EFTA02710201.pdf
👁 1
💬 0
📄 Extracted Text (250 words)
From: Daphne Wallace <
Sent: Friday, May 29, 2015 8:50 PM
To: Jeffrey Epstein
Cc: Rich Kahn
Subject: Fwd: FW: Little St. James
Attachments: A1.0.pdf; C1.0.pdf
Greetings Sir,
For your review and comm=nts, the revised drawings of the Maintenance/Workshop Building.
=br>
Respectfully, Daphne
Forwarded message
From: John P. Woods, AIA <
Date: =ri, May 29, 2015 at 3:45 PM
Subject: FW: Little St. James
To: Daphne=Wallace < /=», Cecile deJongh «mailto
», Ann Rodriquez <
>>
Daphne,
Attached are the revised site and floor plans for the Maintenance/Workshop =uilding. The changes are based upon the
site visit held yesterday with Mr.=Epstein. He requested a storage addition to be placed at the northern end =f the
building. We have placed that addition at the center of the northern=facade as the most strategic location for the
addition. If we place i= further to the west, it will interfere with the access driveway leading t= the main residence. If we
place it further to the east, it will be too cl=se to the edge of the abutment, in an area where the soil appears to be
un=table. Upon approval of the plan, we will finish the drawings for the CZM =ermit application.
JPW
Original Message
From: JAREDIAN DESIGN GROUP Imailtc
Sent: Friday, May 29, 2015 3:11PM
To: John P. Woods
Subject: Little St. James
JAREDIAN DESIGN GROUP
Architects, Engineers and Construction Manager
1
EFTA_R1_02120664
EFTA02710201
This email is free from viruses and malware because avast! Antivirus protec=ion is active.
http://www.avast.com=br>
2
EFTA_R1_02120665
EFTA02710202
ℹ️ Document Details
SHA-256
d16fb92f7a137b28115eb6c6da6a2c55eb9a7030f8cb662918ec7772175725c9
Bates Number
EFTA02710201
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0