EFTA00846567.pdf
👁 1
💬 0
📄 Extracted Text (530 words)
From: Daphne Wallace
To: Jeffrey Epstein <[email protected]>
Cc: ann rodriquez
Subject: Photos - September 10, 2015
Date: Thu, 10 Sep 2015 21:24:41 +0000
Attachments: Banana field cut_and_cleared_(1).JPG; Banana field cut_and_cleared_(2).JPG;
Banana_field—cut_and_cleared_(3).JPG; Banana_field—cut_and_cleared_(4).JPG;
Banana_field—cut_and_cleared_(5).JPG; Banana_field—cut_and_cleared_(6).JPG;
Banana_field—cut_and_cleared_(7).JPG; Banana_field—cut_and_cleared_(8).JPG;
Banana_field—cut_and_cleared_(9).JPG; Banana_field—cut_and cleared_00).JPG;
Banana_field—cut_and_cleared_01).JPG; Banana_fiela cut_ana_cleared_02).JPG;
Banana_field—cut_and_cleared_03).JPG; Banana_fielCcut_and_cleared_04).JPG;
Banana_fielf_cut_and_cleared_05).JPG; Banana_field_cut_and cleared_06).JPG;
Library_roof_assessment_(1).JPG; Library_roof assessment_(2)7JPG;
Library_roof assessment_(3).JPG; Library_roorassessment_(4).JPG;
Library_roorassessment_(5).JPG; Library_roor_assessment_(6).JPG;
Libraty_roor_assessment_(7).JPG; MBR flooring_progress_(1).JPG;
MBR flooring_progress_(2).JPG; MBR:flooring_progress_(3).JPG;
MBR—flooring_progress_(4).JPG; MBRilooring_progress_(5).JPG;
MBR—flooring_progress_(6).JPG; MBR flooring_progress_(7).JPG;
PebblO_Beach_(1).JPG; Pebble_Beach_r2).JPG; Pebble_Beach_(3).JPG;
Pebble_Beach_(4).JPG; Pebble_Beach_(5).JPG; Pebble_Beach_(6).JPG;
Pebble_Beach_(7).JPG; Pebble Beach_(8).JPG; Pebble Beach_(9).JPG;
Pebble_Beach_(10).JPG; PebblO_Beach_(11).JPG; Peble_Beach_(12).JPG;
Pebble_Beach_(13).JPG; Pebble_Beach_(14).JPG; Pebble_Beach_(15).JPG;
Pebble_Beach_(16).JPG; Pebble Beach_(17).JPG; Pebble_Beach_(18).JPG;
Pebble_Beach_(19).JPG; Seaweed.JPG; Stone wall_along_road_to_Info_Center_(1).JPG;
Stone_wall_along_road_toinfo_Center_(2).JITG;
Stone_wall_along_roadjoinfo_Center_(3).JPG;
Stone_wall_along_road_to_Info_Center_(4).JPG;
Stone wall along_road to Info Center_(5).JPG; Waterfall cistem_(1).JPG;
Wateriall_cIstem_(2).JP—G;Vateriall_cistem_(3).JPG; Waterfall_cistem_(4).JPG;
Waterfall cistem_(5).JPG; Waterfall cistem_(6).JPG; Info Center entrance_drive.JPG;
Big_Salt:Pond_(1).JPG; Big_Salt_Pond_(2).JPG; Big_Salr_Pond13).JPG;
Big_Salt_Pond_(4).JPG; Grotto repainting_(1).JPG; Grotto_repainting_(2).JPG;
Grotto_repainting_(3).JPG; Grolto repainting_(4).JPG; Grotto repainting_(5).JPG;
Grotto repainting_(6).JPG; Hillside above Flagpole_Pool_a ).JPG;
Hillside_above_Flagpole_Pool_(2).JPG; Hillside_above_Flagpole_Pool_(3).JPG;
Hillside_above_Flagpole_Pool_(4).JPG; Hillside_above_Flagpole_Pool_(5).JPG
Greetings Sir,
September 10 photos for your review and comments:
Banana field - the bananas on the hillside below the Master have been cut and the area clean up is in progress
Library Roof assessment - major damage has been discovered to the wood underneath the galvanize on the
Library side
MBR flooring progress - today was sanding #2 - 9/11 is sanding #3 and epoxy - 9/14 is polyurethane #1 - 9/15 is
light sand of polyurethane #1 and polyurethane #2 - 9/16 is light sand of polyurethane #2 and final polyurethane
EFTA00846567
- 9/17 is cleanup - 9/18 is curing - 9/19 is ready to move in
Pebble Beach - Jules is almost complete with the cleanup - he wants to add more rocks to shore up the waterside
barrier against the waves - Danny marked two lines for your review of how far you would like the slab to extend
- the first marking is where the original slab ended and the second marking is another 15 feet. Danny would like
to know if you wish to put back the same rough texture as what is presently there - if so, the concrete will need to
be mixed in the concrete mixers - the stones are too large to move through the pump truck hose - Danny and Tom
came up with the mix that is presently there - Danny and Chris are also concerned about the erosion beneath the
remaining slab and are recommending the slab be removed and re-poured - Jules would prefer to jack hammer
this final slab away rather than use the trackhoe because he is concerned about the steps cracking if the slab is
not removed carefully
Seaweed - has returned - Anna will try to schedule getting it off the shoreline again before your return
Stonewall along road to Info Center - in progress
Waterfall cistern - in progress - 9/11 will pour concrete - 9/14 will be block work
Info Center entrance drive - the gravel was scraped away, the landscaping mesh was added, and new gravel laid
down
Big Salt Pond - re-hydration completed
Grotto - blinds and floors repainted, the blind louvers that are broken will be repaired and touched up, the weeds
will be removed, weed kill applied and fresh gravel laid down
Hillside above Flagpole Pool - cleanup progress
Respectfully submitted, Daphne
EFTA00846568
ℹ️ Document Details
SHA-256
cdcb61b200198fe4de88802ee2ff0bb13d6e8371920f0565376acbf4debf79c1
Bates Number
EFTA00846567
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0