EFTA00645594
EFTA00645595 DataSet-9
EFTA00645597

EFTA00645595.pdf

DataSet-9 2 pages 465 words document
P17 V16 V11 P23 D6
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (465 words)
From: "Marc Dober" To: "Gary Kerney" c >leffrey epstein" <[email protected]> Subject: Re: K&S Subcontractor no-show Date: Thu, 17 Nov 2011 11:42:46 +0000 Importance: Normal Kent did show up this morning. My suggestion and to alleviate some of the pressure on K&S, we should get someone else to do the new windows for the bathroom and breeze way doors. Thanks Marc Sent via BlackBeny by AT&T From: "Gary Kerney" Date: Wed, 16 Nov 2011 18:19:05 -0500 To: Jeffrey epstein<[email protected]> Cc: Marc Dober<I Subject: Re: K&S Subcontractor no-show I believe we bought the 2 1/2 thick frame material as part of the contract with k&s. 1,700? Do the pr workers understand the design. Extra thick frame and 3" louvers I think the lover doors have to be made in a millwork shop and fitted to our onsite frame Sent from my iPhone On Nov 16, 2011, at 5:37 PM, "Jeffrey epstein" <[email protected]> wrote: t?9 Sony for all the typos .Sent from my iPhone Begin forwarded message: From: Marc Dober Date: November 16, 2011 4:15:48 PM EST To: Jeffrey Epstein <[email protected]> Cc: Richard Kahn <I thomas melnick Subject: Re: K&S Subcontractor no-show Jeff, As a follow up to this: EFTA00645595 Here are some numbers : To date we do not owe K&S anything currently. They need to finish some work that was not completed. We have a pending change order that has NOT been approved for $9,730 for manufacture breezeway doors and to manufacture the shutters for the chillax bathroom. We also have a change order for to redo the bathroom windows and the additional breezeway doors plus installation of both for $10,600. At this point we should not put up with the BS K&S is giving us. Yes, they do good work but they show up when they want to which is unacceptable especially when we have a tight deadline. My contact in Puerto Rico can have two very highly skilled millworkers over here tomorrow for $9k for 40hrs of work ($75 /hour ), airfare (approx. $600), per diem ($35/ day), and 15% overhead/profit ($ lk), accommodations would be about $400. We would put these two guys on getting the chillax bathroom, breezeways doors done. Marc Jeff, The K&S guys did not show up this morning and wanted to propose bringing in two guys from a company that have dealt with in Puerto Rico. With this guy not showing up, the millwork that still needs to be completed by the time of your arrival won't be done. I am getting the pricing together now and have the two guys on hold awaiting the approval. We will bill back K&S for this as he knows this is crunch time and not to show up is unacceptable. Please let me know if this ok to proceed. Thanks Marc EFTA00645596
ℹ️ Document Details
SHA-256
d3ce255d40eafd653e82a48a75244944e0f9dd89a20da80ffc3005d19ae60f57
Bates Number
EFTA00645595
Dataset
DataSet-9
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!