EFTA00764723.pdf
👁 1
💬 0
📄 Extracted Text (92 words)
From: "William Murphy"
To: "Jeffrey Epstein" <[email protected]>
Subject: LSJ trip 2/16 - 2/23
Date: Tue, 09 Feb 2010 15:12:45 +0000
Good Morning Sir,
The second phase of the fiber work is scheduled for 2/16 through 2/19. Also, Jermaine has a new server at FTC
and Jeanne has been asking if I could spend some time on my next trip assisting with the server setup. Just
wanted to check with you to see if it was ok to schedule a trip for 2/15-2/23.
Thanks,
WM
William Murphy
Systems Administrator — HBRK Associates
EFTA00764723
ℹ️ Document Details
SHA-256
ccaf529c35de78acbe5e1a37bd2bf8e9ba44bde60f94b5b998d7e2c3cd3f4405
Bates Number
EFTA00764723
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0