout to
determine all possible aspect of the shade structure located at the flag pole and pool area. I should be
able to deliver the estimate(s) by Saturday the latest. Please let me know if that is okay with you. I
will be on St. John in the morning and may not have phone service. If any thing please send a text.
Best Wishes
John
Original Message
Subject: Shade /Engineering Doors Bid (LSJ/GSJ)
From:
Date: Tue, May 21, 2019 2:46 pm
To:
Hello Mr Bedminster. I would like to follow up on the bid you are to propose for the shade structure
located at the flag pole pool Mike Glidden has shown you on our island. Can you please get back to
me as soon as possible with this bid?
EFTA00496098
Also wondering about the bid for the engineer doors?
Please let me know!
Thank you,
LS]/GS)
Sent from my iPhone
EFTA00496099
ℹ️ Document Details
SHA-256
c913cb875eed539b69b1c2d623ad9078b2437ba372a993b842cb8a28eae2eece
Bates Number
EFTA00496098
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0