2019 (Si Punch List-#1 ORIGINAL ITEM NUMBERS Including Notes from Conf. Call May 24, 2019 JEFFREY'S PRIORITIES 7 Emergency Room-EKG Machine -Jeffrey said he knows what he wants-tell 23 GSJ Cottage Expert Builders-Hoping to complete by end of July/barge being down could cause delay, hoping not (he is trying to cover his ass) 24 GSJ Helipad Helipad-waiting on the barge (need the cement) 34 Flagpole Pool Shade Structure- Bedminster delivered 2 truckloads of supplies July 2. Hoping to do Layout on Fri July 5 or Mon. July 8. (Demo is Done! Bedminster won bid, has not started. Bid for labor only. Roof Tiles and floor tiles to be provided by who? Did Mike discuss with Bedminster yet?) 43 GSJ R/O 2nd R/O Intake-Mike, where are we with this? 45 GSJ New Dock Water Sport Ramp- (area has been cleared out and ready for decisions. Bella sent wire 2 days ago for portable dock ramps.) 47 Maurice Brother ? Mike, where are we with this? Is he coming to do some work? 94,95,96 LSJ Cistern 1,2,3 Cistern Pumps-3rd pump ordered -requested ETA (Daphne)- 97 GSJ R/O R/O Container -Mike, where are we? 98 GSJ R/O parts R/O Parts- this is part of the container #97 (Mike) 103,104,105,106 Cabana 1,2,3,4 Dimmers-Cabana 4 is DONE, working on Cabana 1,2,3 112 Cabana 1 Rope Light -Jeffrey likes brighter rope light. Mike to order more. 143 Old Heavy Machinery Removal-we need barge back-when is ETA for barge now? 152 AYH / Big N Fenders-Daphne to FU w/Carlos re quote, must go via Tropical-too heavy/EDA to production completion 8/2 153 AYH / Big N Cleats -Cleats being installed. TO DO LIST EFTA01220982 1 LSJ/GSJ Seth "Mold"-Daphne 3 LSJ MC Kitchen Banquet 8 Theater Room Blackout Curtains-Ordered on June 11/ETA. Ship to PB July 9-11 15 LSJ/GSJ Solar Lights-ordered from China, arrival date July 3 16 LSJ/GSJ Sun Umbrellas-JE to order 18 Five Palms-Electrical is in Progress now-wires pulled 19 Grotto ?-In Progress 21 New Road Road Project-JEFFERS has NOT Started...NEED BARGE. (MIKE)Jeffers to do walk through today, May 24, start Tues May28 25 GSJ Generator Exhaust -Completed? 26 LS1 Tunnel Skin it-NEED TO CHOOSE BID Rich to look at bid (Bill Terry) 27 Wreckshop 40x60 Bld.-NEED TO CHOOSE BID-Bill Terry to look at (Rich) 28 HM Storage 00x00 Bld. ?(heavy machinery. Skinning) CHOOSE VENDER 29 LSJ Fuel Room Vents-Reefco to order (Rich following up) 31 LSJ/GSJ ? Permits 32 Waterfall (Tiki or Park) Slab-Peter Ely and Mike(?) 33 Gym Doors -Per JE do not install yet...on HOLD 35 LSJ Tiki Hut Freezer-? Did Daphne order 37 Dock (LS1 or GSJ) ? Permits-Mike? 38 Christmas Cove Moorings Moorings-part of permits...Cecile? 39 Old Generators Old Generators-Mike to deal w/this since Terry was let go 41 Five Palms ? (Mike-Barge? Scissor lift?) 42 Five Palms Concrete-project w/Mike and Peter Ely 44 GSJ New Dock Dock Expansion-in Progress, Brian working on this 46 Cables ? Cables ?-Paul Gandy provided Quote (Mike) 48 Heavy Machinery Trencher -Mike-purchase trencher? 50 LSJ MB Bath Shower Tiles- ? change out? Not sure what you want 52 LSJ Main Compound Mockup Planter-changed to gazeboes 63 LS1 Dock Water Sport Dock Box-_ Needs to ask- advise on new carpenter (Brian was working on this but moved to Holy Shit Dock) 67 LSJ/GSJ Tiki sheds Thatch-Thatch will be moved to Holy Shit Dock 71 Barn ? Barn —Jeff Boschulte submitted for permit June 13/Sent follow up mail today (June 20) asking where we are with this. Did Mike choose a manufacturer? (Allied or Buck Steel?) 75 GSJ New Dock Dock Shed -Brian, working on this now 76 LSJ TikiHut Coral Stone-Tiling should be completed week of June 26 79 Tiki Terrance Brown stain-80% completed, awaiting tile to be completed 80 LS1 Dock Polyurathane -must be done on a weekend when less pp using it 87 Emergency Room Fax -Jermaine, done?-we need to test 89 LSJ Island Emergency PA System -Jermaine/Liston is to advise 90 GSJ Island Emergency PA System -Jermaine/Liston is to advise 93 New WIFI System LSJ/GSJ WIFI -should be completed by June 30th 99 R/O Water Water Testing -Mike to order new UV Water System for Master Bedroom, RO Plant and Main Compound EFTA01220983 110 Flagpole Pool Kitchen -need to install kick plates (Sylvester to do next week June 25th) 111 GSJ Peters Point Solar Lights/Other-Ordered from China Arrival date July 3 114 LSJ MB Bath Shower Drain-JE, what is this about? to get more info from Mike 116 Library Air Handler- Reefco, Mike/Daph Dave will order May 27, Daphne to follow up (custom machine, 6 weeks) 117 IT Server Room A/C Unit-Reefco/Mike 118-121 Cabana 1,2,3,4, A/C Unit-Shipping May 31, Goal to install week of June 3 122 GSJ Office A/C Unit-Mike 123 GSJ Bedroom A/C Unit- Mike 124 GSJ Living Space A/C Unit -Mike 125 LSJ Tiki Hut Tiki Parking-JE to Advise, on hold for now 126 GSJ Solar lights-China order arrival date July 3 129 GSJ Stones Stones-Barge Needed 130-133 GSJ Solar lights-China Arrival date July 3 136 LSJ/GSJ Equipment Quadski- Rich sent deposit June 20 137 LSJ/GSJ Equipment Dump Truck -done 138 LSJ/GSJ Equipment Fuel Truck / Flatbed-not done 140 LSJ/GSJ Equipment Electric Carts -ordered when will we receive? Daphne? 