From: Richard Kahn
Sent: Monday, April 25, 2016 10:25 PM
To: Jeffrey Epstein
Subject: FW: Zorro Ranch / CenturyLink Quote
Attachments: HEMC_40MHz_Link details_2016.04.25.pdf; Zorro Ranch 1 GBPS MW Quote -
042516.pdf
From: Chris Cappiello
Date: Monday, April 25, 2016 at 6:08 PM
To: Richard Kahn >
Cc: «a href=>
Hey Richar=.
I hope all is well with you.
<=span>
Per our discu=sion last week we have finalized our design for this project to support the=requested 1 GBPS solution from
Day 1. The incremental cost from 300 MB to 1GB is all related to software licensing =osts on this solution and is
negligible to the total project. On that basis=we just designed this to 1GBPS day one.
I have attached t=e link design for you and have provided a summary below.
Within this plan we would order the required equipment (2=links + 1 spare set) and licensing (3 links) to expedite the
delivery of service. If we were to try and break this into PLAN A and PLAN B it could =elay things by a whole order of
magnitude and increase your cost by more th=n the extra FCC license cost we are putting in day 1($4k investment to
str=amline the project). By taking this approach we can speed up the deployment timeline and cover all our ba=es so
that when we come out to do the install we have the solution in place=
1. &nb=p; Primary Link Design
a. &nb=p; Sandia Crest to Main Residence
=span style="font-style: normal; font-variant: normal; font-weight: normal; =ont-size: 7pt; line-height: normal; font-
family: 'Times New Roman';"> =nbsp; &nbs=; &n=sp; i. 11GHz with 4R=7; antennas
EFTA_R1_02078557
EFTA02703189
&=bsp; &nb=p; ii. NOTE: If this 84-220;Primary Solution" is successful you would have 1 extra set
of spa=e equipment (2 total), as the second link from ZDC Main to Main Residence would not be used.=/o:p>
2. &nb=p; Secondary Link Design
class="MsoListParagraph" style="margin-left:1.0in;text-indent:-.25in;mso-l=st:I0 level2 Ifol">a. Sandia Crest to
ZDC
&nb=p; &=bsp; 11GHz with 4R=7; antennas
b. ZDC Tower to Main Residence
&nb=p; &=bsp; = i. 11GHz with 2R=7; antennas
&=bsp; &nb=p; ii. NOTE: if we were=to go with secondary solution based upon the primary solution
not working f=om a line of site perspective, you would have 1 set of spare equipment.4=pan>
&n=sp;
Quote Assumptions:
5. Site Readiness — FT assumes that the sites ha=e tower space, cabinet space for power supplies, power available
and switch=router in place to take receipt of service
<=pan style="font-size: 11pt; font-family: Calibri, sans-serif;">Sequence of =vents:
=nbsp; &nbs=; i. Upon written appr=val of quote
=nbsp; &nbs=; &n=sp; ii. Process will tak= 1 week to get initial channels assigned
&n=sp; =nbsp; &nbs=; iii. Entire licensin= process will take 4-5 weeks
d. Zorro Ranch issue PO and provide payment (1-2 days)=o:p>
<=--[if !supportLists)-->2. &=bsp; Week of 5/2/16<=p>
a. =FCC provide conditional channel approval=/span>
=nbsp; &nbs=; i. Remaining period =f time is just paperwork process to finalize license
b. &nb=p; Future Tech order equipment based off of conditiona= channel approval to get order in process
&=bsp; &nb=p; i. 4.6 week lead tim= after receipt of order
3.&=bsp; Week of 5/9 or 5/16
2
EFTA_R1_02078558
EFTA02703190
a. &=bsp; Future Tech to conduct Field Site Survey=/span>
4. =Week of 5/23
a. Future Tech to complete field report
&nbs=;
Please note the above is a HIGH LEVEL timeline to help provide an outline=for the path forward.
Thanks again for the opportunity, we look forward to hear=ng from you.
Best regards,
> w=ote:
Hey Richard,
I spoke to Brice yesterday to let him know it would probabl= be the middle of next week before we get a proposal over.
