📄 Extracted Text (2,863 words)
From: Cecik de longh
To: Jeffrey Epstein [email protected]>
Subject: Fw: fiber project
Date: Tue, 08 Dec 2015 17:59:05 ♦0000
Attachments: LS.I_Preliminery_Report.pdf
Wine-Images: image002.png; image003.jpg
With warm regards.
Cecile
On Monday. December 7.2015 8:38 PM. Hector Cannon -- wrote:
Hi Everyone.
Attached is a preliminary detail report, beside the 2 drops (Sun and Today due to the rain) how is the service after the changes?
Pending Items NON priority:
• Move both rockus radios from the netgear to the Cisco 3560 (by installing PoE power supply)
• Interconnect Choice 3650 and LSj 3560 at the gym (this is to be able to have connectivity to the AP that covers 5 Palms)
Pending Items Priority
• ViNgN connectivity (awaiting cable for cross connect)
Jermaine, Let me know when we can schedule the non priority items, no rush
BOM
QTY part desc Installed Location arrived Responsibility
1 CISCO2921/K9 Cisco Router Data Room Installed Choice
1 GLC-BX-D ViNGN Simplex Single Mode Module In the cisco router Data Room Installed LSJ
1 ViNGN Simplex Cable 35' ST to LC Between Cisco Router and Patch Panel (coming from STT) Data Room Installed LSJ
1 HWIC-1GE-SFP WIC Card for SFP Cisco Router Data Room Installed LSJ
1 MM Duplex fiber cable 6' SC to LC Between Cisco Router and Patch Panel Data Room Installed LSJ
1 GLCSX-MM MM Fiber Module Cisco Router Data Room Installed Choice
1 GLCSX-MM MM Fiber Module Cisco 3560 Building - Gym Installed Choice
1 MM Duplex fiber cable 6' SC to LC Between Cisco 3560 and patch Panel Building - Gym Installed LSJ
4 rackmcunt screws for Cisco 3560 Building - Gym Installed LSJ
1 3560G-24 Cisco 3560 Building - Gym Installed Choice
1 3560G-24 Cisco 3560 Outside Cabinet Installed Choice
4 rackmount screws for Cisco 3560 Could use existing from netgear Outside Cabinet Installed LS)
1 Simplex fiber cable for cross connect at Vesuup Pole Due in Thursday Choice
Other Pending Items/Work
Cross Connect STT Beach After Cable arrival ViNGN
Router Config Info X LSJ
Dragonwave Warrantee Info ??
Dragonwave Survey Includes Signal, Firnware, Hardware, Monitoring, Grounding Choice
From: Hector Cntron
Sent: Friday. December 04. 2015 18:00
To: 'Jermaine Ruan': Omar Welch:
Cc:
Subject RE: fiber project
Hi Everyone:
I'll send a full detail report in a few days. So far here is a brief description.
• The Ruckus AP that is setup to cover the southside of the island that is installed on the tower where the Dragonwave is not working.
• There was a network loop between the dragonwave and the netgear causing packet drops and unstable network. " Fixed
EFTA00634248
• Install two switches (Outside shelter. Gym) to be able to monitor both the Dragonwave and Ruckus bridge
• Took out the apple router that was working as DHCP and NAT.
• Brought the Cisco 2921 router online. Now this is the main DHCP and NAT router
• Installed the fiber cable and module for the VINGN connection. This was installed in Port 5 on the fiver cable that goes to Vessum
• I re-enable the dragonwave management ports so I can verify the configuration
• I changed the password of both radios (the default password was configured Jermaine I'll get you the new password so you can file them)
• I added some of basic monitoring. For the dragonwave (I would be able to add full monitoring until I reconfigure the units)
• I added monitoring to the cisco router and the switch in the shelter
We did some testing before we left with youtube and ApeleTV and all were working without buffering.
The Dragonwave will have to be taken offline once the VINGN circuit goes online. The software on the unit is old and it has some bugs that wit cause issues once the units are up for about 1-2 months.
The connection will drop until the unit is rebooted.
Another bug is this error:
Notice:Dec 01 21:55:01 C1N14DGM0075 atarrn[544789-1]: Critical: Crypto configuration mismatch peer Alarm cleared
Notice:Dec 01 21:55:01 C1N14DGM0075 atarrn[544789-1]: Critical: Crypto configuration mismatch peer Alarm raised
till mune uyptu Key mnrnatar w d [super Key.