141 LSJ/GSJ Equipment ProGator -Confirm w/Rich or Daph as they need to advise 142 LSJ/GSJ Equipment Roller-arrived, but we need barge to pick up 144 GSJ Engineering Shed Berm-blocked off, but need to confirm if fully blocked off (this is in progress) 145 Nautica Boat A/C- A/C needs starter, Randy has it, but can't install until Nautica comes home in mid August 146 Nautica Boat Tubes -need answer from Randy/Carlos 147 Nautica Boat Structure -need answer from Randy/Carlos 148 Sportis Boat A/C — Randy says needs a generator - this job will have to be out- sourced to Reefco - Daphne will follow up on the quote 149 GSJ Water Front Sail Boat -on Hold for now (Rich/Cecile/JE to advise) 150 Christmas Cove Boat debris-need Barge 151 New Crew Boat Crew Boat-Carlos/Patrick 154 PR / Big N PR Repairs -Barge in PR, more repairs 155 New Barge New Barge -Boscoe to advise 156 GSJ MC Kitchen Kitchen-Myla heading there on Monday June 24 to do deep clean 157 GSJ Office JE Office -Myla to do deep clean Mon. June 24 159 LS1 Suburban Accident-Carlos/Rich to advise (quote accepted?) 160 TWA Hanger Tracks - 161 TWA Hanger Fridge-Carlos bought new fridge 162 TWA Hanger Hanger Doors- Aaron Cancelled original dates due to dad's illness/They will now come in July sometime 163 TWA Hanger Fire Safety-Carlos to advise NOTE: #83 is deleted as it was a duplicate of #73 `Sam's Place Bedroom' EFTA01220984 DONE: 5,6 3 Oxygen Tanks (Master Kitchen, Office, Ambulance) 77 Library Johnson Wax- 68 LSJ MC Kitchen Doors- 70 Cabana 3 Shower Tile- 9 Theater Room Carpet 84 LSJ Dock-Nest Cam- 72 GSJ Terrace Chandelier- 51 LSJ MC Kitchen Kick Plate — 10-11 Housekeeping Washers/Dryers- 158 JE Denali A/C 14 Sam's Place-Furniture 55-62 Cabana's 1-4 Need Cabinet Handles, Pushtabs, Shutter Pulls 73 Sam's Place Bedroom 74 Sam's Place Guest Bath 81 Tunnel Roof 102 LSJ Library Wall Sconces- 107 Flagpole Pool Dimmers-this is now demo'd 2 Cabana's Motion detector lights 4 Master Bedroom JE Pillow-Karyna 12 Gym Air out-Demo'd 13 Cottage Furniture-Myla loves furniture and got new TV 17 Welder -Gate Completed 22 LSJ Generator Room Hurricane Shutters- 36 Flagpole Pool Freezer -JE said he does not want 49 LSJ Facilty Entrance Service Gates 53 Tunnel Entrance Tunnel Gate 54 LSJ Helipad Heli Service Gate 64 Christmas Cover Container shed 65 GSJ Tiki Terrace Small Dock box 66 GSJ Tiki Terrace Wooden Furniture 69 GSJ New Dock 4 Post -Brian is working on this (party of Holy Shit Dock) 78 Grotto Steps -painted by TJ 82 Christmas Cove Structure- 85 Emergency Room WIFI 86 Emergency Room Computer 88 Emergency Room Phone 91 Cost-U-Less IT Equipment 92 Chillax 82" TV 100 Flagpole Landscape lighting 101 Info Center Landscape lighting 108 MC New Planter Lighting EFTA01220985 109 Tiki Waterfall Pond Fountain 113 Cottage -Cottage is fine now...all repairs done 115 Sam's Place Guest Bath 127 LSJ Landscaping Irrigation 128 LSJ Main Compound Stone Wall 134 GSJ Orlianders 135 LSJ / GSJ Landscaping Chemicals 139 LSJ/GSJ Equipment Mules-do not want Mules-want electric carts 30 Engineering Doors-John Bedminster won the bid as of June 11 More NOTES from Conference Call May 24, 2019 -When will we have water on GSJ to irrigate? Need pipes/parts... Mike to get with Bill Terry on irrigation (around the house and around the house and pool) -Hire someone to do this. -40 Flagpole Pool Awning- No Awning, Just the shade structure -Fuel Tank Rooms- Dave reduced initial quote by 4500 and will order today (May 24) hopes to have by June 15'" and will then schedule to install-Rich Followed up EFTA01220986
ℹ️ Document Details
SHA-256
ca9cda78a773dc266a93c42dc95ab7bf2addb54a1e28e49098bf472d61de4a2f
Bates Number
EFTA01220982
Dataset
DataSet-9
Document Type
document
Pages
5

Comments 0

Loading comments…
Link copied!