EFTA02526966.pdf

DataSet-11 1 page 117 words document
👁 1 💬 0
📄 Extracted Text (117 words)
From: brice gordon < Sent: Thursday, June 28, 2018 11:10 AM To: Jeffrey Epstein Cc: LSJ GSJ; Rich Kahn Subject: LSJ Nana Refurbishment Good Morning=/font> Refurbishment of Nana Can we send Nana to =VI for Topside Paint etc First, Then have tubes removed for fabric=tion. Whilst the Tubes are away, Carlos and Randy will continue with Ref=t of Cabin House. Paint Topside, water sa=d bottom and polish, BVI $7500.00, plus haulage, 10days for work.</=iv> Off Shore (VI) $19,992.00, tubes removed, shipped FL for =A0fabrication (3 weeks) plus 5 days for install, = days to cure. Color of Tube as per Existing Can we proceed? regards =/div> Brice Gordon The Saint Jame= Group USVI Ph: 1 EFTA_R1_01667392 EFTA02526966
ℹ️ Document Details
SHA-256
cfa1886d24d35de7833b443718ce3f8e8c687dc6170146a65a93d018c13f202b
Bates Number
EFTA02526966
Dataset
DataSet-11
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!