EFTA00598479.pdf

DataSet-9 2 pages 196 words document
P23
👁 1 💬 0
📄 Extracted Text (196 words)
Zorro Project list os of 1/3/2013 PRIORITIZE PROJECT DESCRIBTION !Laborers Hours Rate Labor Cost Material cost Estimated cost Stan Date End Date I Notes Landscaping Main house refurbishment $ 50,000.00 Replace Ponderosa pines $ 59,170.00 Terraces 52,000.00 3/25/2013 Gutter Stucco Telcomm/Data Fiber/Data option 1- ITC $ 137,121.14 Bids to be refined - Rich to conference with b Fiber/Data option 2 - Richard $ 111,773.27 Phones main house $ 30,995.00 Bids on review new system needed - current r Mechanical upgrades Brice to forward bids Cooling tower replacement $ 17,032.08 JCH did pumps Stainless steel option $ 5,168.00 Do not take option Pool pak replacement Unit cost- dehumidifiers in swimming pool area $ 43,170.00 JB Henderson Engineering $ 6,000.00 Other cost $ 5,000.00 HAVAC control system Needs upgrade Tools Audio/TV upgrades Western Systems estimated with options $ 125,000.00 Proposal Vehicles/Equipment Purchase new suburban LV to get quote Brush Hog Well Fully on line with Well -K, waiting to hear permit should be Iinahred by the end or Om week in is Roof Continue to maintain Fountain - determine cause of leak Paris upgrade lot 2 EFTA00598479 Zorro Project list os of 1/3/2013 ice toia hone "IC EFTA00598480
ℹ️ Document Details
SHA-256
d1a87767d81d7e79c8e19891586821cd1c0a55338001ae0532f23ebaa97a9971
Bates Number
EFTA00598479
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!