EFTA00972142
EFTA00972143 DataSet-9
EFTA00972148

EFTA00972143.pdf

DataSet-9 5 pages 765 words document
P17 P19 V16 D4 P22
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (765 words)
From: Richard Kahn To: Jeffrey Epstein <[email protected]> Subject: 71st - 6th floor Date: Tue, 24 Oct 2017 00:01:54 +0000 Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 tel fa cell Begin forwarded message: From: Richard Kahn Subject: Fwd: 6th floor Date: October 23, 2017 at 7:52:02 PM EDT To: Merwin Dela cruz who did wiring? please find out if it is 4k thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 tel fax cell Begin forwarded message: From: Al Buonanno < EFTA00972143 Subject: RE: 6th floor Date: October 23, 2017 at 7:41:23 PM EDT To: Richard Kahn < Cc: Merwin Dela cruz Hello Richard, Wiring from the projector to the equipment rack could possibly take two men a full day and may require cutting holes in the ceiling. I cannot absorb that cost. If you like I will requote with the worst case scenario providing ample cost for rewiring. Patching and painting will not be included. We were not involved in the original installation and have no knowledge of the existing wiring pathway/conduit. If there is a conduit in place and the wires can easily be pulled through then that would mitigate the scenario above. It would still require additional time. Thank you, Al From: Richard Kahn Imailto: Sent: Monday, October 23, 2017 7:35 PM To: Al Buonanno Cc: Merwin Dela cruz Subject: Re: 6th floor thank you for explanation boss will proceed with turn key solution but will not pay for additional wiring costs.. i believe your quote has enough cushions to absorb wiring costs.. please let me know how you want to proceed thanks Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 tel fa cell On Oct 23, 2017, at 7:30 PM, Al Buonanno < > wrote: Hello Rich and Merwin, Basically that means that if there is a problem with the wiring to the projector then that work is additional. It can be by another vendor or by Clarity for and additional fee. I hope this helps. EFTA00972144 Al From: Richard Kahn fmailto• Sent: Monday, October 23, 2017 6:28 PM To: Al Buonanno Cc: Merwin Dela cruz Subject: Re: 6th floor ok to proceed with install on thursday not sure what optional cable from marantz processor to projector BY OTHERS means.. thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York NY 10022 tel fa cell On Oct 23, 2017, at 4:54 PM, Al Buonanno < > wrote: Hello Richard, Pending the availability of the receiver we can start immediately, possible Wednesday or Thursday. Someone removed all of the Crestron equipment but we did include programming for the URC-MX-980 remote control. All cable are 4K compliant. Note: We do not know that integrity of the cable from the processor to the projector. We will bring enough cable for and external (testing/temporary) set up should the existing in wall/ceiling fail. Thank you. Regards, Al From: Richard Kahn [mak° Sent: Monday, October 23, 2017 4:22 PM To: Al Buonanno Cc: Merwin Dela Cruz Subject: Re: 6th floor A few questions: I) how soon can you install 2) please confirm labor includes crestron programming. 3) please confirm all cables are included for 4K EFTA00972145 Thank you. Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York NY 10022 Phone Fax Cell On Oct 23, 2017, at 3:39 PM, Al Buonanno < > wrote: Hello Richard and Merwin, Please find attached a proposal to perform the 4K video upgrade as requested. Please contact me with any questions. Thank you. Regards, Al Original Message From: Richard Kahn [mailto: Sent: Monday, October 23, 2017 10:18 AM To: Al Buonanno Cc: Merwin Dela Cruz Subject: Re: 6th floor any update on receiver quote and timing to install please advise thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York NY 10022 tel fa cell On Oct 20, 2017, at 4:50 PM, Al Buonanno < > wrote: Sony. A bunch of stuff just overwhelmed us. I will have it on your desk first thing Monday. I may send it out over the weekend but that may not be much of a help. Original Message From: Richard Kahn [mailto: EFTA00972146 Sent: Friday, October 20, 2017 4:28 PM To: Al Buonanno Cc: Merwin Dela Cruz Subject: 6th floor any update on proposal? please advise thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 tel fax cell <171023 Kahn 9 east 71st 6th Fl 4K upgrade.pdf> EFTA00972147
ℹ️ Document Details
SHA-256
ca7517448d4c0dd82abd7ca3a2c504e80a3cdd5f4ca562e148da102c163a7097
Bates Number
EFTA00972143
Dataset
DataSet-9
Document Type
document
Pages
5

Comments 0

Loading comments…
Link copied!