EFTA02021974.pdf
👁 1
💬 0
📄 Extracted Text (245 words)
To: jeevacation©gmail.com[jeevacation@gmailcom];
jeevacation mail.com 'eevacation mail.com
Cc:
Sent: fI 39 PM
Subject: Gil wing attach
Jeffrey,
Morrison just notified my of an emergency bulletin issued by Gulfstream, must be complied by July 18th or 10
flight hours.
It is an inspection on Gil and Gill aircraft, area of concern is wing attach fitting for proper gap, if repairs have
been done by a repair facility in regards to wing attach fitting area. We did have work in the wing attach area 6
years ago due to corrosion, and Gulfstream has looked in this area during our 72 month inspection this year. It
do not expect a problem, I plan to have this AD complied with June 17th on retum to Teterboro if you agree with
this? my other option is to have Meridian in Teterboro complete this visual inspection tonight? it takes two hours
only, if there is a problem, we are grounded and will have to ferry to heavy maintenance facility, Midcoast (St
Louis or Gulfstream PEI).
It may make sense to have Gulftream or other heavy maintenance facility comply with inspection, in case there
is an issue found.
Gulfstream found a large gap on an old Gil that had maintenance completed in the wing attach fitting area that
was done incorrectly with Gulfstream repair drawings, this problem in turn effects all operators in the fleet.
do you agree with compliance on June 17th, when we retum to NY?
thank you,
Larry
EFTA_R1_00527998
EFTA02021974
ℹ️ Document Details
SHA-256
cce0bede79cce5336465d03851832b7eca248d0b560ff751d3e7c1fb74c92858
Bates Number
EFTA02021974
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0