EFTA02711756.pdf

DataSet-11 2 pages 392 words document
👁 1 💬 0
📄 Extracted Text (392 words)
From: Richard Kahn Sent: Thursday, June 18, 2015 9:25 PM To: jeffrey E. Subject: Fwd: Garage Roof Building Construction - June 18, 2015 Attachments: Allied Steel proposal.pdf; Untitled attachment 00567.htm; Buck Steel proposal.pdf; Untitled attachment 00570.htm; MBMI proposal.pdf; Untitled attachment 00573.htm attached are 3 bids MBMI bid has a color =watch for your review i have not negotiated any of =ids yet and cost of building erection still needs to be determined =buck steel estimated 36,000) Richard =ahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 to fa Begin forwarded message: Date: =/b>June 18, 2015 at 5:03:00 PM =DT Subject: =/b>Garage Roof =uilding Construction - June 18, 2015 From: =/b>Daphne Wallace To: Rich Kahn , ann rodriquez Pertaining=to your request to get a Jaredian schedule of purchase on =onstruction. The company that will be fabricating the steel =uilding must be chosen in order to proceed. Once the fabricator =s selected, Jaredian will then complete the foundation drawings =include other pertinent information needed for actual construction), =eview with the fabricator, and the building can then be =rdered. Below is a breakdown into 3 =ategories the components needed for the schedule: the Steel Building cost proposal, =osts of shipping and delivery to LSJ, and the selection of the General =ontractor and/or crew responsible for constructing and/or obtaining quotes for =nstallation: EFTA_R1_02126857 EFTA02711756 Steel Building Cost proposal should include: Design - Stamped construction plans which follow the International =uilding Code that can be filed with DPNR to obtain a Building Permit - =hese plans will show the J-bolt layout and the building's structural =eactions Structural steel (Super structure) and Purlins - 24 gauge =teel recommended Metal Siding (Sheathing) and Roofing - =4 gauge steel recommended Overhead Rolling Doors - rated =o 140 mph winds Metal pedestrian doors - rated to 140 mph winds Full =ange of color options - Kynar 500 Finish recommended Owner (LSJ) will coordinate/obtain =uotes: Shipping (Tropical Shipping) Erection (TBD) General Contractor (TBD): Earthwork Concrete foundations Electrical Plumbing and/or Mechanical Systems Three companies were vetted and =uotes were obtained. Listed below are their proposals, which include =he parameters outlined above, delivered to the port of Palm =each: Allied Steel : $112,747.00 Buck Steel: $126,640.00 MBMI: $ 84,992.00 (note: steel is 26 gauge Super Spanex =anel) Copies =f all three proposals are attached for your review. 2 EFTA_R1_02126858 EFTA02711757
ℹ️ Document Details
SHA-256
cf353ad359dbf4fc2b885b6c4cc6975b59e4b2f8493aa69caa139d0f71773d20
Bates Number
EFTA02711756
Dataset
DataSet-11
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!