1957 Crypto configuration mismatch alarm raised on new link or radio 1.01.00
swap even if encryption is not enabled on both radios.
170 rnmen resniknaratinn mlemetrk slava-or not clasp-awl Awing? ratan nt no I t
Will send the rest of the info in the detail report
From: Jermaine Ruan mailto:
Sent: Friday. December 04 2015 13:30
To: Omar Welch. Hector Cintron
Cc: . mailto
Subject Fwd: fter project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Good day all.
Hector was able to complete the followng:
- clear up the network loop that was causing bottle in data follow
- install the switches to monitor the dragonwaves
- physical setup for the new router for vingn
To be done:
-vingn to do the physical crossover at stt
-create the tier login id's for dragonwaves
-setup for remote monitcnng for island
Regards
Jruan
Sent from my iPhone
Begin (awarded message:
From: Hector Cinbon
Date: December 3.2015 at 7:19:30 PM AST
To: Jennalne Ruan
Cc: Omar Welch Cecile de Jongh Alyster Edwards
Subject: RE: fiber project
When I left the office I asked Allan and I didn't see the cables, he will be looking into it.
Also just an FYI I logged in the dragomvave to gather some information and I noticed that both Ethernet ports (data and management) on the LSJ side are plugged in to the switch creating a network loop
. What I did was shutdown the management port on outside. This will help some but will be fixed tomorrow. I would not be surprised that accessing the internist is smoother now due to lowering of the
packet drops and max times
Pings before shuting down the port
Success rate is 98 percent (9876110000). round-trip miniavg/max = 1/41128 ms
Alter
Success rate is 99 percent (9999(10000). round-trip miniavg/max = 1/4/44 ms
From: Jermaine Ruan fmaltoa
Sent Thursday. December 03. 2015 17:21
To: Hector Citron
Cc: Omar Welch: Cecile de Joogh: mater Edwards
Subject: Re: fiber project
Email recaved from outside of the ATN domain. Use caution before using links/attachments.
Hi Hector
Terrence stated that the login for dragonwaves are set to factory default .
Regards
Jruan
EFTA00634249
Sent from my Phone
On Dec 3. 2015. at 3:52 PM. Hector Cintron wrote:
Hi Jermaine.
I just spoke with omar and the cable hasn't anived. what we can do is this. I'll split the work on two trips. I'll go tomorrow weather permitting (it's supposed to be sunny) regardless if the ViNGN circuit
is ready and do the installation. Yll bring up the router and install the 2 switches to be able to monitor the dragonwave and Eli leave the deep inspection and testing for the second trip once ViNGN is
up.
There will be a downtime of between 1 to 2 hours as I make the changes. If this is acceptable I'm a GO for tomorrow. What I'll need after the switch iistallation is the logins for the dragonwave so once
this is done I can start with the verification of the link (no changes will be made).
On the second trip Ill go to the island with Alyster takedown the dragonwave to do the following:
Test ViNGN circuit
Test ViNGN faitover
Verify all grounding
Verify all connectors weatherproofing
Verify Lightning arrestors
Check all cables and replace cables if needed
Upgrade firmware on DW if needed
Make configuration changes to the DW if needed
Let me know if this is acceptable.
From: Jermaine
Sent: Wednesday. December 02.2015 16:31
To: Omar Welch
Cc: 'Cecile de Jongh': Alyster Edwards: Hector Guam
Subject: RE: fiber project
Email received from outside of the ATN domain. Use caubon before using links/attachments.
Good Evening Omar .
I am following up to verify that VINGN is on target for tomorrow and Choice for Friday.
Regards
Jruan
From: Hector Cintron mailto
Sent: Monday. November 30. 2015 5:11 PM
To: Jermaine Ruan
Cc: Cecile de Jongh: Omar Wetch:Alyster Edwards
Subject: RE: fiber project
Perfect. you got everything. The PDF only had the fiber from Power and Tel and not the items from curvature. so I just wanted to make sure.
