📄 Extracted Text (281 words)
From: Lany Visoski <Ila>
To: Je vacation <jeevacation®gmail.com>
Cc: Rich Kahn
Subject: LED update
Date: Thu, 28 Jun 2018 21:25:50 +0000
Jeffrey
Pete spoke with ALI. aircraft lighting International
Same company Eric uses for LED lights,
According to sales person, no potentiometers are required in the LED system light change,
From Pete;
Hi Lany,
I spoke to Shervin today-
There are no potentiometer or other components required.
Each of the 4 existing power supplies are replaced. Minor change in pinouts for plugs.
Bulbs are plug in, mount brackets (included) may have to be replaced due to
difference in bulb diameter.
System is PMA Approved, no need for additional FAA documentation.
It would take 3 to 4 business days to assemble components after order is placed.
He estimates 2 to 3 days for the installation which could be done at TEB.
Would the arrival on the 8th leave us time before next trip?
If so, need to place order soon-
Regards,
Pete
Sent from My I-Pad
Begin forwarded message:
From: Shervin Rezaie
Date: June 28, 2018 at 3:57:45 PM EDT
To: Pete Rawson
Subject: Re: Scanned from Meridian Hangar 107
Hi Pete,
Great speaking with you today. Below you'll find the quote updated. If you need anything else please do not
hesitate to call me.
Thanks,
Shervin
EFTA00894624
ORIGINAL QUANTI
PNS ALI PN TY Cast Each TOTAL
1800.100.
2.1.21/09 L5800-300-45 IS $851.00 $15,118.00
5800405.
2.121/09 L5800-105-45 3 $400.00 $1,200.00
1800481.
212M L5800-285-45 24 $851.00 $20,424.00
1800.120.
252000 L5800-120-45 S $400.00 $3,200.00
Wag;n R itgOeVa 4 $700.00 52,800.00
Grad Total $42.942.00
General Manager
Aircraft Lighting International
195 Engineers Road
Haup pa e, NY 1 1788
Cell:
Office:
www.aircraftlighting.com
Sent from my iPhone
EFTA00894625
ℹ️ Document Details
SHA-256
d173ec9c2819b55d8dd5f410f7012c1ae8833e3bba7ada6403ba5c8e8e3e5d78
Bates Number
EFTA00894624
Dataset
DataSet-9
Document Type
document
Pages
2