EFTA01792367
EFTA01792369 DataSet-10
EFTA01792371

EFTA01792369.pdf

DataSet-10 2 pages 556 words document
P17 V16 V11 P19 P23
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (556 words)
From: jeffrey epstein <[email protected]> Sent: Saturday, January 15, 2011 10:32 PM To: Subject: e: up date Send photos of thongs in kitchen On Jan 15, 2011,=at 5:50 PM, > wrote: =Hi Mr.Epstein the house cleaning ganization of all closet areas are go=ng as planed all electronic rubbish was picked up except fo= some cpu's that avants to clean up. The server room will be the next o= the list when integrates the server to apple. The ladies have been g=ing floor to floor cleaning every inch of the house all closets included. W= left all storage items laid out in the catering kitchen area on C-le=el for you to view, to decide what is garbage , or w=at can be sold and what can be used in other homes. I am also putting a=list together with pictures of all all other items that •has requester t= be shipped to LSJ . I would like to have all shipping items picked up=this coming week of 1/17/11if possible, I have called &nbs=;and we will get pricing for shipping when we have a complete 1=st that you approve .1 have also been working on a hot water heating p=oblem that I discovered when the colder weather came in last week. The heat=ng system upper re heat Zones being supplied by AC-3 fan &=mp; the 5th floor fan units heating was loosing water pressure effecting ro=m temperatures on the 4th & 5th floors. After various trouble shooting t=sts I found the shell & tube Heat exchanger #2 has a tube le=k and the re heat hot water was leaking out water pressure through the=steam condensate line. This was causing the Re heat hot water s=stem pressure to drop and the re heat coils to get air bound on the 5=h & 6th floors. I have isolated heat exchanger #2 until the t=be bundle can be replaced ,we are operating off of Heat exchanger#1 with&nb=p; an extra steam bypass supply to make up the differencein capacity a=l rooms are now making set points. I replaced Heat exchanger #1 tube bundle=about 2 years ago, #2 tube bundle which is leaking is original to the h=use .The Source One project is also moving forward the full energy rep=rt and recommendations for system up grades will be complete by 1/25/1= i am also waiting on Pricing for up grades that AD Winston is wo=king on for free cooling & removal of the old Carrier Chiller and a=ding the additional 25 tons of compressors to the new Air stack C=iller. I am also in the rocess of setting up meetings with and t=e various mechanical maintenance contractors. See you soon &nbs=; Date: Sat, 15 Jan 2011 09:05:09 -0400 Subject: From: [email protected] <mailto:[email protected]> To: <mailto how s our project coming. &=bsp; The information contained in this communication is c=nfidential, may be attorney-client privileged, may EFTA_R1_00123132 EFTA01792369 constitute inside inf=rmation, and is intended only for the use of the addressee. It is the pr=perty of Jeffrey Epstein Unauthorized use, disclosure or copying of t=is communication or any part thereof is strictly prohibited and may b= unlawful. If you have received this communication in error, please noti=y us immediately by return e-mail or by e-mail to <mailto:[email protected]> jeevacation@gmai=.com <mailto:[email protected]> , and destroy this communication and all copies thereof, =ncluding all attachments. copyright -all rights reserved 2 EFTA_R1_00123133 EFTA01792370
ℹ️ Document Details
SHA-256
d0a567422165b0c9592ad0d1680357fba2486a750e031e3991404e7c0f5cb4ff
Bates Number
EFTA01792369
Dataset
DataSet-10
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!