Thanks
From: Jermaine Ruan II
Sent: Monday. November 30. 2015 17:03
To: Hector Cintron
Cc: Cecile de Jongh: Omar Welch:Alyster Edwards
Subject: Re: fiber project
Email received from outside of the ATN domain. Use caubon before using links/attachments.
Good day Hector
I have 2 simplex aid 3 duplex cables from power aid tel. I have 1 hwic module and 1 glc =rector.
EFTA00634250
j;)macel.!PG
Sent from my Phone
On Nov 30, 2015. at 4:31 PM. Hector antron wrote:
Those are the fiber cable from power and lel, was an order placed for the culvature items?
Bellow I highlighted the items:
Green are the items from Power and Tel that arrived
Yellow are the items from Culvalure that I do not see listed on the PDF
From: Jennaine
Sent Monday. November 30.2015 16:24
To: Hector Carton:tat:Ile de Jona,'
Cc:Omar Welch:Alyster Edwards
Subject RE: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Please see attached
From: Hecta Clntrcn (maja
Sent Monday. November 30.2015 12:54 PM
To: Cede de Jaigh
Cc:Omar Welch: Jarman.; Atyster Edwards
Subject RE: fiber project
Jermaine.
Can you send me a list of all the items that you received? I want to make sure we have everything. I just created a BOM to keep track of what is needed and I'm sure adding to the work/pending
list
BOM
OTY part desc Installed Location arrived Responsibility
I CISCO2921!K9 Cisco Router Data Room Installed Choice
1 GLC-BX-D MGM Simplex Single Mode Module In the Osco router Data Room LSJ
1 Willi Between Cisco Router and Patch Panel (coming from STT) Data Room LSJ
1 HWIC-1GE-SFP WIC Card for SFP Cisco Router Data Room LSJ
1 . . `'•"i'
- -". Between Cisco Router and Patch Panel Data Room LSJ
1 GLC-SX-MM MM Fiber Module Cisco Router Data Room x Choice
1 GLC-SX-MM MM Fiber Module Cisco 3560 Building -Gym x Choice
1 iiiiii:L.A. : Between Cisco 3560 and patch Panel Building - Gym LSJ
4 rackmount screws for Cisco 3560 Building - Gym LSJ
1 3560G-24 Cisco 3560 Building - Gym x Choice
1 3560G-24 Cisco 3560 Outside Cabinet x Choice
4 rackmount screws for Cisco 3560 Could use existing from netgear Outside Cabinet LSJ
Other Pending Items/Work
Cross Connect STT Beach ViNGN
Router Config Info X LSJ
Dragonwave Warrantee Info ??
EFTA00634251
Dragonwave Survey Includes Signal, Firmware, Hardware, Monitoring, Grounding Choice
From: Cecile de Jongh magic
Sent Wednesday. November 25. 2015 13:44
To: MOWN' Contron
Cc:Omar Welch: Jimmie*
Subject Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Thank you Hector.
On Nov 25. 2015. at 11:37AM, Hector Cintron •:: > wrote:
I can only comment about #3
3 - it should. this way I can do a fill integration of the ViNGN. Dragonwave backup, test failover.
The plan that I would like to do:
• install ViNGN via the new router. Test it and switch the island over this new connection (primary)
• Once this is done I can takedown the Dragonwave connection to add some switches to be able to monitor the link and take over maintenance. Once this is complete
• Reconnect the Dragonwave as secondary link
• Test failover to Secondary (DW).
The above plan has a 1-2 min downtime.
If VINGN is not ready I can still do the install but I need to install the switches needed to monitor the dragonwave there will be a downtime of a few hours as I do the swap but no testing will be done.
Hector.
From: Cecile de Jongh meal°
Sent Wednesday. November 25. 2015 10:40
To: Hector Contron
Cc: Omar Welch: Jermaine
Subject: Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Ok.
1. Does this still need to be scheduled with them?
2. If so. do we do that or do you?
3. Does this need to be done before Hector goes to the island or can it be done anytime afterwards?
On Nov 25. 2015. at 10:19 AM. Hector Cintron c wrote:
The crossover does require a visit to the Pole (the one in St Thomas at the beach) where VINGN connects to the fiber the goes to the Island.
From: Cecile de Jongh
Sent Wednesday. November 25. 2015 10:17
To: Omar Welch
Cc: Jermaine: Hector Cintron
Subject Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Does this "crossover" require VINGN to visit the site or is it something that is done remotely from their office?
