ELTONMIMES
200-7-12 Estate Altona
Charlotte Amalie, St Thomas
Listed below you willfinda breakdown ofthe home improvement construction tasks we
discussed The items listed below are intended to give the client an idea oftasks to be performed
andgeneral labor cost. As you review the estimate and begin to explore your options. we
encourage you to make a list ofquestions. comments and/or suggestions.
Proposal and Contracj
We propose to furnish all labor necessary to complete the following project for (Jeffrey
Epstein) located at
Lirrt.E St JAMES E.S.Vtl
Overview of Project:
DEMOLITION TASK:
o Demo existing gazebo and discard
o Remove and discard debris around pool area
NEW CONSTRUTION TASK:
o Construct a gazebo 20'x40'x9' (as shown on
working drawing)
EFTA00309276
o Construct (8) gazebo supporting pads 32"x32"
o Construct (8) gazebo supporting columns 16"x16"
o Continue with (8) columns up to beam height
o Construct 16" bond beam around columns perimeter
o Frame roof with 3"x8" rafters and 3"x10" hips (4/12
roof pitch)
o Install 2"x12" fascia board around roof perimeter
o Cast rafter in place with concrete
o Remove all concrete forms
o Install two (2) layers of 3/4" O. plywood over roof
framing
o Install 1"x6" purlins over roofing plywood
o Install ceramic shingle tiles over purlins
o Plaster all exposed concrete columns and beams
o Install drop ceiling
o Paint all exposed columns and beams
o Tile gazebo floor
EFTA00309277
Construction Schedule for Completion of Work
The approximate date when the work will begin: the three days after acceptance of
contract and deposit payment.
2. The approximate date when work is to be completed will be: All work as outlined
above shall be completed in approximately 8-10 weeks (weather permitting) upon acceptance of
contract.
3. WORK WILL BE SCHEDULED: Per discussion and agreement with Homeowner.
4. The terms and conditions on the attached sheets are expressly incorporated into this
contract.
Payments
TERMS:
Any additional work outside of the scope of work outlined above will be considered a change
order and will incur additional charges.
Total Contract Price: S77.874.00. Payment Terms as follows: ($25,958.00) due upon
acceptance and signage of contract. Another payment of ($25,958.00) is due upon casting of
rafters in place. Remaining balance: ($25,958.00) due at the completion of project.
Failure to make payment may result in work stoppage. The Owner has the right to rescind the
agreement within (3) business days of the date of the signing of this contract.
In the event the owner prevents Contractor from completing the work defined by this contract
after the Owner's right to rescind has expired, then the Owner will forfeit the entire deposit
amount (if applicable) as set forth in this agreement.
Once the construction has commenced, if the owner refuses to permit Contractor to complete
such installation, since materials are specifically made and/or obtained of use relevant to the
work pursuant to this agreement, the Owner agrees to pay Contractor 100% of the entire contract
price as liquidated damages.
CONDITIONS OF ACCEPTANCE:
The above prices, specifications and conditions are an estimate of work to be done. Contractor
will supply all materials unless otherwise specified. Any change orders or additional work
outside scope of work listed will be charged accordingly. I, the undersigned, accept the attached
proposal and description of work as indicated above
EFTA00309278
LIMITED WARRANTY:
All implied warranties include the warranties of the merchantability and fitness for use unlimited
to the period from the date of acceptance of the documents. The workmanship warranty is valid
for (1) one year. Contractor will be responsible for limited construction defects related to project
as outlined above.
Signature of Contractor: Signature of Client:
Date Date
EFTA00309279
ℹ️ Document Details
SHA-256
cb0ddb9680ec699bed258bc523fc5801bc5328d8414b803ee530bc2ee41899e9
Bates Number
EFTA00309276
Dataset
DataSet-9
Document Type
document
Pages
4
Comments 0