EFTA00821039.pdf

DataSet-9 4 pages 798 words document
👁 1 💬 0
📄 Extracted Text (798 words)
From: Richard Kahn To: "jeffrey E." <[email protected]> Subject: Fwd: Feedback from Mr. Epstein - August 3, 2016 Date: Wed, 17 Aug 2016 14:39:27 +0000 Attachments: gsj-Layoutl_(2).pdf; gsj-Layoutl_(3).pdf; gsj-Layoutl_(4).pdf; gsj-Layoutl.pdf are you ok with drawings - are there any revisions you would like made? is it ok to release 5,100 payment to bateman please advise thank you Richard Kahn HBRK Associates Inc. Begin forwarded message: From: Daphne Wallace <I Subject: Fwd: RE: Re: Re: Feedback from Mr. Epstein - August 3, 2016 Date: August 15, 2016 at 6:04:29 PM EDT To: Jeffrey Epstein <[email protected]> Cc: Rich Kahn < >, ann rodriquez Greetings Sir, Preliminary Dock drawings from Jeff Bateman for your review and comments. Respectfully, Daphne Forwarded message From: < Date: Aug 15, 2016 5:50 PM Subject: RE: Re: Re: Feedback from Mr. Epstein - August 3, 2016 To: "Daphne Wallace" Cc: "Ivan Sanchez V" Hi Daphne - Attached is a very preliminary set of plans based on our conversations and direction from Amy. The structural engineer hasn't reviewed, he will as the design gets closer to fruition. Sheet 4 is for the plan and profile of each dock, what is shown is not for this project - NOAA has not verified the water levels for July EFTA00821039 20 yet, so the contours will all change slightly. Once the water levels are verified, we will process the data to generate the profiles. Notes and details will also go on this sheet. Please pass these for review, and let us know your comments. Again, these are preliminary and not a final work product. Thanks and have a great evening !! Jeff ---- Original Message Subject: RE: Re: Re: Feedback from Mr. Epstein - August 3, 2016 From: "Daphne Wallace" <I Date: 8/15/16 7:43 am To: "Jeffrey Bateman" Cc: "ann rodriquez" "Rich Kahn" < Greetings Mr. Bateman, Perfect. I will look out for your email. Kind regards, Daphne On Aug 15, 2016 7:17 AM, < wrote: good morning Daphne - we are finalizing the preliminary drawings and will have you something by the end of the day thanks !! Original Message Subject: Re: Re: Feedback from Mr. Epstein - August 3, 2016 From: "Daphne Wallace" <I Date: 8/12/16 4:22 pm To: "Jeffrey Bateman" < >, "ann rodriquez" < Greetings Mr. Bateman, Thank you so much. No matter the hour, please feel free to email them to me, and I will forward to Mr. Epstein. He is anxious to see them :) Daphne On Fri, Aug 12, 2016 at 3:21 PM, < > wrote: Hi Daphne - I am awaiting the draft sketches and will forward them as soon as I receive them. They are expected shortly. Thanks and have a great weekend !! Jeff Original Message Subject: Re: Feedback from Mr. E stein - Au ust 3, 2016 From: "Daphne Wallace" EFTA00821040 Date: 8/12/16 3:59 pm To: "Jeffrey Bateman" Cc: "ann rodriquez" Greetings Mr. Bateman, Just checking in with you on the initial drawings for Mr. Epstein's review. Kind regards, Daphne On Wed, Aug 10, 2016 at 2:06 PM, Daphne Wallace > wrote: Greetings Mr. Bateman, As promised, the lengths of the existing vessels are as follows: Little C (Pro Catamaran) - 36 feet PRD (Cape Horn) - 32 feet Nanna (Rib-tech) - 34 feet Sportis (Sportis) - 34 feet Big N (LMC-8 barge) - 74 feet Pursuit (Pursuit) - 23 feet 6 inches Pending for the fleet is a 42 foot Nautica boat. Hope this helps. Kind regards, Daphne On Tue, Aug 9, 2016 at 9:23 AM, < > wrote: good morning daphne and ann !! hope all is well. i have a couple questions from my engineers that I'd like your feedback on. thanks and have a great day !!! For barge docks (100x15Ft) - Barge specifications. - Capacity (how many barges to be docked at the same time). - Docking purpose. - Facilities needed on dock. - Dock Facilities to propose. - Maritime signaling, buoys and other dock approach requirements. For pleasure dock (100x10Ft) - Boat expectations (biggest boat allowed to dock). - Capacity (how many boats allowed to dock at the same time, considering the biggest ones) - Facilities needed on dock. - Dock Facilities to propose. - Maritime signaling, buoys and other dock approach requirements. Original Message Subject: Feedback from Mr. E stein - Au ust 3, 2016 From: "Daphne Wallace" Date: 8/3/16 5:26 pm To: "Jeffre Bateman" "ann rodriquez" Greetings Mr. Bateman, Mt Epstein says the barge docks will need to be 100 feet in length and 15 feet in width. EFTA00821041 The private dock can be 100 feet in length by 10 feet in width. Please do not hesitate to email or call if you need any additional information, and I will touch base with you on Friday, August 12. Kind regards, Daphne EFTA00821042
ℹ️ Document Details
SHA-256
d2b10bee23004553c36fb1abd238dd073046cbc7476c986a920a0f4d445c3290
Bates Number
EFTA00821039
Dataset
DataSet-9
Type
document
Pages
4

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!