EFTA01110931
EFTA01110932 DataSet-9
EFTA01110933

EFTA01110932.pdf

DataSet-9 1 page 361 words document
P17 V16 V11 P19 P23
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (361 words)
2119/12 Atlanta RefrIgenition Service Quote ARS Export Supply V .R \ \.) "TY , Formerly Atlanta Refrigeration Service VI 7350 Estate BoYeol, Suite I21C, St. Themes USVI 00802 Tel: 340.775.9222 Fax:340.775.9122 QUOTE Jab Location Quote Information Little Saint James We: Jul 30, 2012 Little Saint James ARS Quote ICS: 9828862 St. Submitted By: Kent Magee Original AM Inv": Tel:Mr Fax:. Submitted To: Original Call Date: 6/15/2012 We Submit Specific and Estimations for the Listed Below: Equipment Chiller Modeler e 'Manufacturer: Cramer ride: Description of Work Required: The following is a quote for the chiller In the library. We are proposing to return to site and remove the old chiller system. We will install the new airhandler, chiller, reheat system, controls and dampen. The Controls installed will what was provide by EMS. The chiller will have a E-Coating on the condenser coil to resist corrosion. We will also provide a spare chiller to keep on site in case a replacement is needed. The new system will control the humidity of the library and control temperature property. Shipping is included to St thomas. Barge must be provided for equipment to get out to LSJ. The use of the on site lull must be provided also for unloading container and getting equipment Into place and ramming the old equipment. Thank . you for choosing ARS Export Supplyl Pal tones% r.:...i ptitn Oiv Total Canter Complete Chiller System 1.0 $48,501.20 Spare Carrier Chiller 1.0 $26,550.00 D0C Controller. Controls and Installation 1.0 $29,348.00 Duct work, Dampers, Materials 1.0 *845.00 All Piping, Valves, Hardware 1.0 $3,680.00 :that Installation Labor 1.0 $14,500.00 • Important Notes: Total Materials: $110,924.20 i Lead time is 10-12 weeks depending on Manufacture lead time on equipment. Once Total I epprowd 50% is due before any equipment will be ordered. Once equipment antes, Total Misc./Welding: 25% will be due before installation work can begin. Once project Is complete and I running anal 25% will be due. Total Labor: $14,500.00 Initial Call: Shipping/Freight: $4,500.00 Warranty Information: Subtotal: $129,924.20 i Manufacturer parts warranty and 30 day labor warranty on work performed Tax: Total: $129,924.20 FAX SACK SIGNED TO mitricriaadon COW Authorization: ARS Acceptance: ett.taillog.00mIdoksioteViewhO94328862 1/2 EFTA01110932
ℹ️ Document Details
SHA-256
cdcb5db261cff7849e89a0970aabe04f5f61ea6f8648e3f41d2d7c89c99344ec
Bates Number
EFTA01110932
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!