EFTA01173169
EFTA01173170 DataSet-9
EFTA01173171

EFTA01173170.pdf

DataSet-9 1 page 488 words document
P17 V16 P19 P18 V15
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (488 words)
I o: Freedom Air International Email:• .Attention: Larry fisnski Fax No: From: PremlAIr Commercial Department Fax No: -1- 44 (0)1252 1354:229 ESTIMATE No_ PA E/IFI EI/1 0001 227,1 - 1C dated 1 8-01 -201 2 Aircraft Feeigistration:N901RL PremiAir Aircraft Engineering Ltd is pleased to provide an estimate as follows: - Work order: TEIC I asks: (Description: To Carry out Maintenance regarired hrinorrin toe nimratt l in to a flying condition. Labour: 321 hrs ti„) £75.00/hr £24,075.00 1. To Perform b0/100/160/300/000 Hour and 12/24 fkilc-Inth insp. 2. To Provide and install x1 -rail Rotor Blade. 3. To Overhaul Autopilot servos, to remove/refit 4. To Refurbish Wheels and Brakes. Repaint sliver. 5. To Replace x3 Tyros, 0. To Remove Existing Particle separator arid Install II5F System, 7. To Replace Pilots I legated Windscreen, 8. To Carry Out Sample Testing of Cngines and Gearbox oils, 0_ To Carry out Main Rotor Track and Balance (Inc in item 1.) 10. To Inspect the Main Rotor Hub for Corrosion (Inc in itom 1.) 11. To Replace x3 TROS bearings, 12. To Carry out Main Oriveshaft Strip/Inspect/Rebuild and Dynamic balance. Part costs as above 2. To Provide and install x1 Tail Rotor Blade, $34, 643. 70" 3 To Overhaul Autopilot servos, to remove/refit $ 86. 250. 00" 4. To Refurbish Wheels and Ftral-cenx. itepaint salvor, $5,080.70 5. To Replace x3 Tyres. $2,000_00 G. To Remove Existing Particle separator and Install IBF System, .S5 f, /CPU. 00"r" 7. To Replace Pilots Heated Windscreen, $61,4913 55" 8. To Carry Out Sample Testing of Errstiries and Gearbox oils. £200.00 11. To Replace x3 TROS bearings, $8,414.55 Total $255,5137.50 £24,275_00 Should you have any technical queries pleas e contact Engineering, and for Commerci a - l issues please contact the Commercial department. Should you wish to proceed, please return a duly signed and datod copy of this estimate by return to fax number: 4-44(011262 864229 or email: naecommercialCa)rsrennlair cresaincorino.com ONLY TERMS a CONDITIONS - Labour charges are not inclurded in this estimate unless • PrerniAir Standard Conditions of Trading for the otherwise stated above. snue rat a- cods and services apply - Valid rat 30 days, subject to prior sale or withdrawal • Overhaul prices are for Standard Overhaul only • Price quoted exclusive of VAT al current rate • Errors and Omissions Fxrepferf - price quoted exclusive of freight/import/exporL & duties • Exchange items subject to supplementary billing • Payment Terms: SO% on signing of Estimate, Prior to work aaaaaa enciou, Balance on completion. Note: Items marked with ("46) in accordance with ForesniAir policy ally items over $30,000.00 payment ire Advance on signing of astrimatc", prior to work commencing. PrerniAir Aircraft Etwatacrirsa nes Fleasalnnnta AvIntleset centre Slacichtishe Airport Camberley Stnrruy OU17 9L0 United Kingdom Tel: .44 (0) 1 l'aff,7 ASICIORA Far 144 (0) 1262 8C54:399 email: intoaprerniair-anoineerinp.corn Web: %An...eve-pram.° ill MN sUitb•• mgrinri. corn Ftsauimil•orrni ^rich -eases: Sixth Floor, 90 Fetter Lana, Lensele-an Ce4A1 No. 1128280 EFTA01173170
ℹ️ Document Details
SHA-256
ca3c715aa3d12a81984e4b09047454c6c7f521ddc657ec4916a369f65e1a75a8
Bates Number
EFTA01173170
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!