📄 Extracted Text (556 words)
From: jeffrey epstein <[email protected]>
Sent: Saturday, January 15, 2011 10:32 PM
To:
Subject: e: up date
Send photos of thongs in kitchen
On Jan 15, 2011,=at 5:50 PM, > wrote:
=Hi Mr.Epstein the house cleaning ganization of all closet areas are go=ng as planed all electronic rubbish
was picked up except fo= some cpu's that avants to clean up. The server room will be the next o= the list when
integrates the server to apple. The ladies have been g=ing floor to floor cleaning every inch of the house all closets
included. W= left all storage items laid out in the catering kitchen area on C-le=el for you to view, to decide what is
garbage , or w=at can be sold and what can be used in other homes. I am also putting a=list together with pictures of all
all other items that •has requester t= be shipped to LSJ . I would like to have all shipping items picked up=this coming
week of 1/17/11if possible, I have called &nbs=;and we will get pricing for shipping when we have a complete
1=st that you approve .1 have also been working on a hot water heating p=oblem that I discovered when the colder
weather came in last week. The heat=ng system upper re heat Zones being supplied by AC-3 fan &=mp; the 5th floor
fan units heating was loosing water pressure effecting ro=m temperatures on the 4th & 5th floors. After various trouble
shooting t=sts I found the shell & tube Heat exchanger #2 has a tube le=k and the re heat hot water was leaking out
water pressure through the=steam condensate line. This was causing the Re heat hot water s=stem pressure to drop
and the re heat coils to get air bound on the 5=h & 6th floors. I have isolated heat exchanger #2 until the t=be bundle
can be replaced ,we are operating off of Heat exchanger#1 with&nb=p; an extra steam bypass supply to make up the
differencein capacity a=l rooms are now making set points. I replaced Heat exchanger #1 tube bundle=about 2 years
ago, #2 tube bundle which is leaking is original to the h=use .The Source One project is also moving forward the full
energy rep=rt and recommendations for system up grades will be complete by 1/25/1= i am also waiting on Pricing for
up grades that AD Winston is wo=king on for free cooling & removal of the old Carrier Chiller and a=ding the additional
25 tons of compressors to the new Air stack C=iller. I am also in the rocess of setting up meetings with and
t=e various mechanical maintenance contractors. See you soon
&nbs=;
Date: Sat, 15 Jan 2011 09:05:09 -0400
Subject:
From: [email protected] <mailto:[email protected]>
To: <mailto
how s our project coming. &=bsp;
The information contained in this communication is
c=nfidential, may be attorney-client privileged, may
EFTA_R1_00123132
EFTA01792369
constitute inside inf=rmation, and is intended only for
the use of the addressee. It is the pr=perty of
Jeffrey Epstein
Unauthorized use, disclosure or copying of t=is
communication or any part thereof is strictly prohibited
and may b= unlawful. If you have received this
communication in error, please noti=y us immediately by
return e-mail or by e-mail to <mailto:[email protected]> jeevacation@gmai=.com
<mailto:[email protected]> , and
destroy this communication and all copies thereof,
=ncluding all attachments. copyright -all rights reserved
2
EFTA_R1_00123133
EFTA01792370
ℹ️ Document Details
SHA-256
d0a567422165b0c9592ad0d1680357fba2486a750e031e3991404e7c0f5cb4ff
Bates Number
EFTA01792369
Dataset
DataSet-10
Document Type
document
Pages
2
Comments 0