EFTA02425591.pdf

DataSet-11 3 pages 425 words document
P23
👁 1 💬 0
📄 Extracted Text (425 words)
To: Jeevacation E stein 'eevacation mail.com] Cc: ; Gary Kerney From: Shelley Sent: Sat 5/8/2010 1:24:06 PM Subject: Fwd: minutes of 5/6'10 with decision on time frames for next round of drawings, plus.. Begin forwarded message: From: "Gary Kerney" Date: May 7, 2010 3:17:27 PM EDT To: "Jeffrey Epstein" <leevacation(Thclmail.com> Cc: Subject: minutes o Agenda visit 5/6/10 WITH MINUTES 5/7/10 Master suite 1. Shower/steam design put chair in tiki hut from master bed into the bathroom RECIEVED FINAL PLANS 2. white tassos in steam/shower a.white glass in dressing room cost $ 55,000 5 months lead time plus install and shop drawing time b.Tassos in dressing room cost $ 30,000 2 months delivered and installed SEE 1 3.tub and room design DESIGN PENDING 4.arch openings between bed and bath KEEP 5.wood flooring design, coral gone on dressing room floor SEE 1 6.treatment of bedroom walls PLASTER THEN ROBERT WILL DECIDE ON FINAL 7.door review? ROBERT TO FORWARD PLAN MAY CLOSE OFF DOORS ON WEST EFTA_R1_01493978 EFTA02425591 8.tv location decision made to not put desk in tiki hut back into bedroom SEE 8 Library courtyard design GAVE ROBERT AS BUILTS AND REVIEWED ALTERNATIVE MATERIALS TO MAKE DESIGNS Ready by May 11- 12th Kitchen 1.interior design SENT CAD DRAWINGS TO ABRAM,AND WENT OVER FUNCTION WITH BRICE, ROBERT TO PRODUCE DESIGN DRAWINGS Ready by May 17 - 18th for view, review in NY if possible 2.COLUMN DECISION Ready by May 11-12th ROBERT TO DO TWO OR THREE ALTERNATIVES IN PHOTO SHOP GARY TO PRICE 1 KEEP ARCHES WITH PLASTER COLUMNS 2 KEEP ARCHES WITH PLASTER COLUMNS AND STONE BASE 3 REMOVE ARCHES AND NEW STONE COLUMNS -Cottages 1. Door approval DONE 2. Shower decision a.fully enclosed stone and tiled, seems to tight to me b.collum plus roof and screen seems right ROBERT TO SKETCH UP PLAN .GARY TO PRICE 3.Abram gave us direction on elect. how about TV?data ect. 4.design for vanities to replace pedestal sinks and any change to bath rooms(currently none in budget) ROBERT TO FORWARD PLAN/SPEC Site 1.review wall progress 2.Get everyone thinking about walk from kitchen to master to library EFTA_R1_01493979 EFTA02425592 WE REVIEWED THE SKETCHES AND ROBERT TO REFINE PLAN Gensler WE REVIEWED ROBERTS PLAN FOR THE THEATER /POOL AND HE WILL REVISE AND FORWARD TO ME TO STAKE OUT To be viewed on May 14th CZM Deionoh Jeffrey last time we didn't get to tiki, pool pavilion, kite house, entry, plaza, theater and indoor pool with Robert and you together Publisher and Editor-in-Chief Chocolate Sauce. "Nourishing the Inner Worlds of Children" EFTA_R1_01493980 EFTA02425593
ℹ️ Document Details
SHA-256
cf7aacfe60344ce555cbac2d520498f07ad50acebefe681a5a4b47abce15c39f
Bates Number
EFTA02425591
Dataset
DataSet-11
Type
document
Pages
3

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!