We are running a=couple designs with different products to get to 1 GB with the availabilities we are looking for. If
you=need it sooner let me know and I will apply some internal pressure.<=:p>
Best regards,
</=>
<=p>
Chris Cappiello
Director of Bu=iness Development
3
EFTA_R1_02078559
EFTA02703191
Future Technologies Venture, LLC
E:
<image001.png>
From: Richard Kahn
Sent: Friday, April 22, 2016 1:09 PM
To: Chris Cappiel=
Cc
<zorro.office@gmaitcom>
Subject: =e: Zorro Ranch / CenturyLink Quote
any update on propos=l?
please advise
thank you
Richard Kahn
=HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
=/o:p>
On Apr 18, 2016, at 8:29 AM, Chris Cappiello <
105.58'- 13" W
Elevation 6726 ft
=/div>
4
EFTA_R1_02078560
EFTA02703192
Big Tower on Ranch
35-141-13" Nao:p>
105-58'-46" W
<=iv>
Elevation 6590 ft
Sandia =rest Tower
35-12'-60"
class="MsoNormal">106-27'-7"
&nbs=;
On Fri, Apr 15, 2016 at 5:25 PM, =orro Ranch <zdc.rt41=gmail.com <mailto:[email protected]» wrote:
Chris
I will confirm all coordinates this =eekend when back on site
I will also send photo if MH location
Thank you and have a great Weekend
Thank you
Regards Brice
Sent from my iPhone
On Apr 15, 2016, at 3:28 PM, Chris Cappiello
> wro=e:
5
EFTA_R1_02078561
EFTA02703193
Brice,
Please see the com=ents below and report back. I'll put a quote together based on your
r=sponse about the Sandia Crest coordinates and if you would rather have one link direct to the main residence rather
than going through ZDC.
I think Coordinates for Sandia Creat tower are not accurate, please see below screenshot. I have
=ssumed a tower out of multiple towers on the peak — GE file attached=please verify coordinates.
Ran at 11 GHz in 40 Mhz channel with HAAM</=pan>
Sandia Creat tower - ZDC Main tower: 26.8 mile
99.997% at 227 Mbps and 99.992% at 297 Mbps with 3ft-3ft dishes<=span>
ZDC Main tower - Main =esidence: 2.17 mile
99.999% at 297 Mbp= with 2ft-2ft dishes.
As per pathloss, a link between Sandia Creat tow=r and Main Residence is possible in case that is
desired.=/p>
Sandia Creat=tower - Main Residence: 27.53 mile
Best regards,
6
EFTA_R1_02078562
EFTA02703194
Chris Cappiello
Director of Business Development
Future Technologies =enture,LLC
<image003.png> <http://www.linkedin.com/co=pany/future-technologies-lIc>
<=iv>
From: Zorro Ranch Imailto:[email protected] <mailto:zdc.rt41@=mail.com>
Sent: Friday, April 15, 2016 3:17 PM
To: Chris Cappiel
Hector Cintron
Cc: Richard 1@i-in ); ZDC
<[email protected] <mailto:[email protected]»
Subject: Fwd: Zorro Ranch=/ CenturyLink Quote
To all
Attached from century link fo= your review and comment
Thank you =o:p>
Regards Brice
Sent from my iPhone
Begin forwarded message:
From: "Armstrong, Annette"
Date: April 15, 2016 at 1:51:45 PM =ST
To: "'Zorro Ranch— <[email protected] <mailto:[email protected]»
Subject: Zorro Ranch /=CenturyLink Quote
Good Morning Brice,
Attached you will find pricing for the Wave Fiber Circuit to b= located on Sandia Crest.
7
EFTA_R1_02078563
EFTA02703195
Monthly Recurring 200M $=500.00 3yr Term and Non•Recurring Construction Charges are
waived 100% &nb=p;$0.00
I did request pricing for 100M Circuit on a 3yr term, and the =ort price was the same for 100M
or 200M circuit.
Let us know if you have any questions or concerns. I can have =he contract ready for review
upon your approval.
Regards,=/p>
Annette
Annette Armstrong
Sr. Account Executive=o:p>
CenturyLink Business Technology Solution=
400 Tijeras Ave NW</=:p>
Albuquerque, NM 87102
Office:
<=p>
<image004.jpg>
<=:p>
=his communication is the property of CenturyLink and may contain confidenti=l or privileged
information. Unauthorized use of this communication is stri=tly prohibited and may be unlawful. If you have received
this communication in error, please immediately notify the s=nder by reply e-mail and destroy all copies of the
communication and any at=achments.
=It;Link details_2016.04.15.pdf>
=It;Zorro Ranch.kml>
=/div>
8
EFTA_R1_02078564
EFTA02703196
-- </a
Brice Gordon</=:p>
Stanley, NM
P=:
</=iv>
</=iv>
9
EFTA_R1_02078565
EFTA02703197
ℹ️ Document Details
SHA-256
d3c9a2cfe1771b2159ac698d5b3dc64c38ed578f6c32e036c7ff4315858a9245
Bates Number
EFTA02703189
Dataset
DataSet-11
Document Type
document
Pages
9
Comments 0