PRELIMINARY DRAFT Proposed Freedom Hangar OPTION 1 This is the proposed 110' X 120' Freedom Hangar Location on the existing GA apron as proposed by the owner group in June 2010. Preliminary Site Plan: • Site preparation - Relocate 21-25 existing GA aircraft parking positions/tie downs • Construct Freedom Hangar on south edge of existing GA apron • Construct Concrete Apron Pad in front of hangar • Define aircraft ingress/egress to GA area; Remark GA Apron centerline Issues: • 500' BRL (Structures are to be 500' or greater from R/W centerline) • Line of sight - ATCT to Taxiways F, B and G • Loss of 12 -15 GA parking position in front of GA Maintenance Hangar • Loss of 9-10 GA parking position south edge of apron • Loss of apron area in front of existing GA Maintenance Hangar • Access to Hangar-security issue • Constructing Hangar on FAA funded apron • Navaids impact??? Analysis: • Freedom Hangar location not consistent with the Master Plan/ALP • Hangar sited on existing FAA funded GA common use public aircraft parking apron pavement • ATCT line of sight problems • Hangar too close to runway • Hangar location impacts existing GA Maintenance operations area • Expand west GA apron to accommodate 20-25 GA parking/tie down positions EFTA00586289 OPTION 2 Preliminary Site Plan: • Site preparation - Relocate existing 3 Facilities • Construct new GA tie down area to accommodate 20-25 GA aircraft parking • Construct Freedom Hangar east end area of existing GA Maintenance Hangar • Construct Concrete Apron Pad in front of hangar • Remark GA Apron centerline Issues: • Relocate existing 3 Facilities; need new site location for these three facilities • Loss of 6-7 GA parking position adjacent to GA Maintenance Hangar • Loss of apron area adjacent to existing GA Maintenance Hangar • Constructing Hangar on part of FAA funded apron Analysis: • Freedom Hangar location not consistent with the Master Plan/ALP • Half of Hangar sited on existing FAA funded GA common use public aircraft parking apron pavement • Hangar location impacts existing GA Maintenance operations area • New area need to accommodate relocated facilities • Expand west GA apron to accommodate 4-6 GA parking/tie down positions. OPTION 3 Preliminary Site Plan: • Site preparation - relocate helicopter parking positions • Construct Freedom Hangar on west end of existing helicopter parking apron • Construct Concrete Apron Pad required in front of hangar • Construct Apron expansion required to accommodate the relocated helicopter parking positions • Existing Oil Water Separator to be relocated • Remark GA Apron centerline Issues: • Loss of 4-6 helicopter parking position adjacent to GA Maintenance Hangar • Loss of apron Taxilane area adjacent to existing GA Maintenance Hangar • Constructing Hangar on FAA funded apron • Where to relocate helicopter parking positions EFTA00586290 Analysis: Freedom Hangar location not consistent with the Master Plan/ALP • Hangar sited on existing FAA funded GA common use public aircraft parking apron pavement • Hangar location impacts existing GA Maintenance operations area • Apron expansion required to accommodate the relocation for helicopter parking positions OPTION 4 Preliminary Site Plan: • Site preparation - Green field site • File material required • Construct Freedom Hangar on fill material • Construct Concrete Apron Pad required • Construct Apron expansion required for corporate jet ingress/egress • Existing Oil Water Separator to be relocated • Remark GA Apron centerline Issues: • Loss of GA parking positions adjacent to GA Maintenance Hangar and helicopter parking areas • Loss of apron area adjacent to existing GA Maintenance Hangar • Constructing Hangar on fill material • New GA Taxilane/Apron area required • Existing Oil Water Separator to be relocated Analysis: • Freedom Hangar location not consistent with the Master Plan/ALP • Hangar location impacts existing GA Maintenance operations area • No loss of GA aircraft parking position • Helicopter parking apron to remain EFTA00586291 OPTION 5 Preliminary Site Plan: • Site preparation- Green field site • File material required • Construct Freedom Hangar on fill material • Construct Concrete Apron Pad required in front of hangar • Construct New Taxilane pavement required • Construct New Taxiway Bridge over drainage ditch required • Construct Drainage ditch improvement Issues: • Constructing Hangar on fill material • New GA Taxilane/Apron pavement required • New Taxiway Bridge over drainage ditch required Analysis: • Freedom Hangar in this location is not consistent with the Master Plan/ALP • Hangar location does not impact existing GA Maintenance operations area • Hangar location does not impact the existing helicopter parking apron • No loss of existing GA aircraft parking position EFTA00586292
ℹ️ Document Details
SHA-256
cd1c97fd3f890eeda4bb0f5ea460707c989d958dbfbdbb533b7fe1860d57135e
Bates Number
EFTA00586289
Dataset
DataSet-9
Document Type
document
Pages
4

Comments 0

Loading comments…
Link copied!