EFTA01657924
EFTA01657926 DataSet-10
EFTA01657934

EFTA01657926.pdf

DataSet-10 8 pages 140 words document
P23 D4 P17 V16
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (140 words)
EFTA01657926 Securing Plan • Clearing Teams assigned to this operation will arrive on Little Saint James on August 12, 2019 • Clearing Teams will arrive at the dock located on the North West Tip of the Island • For the purpose of clearing and securing the Island, the Island will be broken up into 4 zones • There will be a total of 4 Teams assigned to clearing and securing the island • Each zone will have a designated Team assigned to clearing and securing their zone • The Team Leader for each team will be responsible for labeling each structure, and documenting the location of the structure. EFTA01657927 Little Saint James Island HE EFTA01657928 Zones James Island • Ledges Of- Little St Jcim EFTA01657929 EFTA01657930 EFTA01657931 Zone 3 EFTA01657932 Zone 4 10 Ledges of Latle St Jamec • EFTA01657933
ℹ️ Document Details
SHA-256
d0b528d27ff544dedba16a97a7fe794bbff59b3351971df8859a70c992b7f29f
Bates Number
EFTA01657926
Dataset
DataSet-10
Document Type
document
Pages
8

Comments 0

Loading comments…
Link copied!