📄 Extracted Text (465 words)
From: "Marc Dober"
To: "Gary Kerney" c >leffrey epstein" <[email protected]>
Subject: Re: K&S Subcontractor no-show
Date: Thu, 17 Nov 2011 11:42:46 +0000
Importance: Normal
Kent did show up this morning.
My suggestion and to alleviate some of the pressure on K&S, we should get someone else to do the new
windows for the bathroom and breeze way doors.
Thanks
Marc
Sent via BlackBeny by AT&T
From: "Gary Kerney"
Date: Wed, 16 Nov 2011 18:19:05 -0500
To: Jeffrey epstein<[email protected]>
Cc: Marc Dober<I
Subject: Re: K&S Subcontractor no-show
I believe we bought the 2 1/2 thick frame material as part of the contract with k&s. 1,700?
Do the pr workers understand the design. Extra thick frame and 3" louvers I think the lover doors have to be
made in a millwork shop and fitted to our onsite frame
Sent from my iPhone
On Nov 16, 2011, at 5:37 PM, "Jeffrey epstein" <[email protected]> wrote:
t?9
Sony for all the typos .Sent from my iPhone
Begin forwarded message:
From: Marc Dober
Date: November 16, 2011 4:15:48 PM EST
To: Jeffrey Epstein <[email protected]>
Cc: Richard Kahn <I thomas melnick
Subject: Re: K&S Subcontractor no-show
Jeff,
As a follow up to this:
EFTA00645595
Here are some numbers :
To date we do not owe K&S anything currently. They need to finish some work that was not completed.
We have a pending change order that has NOT been approved for $9,730 for manufacture breezeway doors
and to manufacture the shutters for the chillax bathroom. We also have a change order for to redo the
bathroom windows and the additional breezeway doors plus installation of both for $10,600.
At this point we should not put up with the BS K&S is giving us. Yes, they do good work but they show up
when they want to which is unacceptable especially when we have a tight deadline.
My contact in Puerto Rico can have two very highly skilled millworkers over here tomorrow for $9k for
40hrs of work ($75 /hour ), airfare (approx. $600), per diem ($35/ day), and 15% overhead/profit ($ lk),
accommodations would be about $400.
We would put these two guys on getting the chillax bathroom, breezeways doors done.
Marc
Jeff,
The K&S guys did not show up this morning and wanted to propose bringing in two guys from a company
that have dealt with in Puerto Rico. With this guy not showing up, the millwork that still needs to be
completed by the time of your arrival won't be done.
I am getting the pricing together now and have the two guys on hold awaiting the approval. We will bill
back K&S for this as he knows this is crunch time and not to show up is unacceptable.
Please let me know if this ok to proceed.
Thanks
Marc
EFTA00645596
ℹ️ Document Details
SHA-256
d3ce255d40eafd653e82a48a75244944e0f9dd89a20da80ffc3005d19ae60f57
Bates Number
EFTA00645595
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0