👁 1
💬 0
📄 Extracted Text (798 words)
From: Richard Kahn
To: "jeffrey E." <[email protected]>
Subject: Fwd: Feedback from Mr. Epstein - August 3, 2016
Date: Wed, 17 Aug 2016 14:39:27 +0000
Attachments: gsj-Layoutl_(2).pdf; gsj-Layoutl_(3).pdf; gsj-Layoutl_(4).pdf; gsj-Layoutl.pdf
are you ok with drawings - are there any revisions you would like made?
is it ok to release 5,100 payment to bateman
please advise
thank you
Richard Kahn
HBRK Associates Inc.
Begin forwarded message:
From: Daphne Wallace <I
Subject: Fwd: RE: Re: Re: Feedback from Mr. Epstein - August 3, 2016
Date: August 15, 2016 at 6:04:29 PM EDT
To: Jeffrey Epstein <[email protected]>
Cc: Rich Kahn < >, ann rodriquez
Greetings Sir,
Preliminary Dock drawings from Jeff Bateman for your review and comments.
Respectfully, Daphne
Forwarded message
From: <
Date: Aug 15, 2016 5:50 PM
Subject: RE: Re: Re: Feedback from Mr. Epstein - August 3, 2016
To: "Daphne Wallace"
Cc: "Ivan Sanchez V"
Hi Daphne -
Attached is a very preliminary set of plans based on our conversations and direction from Amy. The
structural engineer hasn't reviewed, he will as the design gets closer to fruition. Sheet 4 is for the plan and
profile of each dock, what is shown is not for this project - NOAA has not verified the water levels for July
EFTA00821039
20 yet, so the contours will all change slightly. Once the water levels are verified, we will process the data to
generate the profiles. Notes and details will also go on this sheet.
Please pass these for review, and let us know your comments. Again, these are preliminary and not a final
work product.
Thanks and have a great evening !!
Jeff
---- Original Message
Subject: RE: Re: Re: Feedback from Mr. Epstein - August 3, 2016
From: "Daphne Wallace" <I
Date: 8/15/16 7:43 am
To: "Jeffrey Bateman"
Cc: "ann rodriquez" "Rich Kahn" <
Greetings Mr. Bateman,
Perfect. I will look out for your email.
Kind regards, Daphne
On Aug 15, 2016 7:17 AM, < wrote:
good morning Daphne -
we are finalizing the preliminary drawings and will have you something by the end of the day
thanks !!
Original Message
Subject: Re: Re: Feedback from Mr. Epstein - August 3, 2016
From: "Daphne Wallace" <I
Date: 8/12/16 4:22 pm
To: "Jeffrey Bateman" < >, "ann rodriquez" <
Greetings Mr. Bateman,
Thank you so much. No matter the hour, please feel free to email them to me, and I will forward to
Mr. Epstein. He is anxious to see them :) Daphne
On Fri, Aug 12, 2016 at 3:21 PM, < > wrote:
Hi Daphne -
I am awaiting the draft sketches and will forward them as soon as I receive them. They are expected
shortly. Thanks and have a great weekend !!
Jeff
Original Message
Subject: Re: Feedback from Mr. E stein - Au ust 3, 2016
From: "Daphne Wallace"
EFTA00821040
Date: 8/12/16 3:59 pm
To: "Jeffrey Bateman"
Cc: "ann rodriquez"
Greetings Mr. Bateman,
Just checking in with you on the initial drawings for Mr. Epstein's review.
Kind regards, Daphne
On Wed, Aug 10, 2016 at 2:06 PM, Daphne Wallace > wrote:
Greetings Mr. Bateman,
As promised, the lengths of the existing vessels are as follows:
Little C (Pro Catamaran) - 36 feet
PRD (Cape Horn) - 32 feet
Nanna (Rib-tech) - 34 feet
Sportis (Sportis) - 34 feet
Big N (LMC-8 barge) - 74 feet
Pursuit (Pursuit) - 23 feet 6 inches
Pending for the fleet is a 42 foot Nautica boat.
Hope this helps. Kind regards, Daphne
On Tue, Aug 9, 2016 at 9:23 AM, < > wrote:
good morning daphne and ann !!
hope all is well. i have a couple questions from my engineers that I'd like your feedback on.
thanks and have a great day !!!
For barge docks (100x15Ft)
- Barge specifications.
- Capacity (how many barges to be docked at the same time).
- Docking purpose.
- Facilities needed on dock.
- Dock Facilities to propose.
- Maritime signaling, buoys and other dock approach requirements.
For pleasure dock (100x10Ft)
- Boat expectations (biggest boat allowed to dock).
- Capacity (how many boats allowed to dock at the same time, considering the biggest ones)
- Facilities needed on dock.
- Dock Facilities to propose.
- Maritime signaling, buoys and other dock approach requirements.
Original Message
Subject: Feedback from Mr. E stein - Au ust 3, 2016
From: "Daphne Wallace"
Date: 8/3/16 5:26 pm
To: "Jeffre Bateman" "ann rodriquez"
Greetings Mr. Bateman,
Mt Epstein says the barge docks will need to be 100 feet in length and 15 feet in width.
EFTA00821041
The private dock can be 100 feet in length by 10 feet in width.
Please do not hesitate to email or call if you need any additional information, and I will
touch base with you on Friday, August 12.
Kind regards, Daphne
EFTA00821042
ℹ️ Document Details
SHA-256
d2b10bee23004553c36fb1abd238dd073046cbc7476c986a920a0f4d445c3290
Bates Number
EFTA00821039
Dataset
DataSet-9
Type
document
Pages
4
💬 Comments 0