EFTA00764723.pdf

DataSet-9 1 page 92 words document
P18
👁 1 💬 0
📄 Extracted Text (92 words)
From: "William Murphy" To: "Jeffrey Epstein" <[email protected]> Subject: LSJ trip 2/16 - 2/23 Date: Tue, 09 Feb 2010 15:12:45 +0000 Good Morning Sir, The second phase of the fiber work is scheduled for 2/16 through 2/19. Also, Jermaine has a new server at FTC and Jeanne has been asking if I could spend some time on my next trip assisting with the server setup. Just wanted to check with you to see if it was ok to schedule a trip for 2/15-2/23. Thanks, WM William Murphy Systems Administrator — HBRK Associates EFTA00764723
ℹ️ Document Details
SHA-256
ccaf529c35de78acbe5e1a37bd2bf8e9ba44bde60f94b5b998d7e2c3cd3f4405
Bates Number
EFTA00764723
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!