EFTA01827694
EFTA01827696 DataSet-10
EFTA01827698

EFTA01827696.pdf

DataSet-10 2 pages 261 words document
P17 V16 P22 P23
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (261 words)
To: Andrew Levy From: Jeffrey Epste Sent: Tue 4/21/2009 10:59:00 PM Subject: Re: LSJ Hammam helpfull„i think we need to move the jacuzii , it looks good in plan but elevation leads me to believe it sits in the middle of a space„ inelegant On Tue, Apr 21, 2009 at 6:30 PM, Andrew Levy a wrote: Dear Jeffrey, Hasan has asked me to send the following: Attached you will find: -A drafted version of a site plan focusing on entrance ("entrance landscape option") -Building Plan -Folder of jpegs: Sketches: 1- Diagrammatic sketch of approach road- This sketch shows the possible new connection and circulation path from below the gym to the Hammam entry tower. Manipulations and patterning of the earth via contours and terraces as well as vegetation would follow. (see drafted "entrance Landscape option" for more detail) 2-Diagramatic sketch showing twisting of the tower- Concept being that all interior spaces follow strict geometry while spaces and pieces that break away from the building (starting with the tower) begin their own language and relationship that best benefits the landscape and site circulation. Images: 1 and 2- Interior of pool area. We have begun modeling the interior spaces of the Hammam starting with the pool. These images are not to be taken literally and are only a starting point for details of patterns, plaster work etc -to be discussed. Columns from Cordoba are being used as a starting point for proportions of the space around the pool. Hasan is available between 9am and 11am tomorrow. EFTA_R1_00202938 EFTA01827696 Thank you, Andrew EFTA_R1_00202939 EFTA01827697
ℹ️ Document Details
SHA-256
cd248527ad8676bbd7bc8f841cc8506a666f5a5da2a88feac16d094bd1f64d3f
Bates Number
EFTA01827696
Dataset
DataSet-10
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!