On Nov 25. 2015. at 10:01 AM. Omar Welch < > wrote:
Hi Cecile
The connection does play a part in the delay until Monday but not the confirmation for today as no confirmation was made for today. We are assisting VINGN to be ready for Monday.
"True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation'
On Nov 25. 2015. at I3:13 AM, Cecile de Jongh < > wrote:
Email received from outside of the ATN domain. Use caution before using links/attachments.
Good morning Omar and Hector,
Has the date switched to Monday due to the fact that VINGN has not done the crossover? If so. why did Hector confirm today? Will VINGN complete the crossover by Monday?
On Nov 25, 2015, at 9:02 AM. Jermaine ca. wrote:
Good day Omar
I am not understanding this. As per my conversation. I stated Monday is too long. I started receiving emails from Hector concerning the installation shortly after. One of my last email was confirming
tomorrow.
Jruan
EFTA00634252
From: Omar Welch (0180.0.
Sent: Wednesday. November 25.2015 8:55 AM
To: Jermaine
Cc: Hector Cintron: Cece de Jongh
Subject: Re: fiber project
Jermaine per my message Hector will not be able to complete installation until Monday please make arrangements for this. Also we are still awaiting confirmation from VINGN on the cross connect.
'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."
On Nov 24, 2015, at 3:32 PM, Jermaine > wrote:
Email received from outside of the ATN domain. Use caution before using links/attachments.
Good Day Hector.
Please be advised, all components are here in the office ready for installation tomorrow. Does VINGN have the crossover in place?
Regards
Jruan
From: Hector Canton mailto:
Sent Tuesday. November 24.201512:28 PM
To: Jermane Ruan
Cc: Omar Welch
Subject RE: fiber project
Hi Jermaine.
Can you send me a list of the items you have for the install? I want to make sure we have everything before I head over there.
Thanks.
From: Hector Canton
Sent Wednesday. November 11.201510:47
To: 'Jermaine Ruan'
Cc: Omar Welch
Subject RE: fiber project
I cannot give you a date sense its all based on the following:
ViNGN installs the cross conned
7 whether we order the parts or LSJ order the parts. This was something that Omar was going to speak to (sorry I do not know the name) LSJ Finance.
o For ViNGN connection (Router Module, Fiber Module. Fiber cable)
o Choice connection (switches, fiber cables)
Also just an FYI 111 be going on vacation staring this Friday and I'll be back on Monday 23rd so assuming all the above is installed, purchased and delivered by the time I get back it would be
sometime the week of the 20
Hector.
From: Jerrnaine Ruan (maa
Sent Wednesday. November 11.2015 0932
To: Hector Cintron
Cc: Ornar Welch
Subject Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Good morning gentlemen
The principal is requesting a new date for the fiber. Do you have a suggested estimated time of completion?
Regards
Jruan
Good evening all
When is the new date for the connection so I can update my superiors
Regards
Jruan
Sent from my Phone
On Nov 10. 2015. at 11:25 PM. Hector Cintron •r: > wrote:
Hi Guys.
I haven't received notifications that the items that we need to finish came in so that would be no.
From: Omar Welch
Sent: Tuesday. November 10.2015 19:06
To: Jermaine Ruan: Heeler Cintron
Subject: Re: fiber protect
Hector?
'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."
EFTA00634253
On Nov 10. 2015, at 6:44 PM, Jermaine Ruan wrote:
Email received from outside of the ATN domain. Use caution before using linksIattachments.
Good night Omer
Yep. I am trying to line up the runs in the morning
Regards
Jruan
Sent from my Phone
On Nov 10. 2015. at 6:19 PM. Omar Welch la wrote:
To come to the island?
'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation'
On Nov 10. 2015. at 6:10 PM. Jermaine •r: > wrote:
Email received from outside of the ATN domain. Use caution before using linksiattachments.
Good day omar
Is hector still on for tomorrow?
Regards
Jruan
EFTA00634254
ℹ️ Document Details
SHA-256
cf1337e53bf6f9a93a25b87f7ebf61443e48f11698b151c52574c6423d9c3957
Bates Number
EFTA00634248
Dataset
DataSet-9
Document Type
document
Pages
7
Comments 0