EFTA00846567.pdf

DataSet-9 2 pages 530 words document
👁 1 💬 0
📄 Extracted Text (530 words)
From: Daphne Wallace To: Jeffrey Epstein <[email protected]> Cc: ann rodriquez Subject: Photos - September 10, 2015 Date: Thu, 10 Sep 2015 21:24:41 +0000 Attachments: Banana field cut_and_cleared_(1).JPG; Banana field cut_and_cleared_(2).JPG; Banana_field—cut_and_cleared_(3).JPG; Banana_field—cut_and_cleared_(4).JPG; Banana_field—cut_and_cleared_(5).JPG; Banana_field—cut_and_cleared_(6).JPG; Banana_field—cut_and_cleared_(7).JPG; Banana_field—cut_and_cleared_(8).JPG; Banana_field—cut_and_cleared_(9).JPG; Banana_field—cut_and cleared_00).JPG; Banana_field—cut_and_cleared_01).JPG; Banana_fiela cut_ana_cleared_02).JPG; Banana_field—cut_and_cleared_03).JPG; Banana_fielCcut_and_cleared_04).JPG; Banana_fielf_cut_and_cleared_05).JPG; Banana_field_cut_and cleared_06).JPG; Library_roof_assessment_(1).JPG; Library_roof assessment_(2)7JPG; Library_roof assessment_(3).JPG; Library_roorassessment_(4).JPG; Library_roorassessment_(5).JPG; Library_roor_assessment_(6).JPG; Libraty_roor_assessment_(7).JPG; MBR flooring_progress_(1).JPG; MBR flooring_progress_(2).JPG; MBR:flooring_progress_(3).JPG; MBR—flooring_progress_(4).JPG; MBRilooring_progress_(5).JPG; MBR—flooring_progress_(6).JPG; MBR flooring_progress_(7).JPG; PebblO_Beach_(1).JPG; Pebble_Beach_r2).JPG; Pebble_Beach_(3).JPG; Pebble_Beach_(4).JPG; Pebble_Beach_(5).JPG; Pebble_Beach_(6).JPG; Pebble_Beach_(7).JPG; Pebble Beach_(8).JPG; Pebble Beach_(9).JPG; Pebble_Beach_(10).JPG; PebblO_Beach_(11).JPG; Peble_Beach_(12).JPG; Pebble_Beach_(13).JPG; Pebble_Beach_(14).JPG; Pebble_Beach_(15).JPG; Pebble_Beach_(16).JPG; Pebble Beach_(17).JPG; Pebble_Beach_(18).JPG; Pebble_Beach_(19).JPG; Seaweed.JPG; Stone wall_along_road_to_Info_Center_(1).JPG; Stone_wall_along_road_toinfo_Center_(2).JITG; Stone_wall_along_roadjoinfo_Center_(3).JPG; Stone_wall_along_road_to_Info_Center_(4).JPG; Stone wall along_road to Info Center_(5).JPG; Waterfall cistem_(1).JPG; Wateriall_cIstem_(2).JP—G;Vateriall_cistem_(3).JPG; Waterfall_cistem_(4).JPG; Waterfall cistem_(5).JPG; Waterfall cistem_(6).JPG; Info Center entrance_drive.JPG; Big_Salt:Pond_(1).JPG; Big_Salt_Pond_(2).JPG; Big_Salr_Pond13).JPG; Big_Salt_Pond_(4).JPG; Grotto repainting_(1).JPG; Grotto_repainting_(2).JPG; Grotto_repainting_(3).JPG; Grolto repainting_(4).JPG; Grotto repainting_(5).JPG; Grotto repainting_(6).JPG; Hillside above Flagpole_Pool_a ).JPG; Hillside_above_Flagpole_Pool_(2).JPG; Hillside_above_Flagpole_Pool_(3).JPG; Hillside_above_Flagpole_Pool_(4).JPG; Hillside_above_Flagpole_Pool_(5).JPG Greetings Sir, September 10 photos for your review and comments: Banana field - the bananas on the hillside below the Master have been cut and the area clean up is in progress Library Roof assessment - major damage has been discovered to the wood underneath the galvanize on the Library side MBR flooring progress - today was sanding #2 - 9/11 is sanding #3 and epoxy - 9/14 is polyurethane #1 - 9/15 is light sand of polyurethane #1 and polyurethane #2 - 9/16 is light sand of polyurethane #2 and final polyurethane EFTA00846567 - 9/17 is cleanup - 9/18 is curing - 9/19 is ready to move in Pebble Beach - Jules is almost complete with the cleanup - he wants to add more rocks to shore up the waterside barrier against the waves - Danny marked two lines for your review of how far you would like the slab to extend - the first marking is where the original slab ended and the second marking is another 15 feet. Danny would like to know if you wish to put back the same rough texture as what is presently there - if so, the concrete will need to be mixed in the concrete mixers - the stones are too large to move through the pump truck hose - Danny and Tom came up with the mix that is presently there - Danny and Chris are also concerned about the erosion beneath the remaining slab and are recommending the slab be removed and re-poured - Jules would prefer to jack hammer this final slab away rather than use the trackhoe because he is concerned about the steps cracking if the slab is not removed carefully Seaweed - has returned - Anna will try to schedule getting it off the shoreline again before your return Stonewall along road to Info Center - in progress Waterfall cistern - in progress - 9/11 will pour concrete - 9/14 will be block work Info Center entrance drive - the gravel was scraped away, the landscaping mesh was added, and new gravel laid down Big Salt Pond - re-hydration completed Grotto - blinds and floors repainted, the blind louvers that are broken will be repaired and touched up, the weeds will be removed, weed kill applied and fresh gravel laid down Hillside above Flagpole Pool - cleanup progress Respectfully submitted, Daphne EFTA00846568
ℹ️ Document Details
SHA-256
cdcb61b200198fe4de88802ee2ff0bb13d6e8371920f0565376acbf4debf79c1
Bates Number
EFTA00846567
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!